RN Aircraft Carriers: Queen Elizabeth Class

Add your posts about Royal Navy ships in this section
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by ivorthediver »

Well Harry I'm not sure of my facts on this particular occasion, but the plated lifting capacity of any crane is for a dedicated reach /load , which due to the placing location of the load on the ship .... might be further away,.. hence the need for a larger crane with a greater reach may be the answer, which in this instance I agree looks like a sledge hammer to crack a nut ;)

I am sure on your coverage of facts on your computer you will have seen examples of this where the crane has toppled over even though the load could be lifted but not at the distance they tried to place the load , again its down to common sense , or in our country sheafs of H+S stipulations .

Now days Tower Crane's and indeed container port Cranes are fitted with a whole bank of computer devices which restrict the load lifted if outside of the limit of that particular crane's specifications
"What Ever Floats your Boat"
User avatar
Little h
Posts: 1746
Joined: Sun Aug 12, 2018 6:53 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Little h »

ivorthediver wrote: ↑Sat Mar 09, 2019 2:56 pm Well Harry I'm not sure of my facts on this particular occasion, but the plated lifting capacity of any crane is for a dedicated reach /load , which due to the placing location of the load on the ship .... might be further away,.. hence the need for a larger crane with a greater reach may be the answer, which in this instance I agree looks like a sledge hammer to crack a nut ;)
As you would expect Ivor I looked up the specifications of the crane types quoted in the article ... and; even with the assistance of comprehensive supporting diagrams etc., I still felt there was a dimension (pun intended) missing.

The issue of 'Terence' not being used could simply be down to the FAA types have driven 'him' back to a Naval Air Station for some reason. You will have observed that 'he' carries road legal military registration plates; so if the loggies have done their duty and kept 'him' current vis-a-vis road vehicle tax - then off 'he' could trundle ....... Aaah; but then one asks which entity of the 'heavy mob' might have been employed to lift 'him' off an aircraft side elevator on to the jetty??
Little h
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by ivorthediver »

Good Man Harry , and there Was I thinking that you may have not known something ......Huh fat chance eh ;)
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

Q.E.
Evidently you can see what is going on when the camera is panning:
Discover Portsmouth from up above
From the mizzen mast of HMS Warrior comes a brand new high definition webcam that streams stunning views of Portsmouth Harbour and Gosport. After a short hiatus, the Warrior webcam makes a welcome return as you spy Royal Navy ships across the Camber and inside Portsmouth Naval Base.
The Warrior camera pans between 7am and 5pm daily in all weathers taking in the surrounding area in high fidelity.
See - https://www.historicdockyard.co.uk/warr ... sWwlGASrOg
Also handy for other comings and goings?
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

P.o.W. Practice for 'under the bridges' :
https://twitter.com/HMSPWLS/status/1108035875617890305
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by jbryce1437 »

Looking forward to the big day in September

Jim
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

jbryce1437 wrote: ↑Tue Mar 19, 2019 8:28 pm Looking forward to the big day in September

Jim
Indeed Jim and then after sea trials and acceptance, both at sea together, then alongside at Pompey and then ... !?
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

Has the Royal Navy solved its manpower problems?
In bullish mood last week, the First Sea Lord told the Portsmouth News “we are through with relegating frigates and destroyers to training vessels due to a shortage of sailors”. This is an encouraging sign and here we examine the context and true extent of the improvement in RN personnel numbers.


The total combined strength of the Naval Service (including the Royal Marines, Reservists, the RFA and untrained personnel) now stands at 38,550 compared to 38,140 in 2016. In contrast to the RAF, and the Army in particular, the RN has managed to reverse the decline and grow its headcount in the last two years. The management of human resources is complex and not just about total numbers and these headline figures demand closer examination. The RN has done well to arrest the crisis that was precipitated by the disastrous government decision in the 2010 SDSR to make 5,000 sailors redundant. This deliberate reduction had the unintended, if entirely predictable, effect of damaging morale hastening more people to leave voluntarily. In 2016 the number of new recruits joining finally began to match or even slightly exceed outflow. (Outflow consists of Voluntary Outflow (VO) people resigning – on average about 60% of the total, plus people reaching the end of their service and those medically discharged).

There has been a reduction of about 60% since 2014 of RN personnel employed on tasks that breach the agreed harmony guidelines. This is partly due to the end of commitments in Afghanistan but also the result of a determined effort to put the needs of people first where ever possible. The few officially recorded as having breached harmony guidelines are the tip of a rather larger iceberg, as many personnel are still under great pressure despite technically having served in compliance with the guidelines. Improving morale and especially by ensuring sailors have adequate leave, is the primary solution to reducing the high levels of VO. There has been a small improvement in the VO rate in the last 5 years, from around 5.7% down to 5% of trained personnel each year.

Continues at - https://www.savetheroyalnavy.org/has-th ... EgW0u9sn6Q

But note further down:
The QEC aircraft carriers original core ships company was supposed to be just 690, but by the time HMS Queen Elizabeth deployed on Westlant 2018, numbers had grown to 800. The final crew requirement for the carriers is likely to move upwards in the light of experience. When the full Tailored Air Group is finally embarked it will only add to the burdens on crew workload. The small uptick in numbers will only benefit the escorts and is not enough to allow HMS Bulwark to be brought out of ‘low readiness’ and operate simultaneously with HMS Albion. Three RFA vessels also remain laid up on Merseyside. Total RFA personnel numbers have declined only very slightly in the last 5 years, (down by about 50 to about 1,540) but there is a particular shortage of marine engineers.

With HMS Queen Elizabeth due to go on operational deployment in 2021, the demand for escorts has never been greater. The announcement that the practice of having two ships laid up a ‘harbour training ships’ for lack of crews can be ended is timely and welcome. Precisely when this will be achieved may be hard to pinpoint due to the complex cycle of refits. In the longer term, both the Type 31e and Type 26 frigates will need a smaller ships company than the Type 23s they replace, helping reduce manning pressures.

Does anyone know the real truth?
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by jbryce1437 »

Pelican wrote: ↑Tue Mar 19, 2019 9:53 pm
jbryce1437 wrote: ↑Tue Mar 19, 2019 8:28 pm Looking forward to the big day in September

Jim
Indeed Jim and then after sea trials and acceptance, both at sea together, then alongside at Pompey and then ... !?
Will use smoke and mirrors to man them both. I can't see both being fully crewed with a full air wing at the same time. I also wonder if both can be berthed in Pompey at the same time.
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
Pelican
Posts: 20058
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: Queen Elizabeth Class

Unread post by Pelican »

jbryce1437 wrote: ↑Wed Mar 20, 2019 11:04 am
Pelican wrote: ↑Tue Mar 19, 2019 9:53 pm
jbryce1437 wrote: ↑Tue Mar 19, 2019 8:28 pm Looking forward to the big day in September

Jim
Indeed Jim and then after sea trials and acceptance, both at sea together, then alongside at Pompey and then ... !?
Will use smoke and mirrors to man them both. I can't see both being fully crewed with a full air wing at the same time. I also wonder if both can be berthed in Pompey at the same time.
Berthing both at the same time yes Jim:
"The more modern Victory Jetty is also be improved so that both ships can be in port simultaneously."
From - https://www.bbc.co.uk/news/uk-england-h ... e-39326028

For info:
https://insidedio.blog.gov.uk/2017/08/1 ... ital-role/

Crewing, seeing is believing, more robbing Peter to pay Paul?
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”