Re: Current RN News and Updates
Posted: Fri May 16, 2025 1:13 pm
Royal Navy warship out of service dates revealed
The Ministry of Defence has provided an update on the planned out of service dates for Royal Navy ships, following a written question from Conservative MP Ben Obese-Jecty.
The response from Maria Eagle, Minister of State for the Ministry of Defence, clarified that while specific dates for individual ships are not released for operational security reasons, the Navy does provide dates by class.
According to Eagle, the Royal Navy constantly reviews the out of service dates to ensure maximum availability for operational tasking. This approach allows flexibility in managing the fleet’s readiness while maintaining security.
“For operational security reasons, the Royal Navy does not release the out of service dates of individual platforms,” stated the Minister.
Dates by Ship Class
The following list details the planned out of service dates for various classes of Royal Navy ships:
Queen Elizabeth Class (Aircraft Carriers): 2069
Albion Class (Amphibious Assault Ships): 2025
Daring Class (Type 45 Destroyers): 2038
Duke Class (Type 23 Frigates): 2035
Wave Class (Tanker Ships): 2025
Tide Class (Fleet Tankers): 2040
Bay Class (Landing Ship Dock): 2034
Fort Class (Replenishment Ships): 2028
Hunt Class (Mine Countermeasure Vessels): 2031
Sandown Class (Mine Countermeasure Vessels): 2025
River Class (Offshore Patrol Vessels):
Batch 1: 2028
Batch 2: 2040
The future
The Royal Navy is currently undergoing a comprehensive modernisation programme, with several advanced warships and submarines in various stages of construction and planning. The Type 26 frigates, also known as the Global Combat Ships, are designed primarily for anti-submarine warfare and multi-mission operations. Eight ships are planned, with the first vessel, HMS Glasgow, already launched. Subsequent ships, including HMS Cardiff and HMS Belfast, are under construction. These frigates feature a stealth design, vertical launch missile systems, and a mission bay for modular payloads, along with hangars to accommodate helicopters and drones.
The Type 31 frigates, also known as the Inspiration class, are intended for general-purpose missions and global deployment. Five of these vessels are being constructed at the Rosyth shipyard, with entry into service expected to begin in 2027.
The Royal Navy is also developing future surface combatants, including the conceptual Type 32 frigates and the Type 83 destroyers. The Type 32 frigates are being designed to support autonomous systems and protect territorial waters, with an emphasis on modularity. These ships are currently in the concept phase. The Type 83 destroyers are intended to succeed the Type 45 class, focusing on advanced air-defence capabilities, including potential ballistic missile defence. These destroyers are in the design and development phase, with an anticipated service entry in the late 2030s.
In addition to surface combatants, the Royal Navy is expanding its support and amphibious capabilities. The Multi-Role Strike Ships (MRSS) will provide amphibious warfare, humanitarian assistance, and logistics support. Up to six ships are planned, with the program currently approved and procurement processes underway.
The Fleet Solid Support (FSS) ships are designed to resupply naval vessels with ammunition, food, and other supplies at sea, particularly in support of carrier strike groups. Three ships are planned, with construction expected to begin in 2025 and the first ship anticipated to enter service by 2031.
Source https://ukdefencejournal.org.uk/royal-n ... -revealed/
Sir Humphrey@pinstripedline
Interesting snippet here - RFA FORT VICTORIA to pay off by 2028, despite her replacement being years away from completion. The RN faces many years of a 'store ship gap' and being 100% reliant on foreign navies for solid support, until FSS arrives.
For context, next RFA FSS ISD is 2031 - thats 3-4 years of gapping - a dire state of affairs for a navy that until 2010 had four solid support ships in service.
The Ministry of Defence has provided an update on the planned out of service dates for Royal Navy ships, following a written question from Conservative MP Ben Obese-Jecty.
The response from Maria Eagle, Minister of State for the Ministry of Defence, clarified that while specific dates for individual ships are not released for operational security reasons, the Navy does provide dates by class.
According to Eagle, the Royal Navy constantly reviews the out of service dates to ensure maximum availability for operational tasking. This approach allows flexibility in managing the fleet’s readiness while maintaining security.
“For operational security reasons, the Royal Navy does not release the out of service dates of individual platforms,” stated the Minister.
Dates by Ship Class
The following list details the planned out of service dates for various classes of Royal Navy ships:
Queen Elizabeth Class (Aircraft Carriers): 2069
Albion Class (Amphibious Assault Ships): 2025
Daring Class (Type 45 Destroyers): 2038
Duke Class (Type 23 Frigates): 2035
Wave Class (Tanker Ships): 2025
Tide Class (Fleet Tankers): 2040
Bay Class (Landing Ship Dock): 2034
Fort Class (Replenishment Ships): 2028
Hunt Class (Mine Countermeasure Vessels): 2031
Sandown Class (Mine Countermeasure Vessels): 2025
River Class (Offshore Patrol Vessels):
Batch 1: 2028
Batch 2: 2040
The future
The Royal Navy is currently undergoing a comprehensive modernisation programme, with several advanced warships and submarines in various stages of construction and planning. The Type 26 frigates, also known as the Global Combat Ships, are designed primarily for anti-submarine warfare and multi-mission operations. Eight ships are planned, with the first vessel, HMS Glasgow, already launched. Subsequent ships, including HMS Cardiff and HMS Belfast, are under construction. These frigates feature a stealth design, vertical launch missile systems, and a mission bay for modular payloads, along with hangars to accommodate helicopters and drones.
The Type 31 frigates, also known as the Inspiration class, are intended for general-purpose missions and global deployment. Five of these vessels are being constructed at the Rosyth shipyard, with entry into service expected to begin in 2027.
The Royal Navy is also developing future surface combatants, including the conceptual Type 32 frigates and the Type 83 destroyers. The Type 32 frigates are being designed to support autonomous systems and protect territorial waters, with an emphasis on modularity. These ships are currently in the concept phase. The Type 83 destroyers are intended to succeed the Type 45 class, focusing on advanced air-defence capabilities, including potential ballistic missile defence. These destroyers are in the design and development phase, with an anticipated service entry in the late 2030s.
In addition to surface combatants, the Royal Navy is expanding its support and amphibious capabilities. The Multi-Role Strike Ships (MRSS) will provide amphibious warfare, humanitarian assistance, and logistics support. Up to six ships are planned, with the program currently approved and procurement processes underway.
The Fleet Solid Support (FSS) ships are designed to resupply naval vessels with ammunition, food, and other supplies at sea, particularly in support of carrier strike groups. Three ships are planned, with construction expected to begin in 2025 and the first ship anticipated to enter service by 2031.
Source https://ukdefencejournal.org.uk/royal-n ... -revealed/
Sir Humphrey@pinstripedline
Interesting snippet here - RFA FORT VICTORIA to pay off by 2028, despite her replacement being years away from completion. The RN faces many years of a 'store ship gap' and being 100% reliant on foreign navies for solid support, until FSS arrives.
For context, next RFA FSS ISD is 2031 - thats 3-4 years of gapping - a dire state of affairs for a navy that until 2010 had four solid support ships in service.