RN Aircraft Carriers: Queen Elizabeth Class

Add your posts about Royal Navy ships in this section
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by ivorthediver »

Crossing "T"'s and dotting "i" me thinks Harry good for them [ not so sure about the lift though but it would only be a matter of time before it happened so at least we would know eh Harry.]
"What Ever Floats your Boat"
User avatar
Little h
Posts: 1746
Joined: Sun Aug 12, 2018 6:53 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Little h »

Little h wrote: ↑Mon Nov 19, 2018 4:33 pm
... and this comment from the RN Twitter account (also linked above):-

Brian James @TheEagleScout 1h1 hour ago
Replying to @RoyalNavy @HMSQnlz

Now lets land directly on the elevator to further reduce cycle time. I'm a Lean Six Sigma expert, can I fly out and help you remove waste from your process?
------------------------------
That comment raised the following questions in my mind:-
Should we presume that the side elevator raising and lowering equipment would not be sufficiently robust to take a F35B directly from the hover?
I'm fairly certain that I placed on the WNSF a post relating to 'side elevator static weight testing being conducted' - can't remember what they are rated at - but probably got the image stored in my laptop though.
Well at least I've remembered that the were designed and manafuctured by MacTaggart Scott and utilise Rexnord chains.


Here it is (though not with the image of the static load test(s) :oops: )......

Two 70 ton SWL lifts supplied to both Queen Elizabeth Class vessels
31/10/2018

MacTaggart Scott was contracted to design and supply two aircraft lifts for each of the Royal Navy aircraft carriers, HMS Queen Elizabeth and HMS Prince of Wales.

At 70 ton Safe Working Load, these are the largest lifts that the company has supplied. The lifting platform itself weighs 150 tons, so the total load is some 220 tons. Each lift has its own independent hydraulic power unit.

For an aircraft carrier, the aircraft lifts are mission critical. They need to be reliable, safe and available. Operation must be smooth and the platform must stop level with the flight deck and hangar deck for ease of handling the aircraft.

Source; MacTaggart Scott
Little h
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

Q.E. ~ Savetheroyalnavy.org

HMS Queen Elizabeth is due to sail from Portsmouth tomorrow to Scotland for 6 week dry-docking in Rosyth. QE has been in the water since 2014 and is due a hull inspection.
This article (from June 2017) describes the challenges of HMS Queen Elizabeth exiting the basin at Rosyth. This complex procedure now has to be reversed.

https://www.savetheroyalnavy.org/hms-qu ... qT-Ciu5grs

Reminder, for seeing departure see:
From the mizzen mast of HMS Warrior comes a brand new high definition webcam that streams stunning views of Portsmouth Harbour and Gosport. After a short hiatus, the Warrior webcam makes a welcome return as you spy Royal Navy ships across the Camber and inside Portsmouth Naval Base.
The Warrior camera pans between 7am and 5pm daily in all weathers taking in the surrounding area in high fidelity.
https://www.historicdockyard.co.uk/warr ... 77NkwjxKJU
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by ivorthediver »

Very enjoyable David , but what is the crenelated building in the shot after viewing the QE2 flight deck with the building behind which appears to be called Drystack ? to the right of the building .
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

ivorthediver wrote: ↑Sun Mar 31, 2019 4:07 pm Very enjoyable David , but what is the crenelated building in the shot after viewing the QE2 flight deck with the building behind which appears to be called Drystack ? to the right of the building .
U'll need to ask a local Ivor - I was Chatham and I don't that anymore especially St. Mary's Is. but at least there is a gin distillery in the dockyard!
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by ivorthediver »

Well if thats the case you will know where to find me if I go missing whilst down there :)
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

For info - Q.E.s Departure yesterday - why no Procedure Alfa?

Michael S Murray: We don’t do procedure A as routine. It’s done on very first entry to port (from build) and on leaving or returning from deployment. QE is just under taking normal working routines now.
David Gray: We only used Procedure Alpha on departure or return from major deployments - this is just a routine sailing by Queen Elizabeth?
James Waller Routine: sailing, not ceremonial. No need for it.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Little h
Posts: 1746
Joined: Sun Aug 12, 2018 6:53 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Little h »

QE R08 back in Firth of Forth for Rosyth drydock


NavyLookout Retweeted
The Forth Bridges
‏ @TheForthBridges on Twitter
2h2 hours ago

HMS Queen Elizabeth passing under the Forth Road Bridge this morning
@HMSQNLZ @RoyalNavy @RNinScotland

, QE R08 back in Firth of Forth D3N6J8EWkAEdHK8.jpg


...... and


NavyLookout
‏ @NavyLookout on Twitter
22m22 minutes ago

.@HMSQNLZ passes under the Forth Bridge. She is now at anchor in the river awaiting appropriate tidal conditions to go back through the lock to the inner basin and to the dry dock where she was originally built.

Photo: CPO Tryon
, QE R08 back in Firth of Forth for Rosyth D3OWN6_W0AAV0W9.jpg
You do not have the required permissions to view the files attached to this post.
Little h
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

For info Q.E. is now dry docked at Rosyth for 6 weeks.

The contents of this link maybe of interest:
https://www.maritimejournal.com/news101 ... lpSTwsfz1g

A tight fit: https://twitter.com/NickCP_RN/status/11 ... 7BM261izEg
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”