French Navy today

Add your posts about the French Navy in this section
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

Video: Aboard FDI at sea – The next generation frigate

https://www.navalnews.com/naval-news/20 ... n-frigate/
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: French Navy today

Unread post by Pelican »

Navy Lookout
French Marine Nationale naval aviation plan - aims to have UCAV on new aircraft carrier by 2040.
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

Mistral Class Amphibious Assault Ship Dixmude pictured on entry to Plymouth on May 28th 2025.
You do not have the required permissions to view the files attached to this post.
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

Durance Class Command and Replenishment Tanker Somme conducts a RAS with Mistral Class Amphibious Assault ship Dixmude during Exercise POLARIS 25.....June 2025.
You do not have the required permissions to view the files attached to this post.
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

Horizon Class Stealth Frigate Chevalier Paul pictured under refit at Arsenal Toulon in 2025.
You do not have the required permissions to view the files attached to this post.
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: French Navy today

Unread post by Pelican »

Royal Navy warships could be spared expensive time in dock after a pioneering link-up with France’s flagship.

Harnessing the latest underwater technology, the hull of the French Navy’s aircraft carrier FS Charles de Gaulle has been inspected – and cleaned – in the water, without the need for a lengthy and expensive period in dry dock, or expert divers with specialist equipment.

The ground-breaking project was overseen by Royal Navy exchange officer Lieutenant Cam Dalley who’s assigned to the 41,000-tonne carrier.

It’s one of several joint projects involving the two navies under the Lancaster House Agreement between London and Paris.

In this instance, the Briton and his team were asked to look at ways of saving time, money and effort to keep the nuclear-powered carrier’s hull clean.

Hull fouling, caused by bio growth on underwater surfaces, reduces a vessel’s efficiency and speed – and increases fuel consumption.

The solution has either been to send divers down to painstakingly remove the fouling – or else take a ship out of the water, and blast the growth off in dry dock.

But Lieutenant Dalley said recent advancements in Remotely Operated Vehicles (ROVs) allowed both surveys and cleaning to be conducted in the water – and turned to the latest developments in industry and commercial shipping.

“We need to catch up with what industry is pioneering to keep costs down,” Cam explained. “The technology represents a step-change in preventive maintenance: allowing our ships to maintain desired speeds whilst lowering fuel consumption in a more efficient and sustainable manner.

“What’s even more impressive is the capacity to automate the procedure using the robot’s memory from previous cleans.”

Continues https://www.royalnavy.mod.uk/news/2025/ ... g-warships
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Brian James
Posts: 13231
Joined: Sun Aug 12, 2018 6:58 am

Re: French Navy today

Unread post by Brian James »

Durance Class Command & Replenishment Tanker Somme pictured with USS Gerald R. Ford, North Atlantic in September 2025.
You do not have the required permissions to view the files attached to this post.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: French Navy today

Unread post by Pelican »

In focus: France’s future aircraft carrier

Here we look at the French Navy’s ambitious project to construct a 75,000-tonne nuclear-powered, conventional aircraft carrier for delivery in the late 2030s

Background
In 2018 the Marine Nationale launched four studies into replacing its existing aircraft carrier, the FS Charles de Gaulle (CDG). The French government subsequently confirmed they would build another nuclear-powered vessel, the Porte Avions de Nouvelle Génération (PA-Ng) in 2020. For English-speaking audiences, the project is sometimes referred to as the Future French Carrier (FFC).

While French public finances are in an even more dire state than those of Britain, the MN benefits from well-managed defence procurement and a long-term defence industrial strategy far superior to chaotic UK practice. The MN has navigated the usual tired arguments that aircraft carriers are obsolete, too expensive etc. and succeeded in getting political support and approval for this mammoth project. The budget for FFC design and construction is officially €6 billion although most accept that €8 billion or more is realistic.

The project is now in the second of two de-risking and feasibility phases running from 2021 up to the end of 2025. The preliminary design phase concluded in early 2023 and was followed by the programme definition phase, which will run until late 2025 ahead of the System Functional Review. The first iteration of the design was unveiled in 2020 but this was significantly altered by 2022. The single unified ‘witches hat’ mast above the island (A feature of the FTI frigates) has been replaced with a more conventional arrangement. The hull form and flight deck layout has also evolved substantially and it should be emphasised that the design continues to develop and the final ship may look considerably different to the imagery published so far.

The detailed design phase will begin in 2025 through to 2032 although some manufacturing will start well in advance of 2032. The commitment to the programme was demonstrated by the placing of contracts for long lead items in April 2024. This included elements of the nuclear propulsion system and preparatory infrastructure work at the Chantiers de l’Atlantique shipyard.

The main construction and assembly will take place between 2032-35 with initial sea trials on nuclear power in early 2036. If this timetable can be met, then the ship is scheduled to commission in 2038.

Continues https://www.navylookout.com/in-focus-fr ... t-carrier/

Also see https://ukdefencejournal.org.uk/france- ... t-carrier/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “French Navy”