RN Frigates: Type 26 City Class

Add your posts about Royal Navy ships in this section
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: RN Frigates: Type 26 City Class

Unread post by jbryce1437 »

Thanks for the update David. So there will be two HMS Belfasts.

Jim
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Frigates: Type 26 City Class

Unread post by ivorthediver »

Thanks for the update David
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20053
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Frigates: Type 26 City Class

Unread post by Pelican »

jbryce1437 wrote: ↑Wed Aug 07, 2019 7:30 pm Thanks for the update David. So there will be two HMS Belfasts.

Jim
Yes and No Jim - "The original HMS Belfast, which took part in the Arctic campaign and the Normandy landings, will now be renamed "HMS Belfast 1938" to avoid confusion."
Please see - https://www.forces.net/news/navy/new-ro ... ms-belfast
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Blackbat242
Posts: 112
Joined: Mon Jun 10, 2019 5:15 am

Re: RN Frigates: Type 26 City Class

Unread post by Blackbat242 »

ivorthediver wrote: ↑Fri Jun 28, 2019 6:09 pmDelighted to witness these advances but am very wary of the fuse blowing at a critical point , when in the olden days it was Jar tar and his able team of oppo's , but thats advancement based on a perfect world of events.
See BB-57 USS South Dakota at the Second Naval Battle of Guadalcanal on 14-15 November 1942...
https://en.wikipedia.org/wiki/USS_South ... uadalcanal
at about 23:30, an error in the electrical switchboard room knocked out power aboard South Dakota, disabling her radar systems and leaving the ship all but blind to the Japanese vessels approaching the force.
Yeah... the "error" was that because some breakers had a tendency to trip excessively, a Chief tied a couple of circuit breakers closed so when they took a hit it caused a short instead of just being able to re-close the breakers. It overloaded a lot of things rather than just the affected system, tripped several breakers, and required time to restore.
SGT USMC '81-'89 VMA(AW)-121, VMA(AW)-242, CV-61 AIMD
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Frigates: Type 26 City Class

Unread post by ivorthediver »

Exactly Jon , and an accident awaiting to happen I fear but pray I'm wrong , thanks for the post .
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20053
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Frigates: Type 26 City Class

Unread post by Pelican »

It’s full steam ahead for new digital-first naval frigates

Versatile, agile and quiet, BAE’s technically advanced Type 26 ship is a rapid export success

It’s only two years since first steel was cut on HMS Glasgow, Britain’s most advanced warship and one of eight Type 26 frigates ordered for the Royal Navy. In that time, the country has gone through four defence secretaries.

The ritual that begins a vessel’s construction process was performed on Glasgow in her home city by Sir Michael Fallon. For a man who cultivated a reputation for being a steady hand on the tiller, Sir Michael was dropped amid allegations that he was a little too handsy. Gavin Williamson, his replacement, was dropped for reportedly being too leaky and Penny Mordaunt for being insufficiently Brexity, leaving Ben Wallace, a former Scots Guard, at the helm.

Yet even Mr Wallace won’t be following in Sir Michael’s footsteps at the Govan shipyard tomorrow. The honours at a ceremonial cutting of steel for HMS Cardiff, the second Type 26 ship, will go to Anne-Marie Trevelyan, the new minister for defence procurement (the fifth such minister in three years and proof, if it were needed, that hers is an equally fast-moving brief).

Pride of place, though, goes to the Type 26 itself. With the 2,100 workers on the Clyde busy on the first batch of frigates, a three-strong order valued at £3.7 billion, and while their bosses at BAE Systems fret over an absence of continuity at the top of the Ministry of Defence, especially as the expected second batch of five more Type 26s has yet to be confirmed, the vessel at the centre of it all is already an export success.

Australia has signed up to BAE’s Type 26 design and will build nine of them as Hunter-class combat ships at BAE’s Adelaide yards. Canada will build 15 of the vessels under licence in Nova Scotia. New Zealand, it is reckoned, will sign up for as many as three. The only blot on the seascape is the Americans, who won’t be ordering despite the pledges of Boris Johnson when he was foreign secretary that he would be able arm-twist President Trump.

As Steve Timms, managing director BAE Naval Ships, acknowledged: “We thought we were only going to build eight and now we have thirty-two.”

The Type 26 is the successor to the Type 23 frigate, which first went into commission 30 years ago. One of those is HMS Montrose, which was deployed to the Strait of Hormuz recently in an attempt to protect UK-flagged shipping in the Persian Gulf.

The transition to the Type 26 will start when HMS Glasgow goes into service in the mid-2020s. Her main tasks will include searching for Russian submarines and defending Britain’s nuclear-armed submarine fleet. She also will sail in flotilla with the navy’s two new aircraft carriers and is designed for use in humanitarian missions.

Mr Timms, a 38-year BAE veteran, has been in charge of Govan’s Type 26 production since the turn of the year. “Type 26 is the most advanced, capable and versatile complex warship ever designed or built,” he said. “We are building a very quiet ship that accelerates, is very agile, which performs at pace.”

In oceans where it doesn’t want to be seen or heard, the 150m frigate claims a sonic footprint equivalent to a small fishing trawler.

It is the first time that BAE has built a boat digitally. In its web-enabled drawing office, costs and issues can be eliminated far earlier and a vessel existing in cyberspace can be redesigned by countries that want to install their own radar and weapons and sold to them before the steel is first cut.

This design technology, Mr Timms conceded, had “not been without its challenges” at a time when Govan had struggled to build on time and on budget the Royal Navy’s order for offshore patrol vehicles. “It has been challenging because capability [people and management] had been lost in the last decade,” Mr Timms said. “We understand that and understand, too, there had been supply chain obsolescence.”

While Govan’s future appears assured, there are greater prizes. Built in 57 modules, the Type 26 is designed to be adaptable all the way up to incorporating the sort of firepower that would make it the blueprint to succeed the Royal Navy Type 45 fleet of destroyers. Conversely, it is a design that can be dumbed-down to the level of a general purpose frigate envisaged by the ministry as the new discount £250 million-a-time Type 31e boats.

“We have a generational opportunity allowing us to take on apprentices with the promise of two decades of work ahead of them,” Mr Timms said. “This is not something we have been able to say for a few years.”

Behind the story
They have been building boats on the Clyde for centuries (Robert Lea writes). When the Industrial Revolution began, Govan helped to make Clydeside a global powerhouse.

As a port facing the Americas, Glasgow was already big in tobacco and cotton when the city fathers dredged the Upper Clyde to bring in the largest ships. With local iron ore and coal aplenty, Glasgow became one of the steelworking fulcrums of the empire.

In the 1850s, John Elder produced the genius of the marine steam compound engine, allowing ships to travel farther on less fuel. He also was the father of the Fairfields yard — Govan as now — pioneering integrated shipbuilding, constructing the fastest ships.

The postwar history of Govan, however, is the story of British shipbuilding. Little work and Far East competition ended up in the near-collapse of the industry, the amalgamation of fellow strugglers, nationalisation in the 1970s and then privatisation in the 1980s. Govan and Scotstoun, its downstream sister yard, found their way into the hands of BAE Systems via Kvaerner and Marconi.

Govan’s latest ships claim to be 80 per cent-built from the UK supply chain, with Rolls-Royce engines, David Brown gearboxes from Huddersfield, GE motors from Rugby and half the steel by value coming from British mills. Of Govan’s possible future building warships for England in a Scotland outside the UK, a spokesman for the yard says: “Critical skills are here in Govan. You cannot just pick this up and drop it somewhere else.”

From todays' Times
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20053
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Frigates: Type 26 City Class

Unread post by Pelican »

HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20053
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Frigates: Type 26 City Class

Unread post by Pelican »

Sounds as tho the Pokers will have a quiet time.

Powering the stealthy submarine hunter – Type 26 frigate propulsion system in focus

The Type 26 frigate is widely accepted as the best anti-submarine warship design available in the world right now. The quiet propulsion system that limits noise radiated from the ship is a key part of its ability to detect submarines. Here we take an overview of this very technical subject.

At more than £1Billion each, the Type 26 is a very expensive frigate, a significant part of that cost is driven by the need for stealth. Noise reduction is achieved by a combination of engineering solutions than include hull shaping, internal pipework design and securing equipment throughout the ship on shock and vibration-resistant mountings. But by far the greatest challenge is to ensure the engines and gear train can propel the ship quietly. The RN and British industry is already building from a position of experience and knowledge with the Type 23 frigates that set a new benchmark for warship stealth when they were introduced in the early 1990s.

Continues with homework etc. at - https://www.savetheroyalnavy.org/poweri ... hlO7oBnMAc
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Frigates: Type 26 City Class

Unread post by ivorthediver »

Very interesting post David and covers many topics and hot chestnuts , thanks for posting it .
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20053
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Frigates: Type 26 City Class

Unread post by Pelican »

A quiet Hunter - Royal Australian Navy's Future Frigate

Valued at $35 billion over its program life, Navy’s Future Frigate project, Sea 5000 Phase 1, is second only to Future Submarine in terms of cost to the Australian taxpayer.
Navy will receive nine Hunter class frigates, built in South Australia to BAE System’s Global Combat Ship (GCS) design and, although optimised for the Anti-Submarine Warfare (ASW) role, they are intended to be equally adept at Air Warfare and a number of other roles.
A number of sovereign features will separate the Hunter variant of the GCS from the UK’s City class ASW frigates (Type 26), including integration of CEA Technologies’ new generation CEAFAR2 radar, Lockheed Martin’s Aegis Combat System and an Australian tactical interface developed by Saab Australia.
The program calls for steel to be cut on the first vessel in Osborne in late 2022 with the lead ship, HMAS Flinders, launched in the 2027-2028 timeframe and entering service between 2029 and 2031.
The nine ships form part of the Commonwealth’s Continuous Naval Shipbuilding Strategy and will be built in three flights of three vessels, to ensure the design keeps abreast of rapidly evolving technology. Completion of the last frigate is not due to occur until the early 2040s and the class will form the backbone of Navy’s major surface combatant fleet for decades to com
The Hunter class will follow the Type 26 by around five years and will benefit from lessons learned during completion of at least the first two ships, before Flinders enters the water towards the end of the next decade.
Read more at https://www.australiandefence.com.au/ne ... zbtfSal.99
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”