Add to that the CAD design and ship build programmes currently in use showed working " corner cutting" whilst under close examination , which I am sure our "Guru" Harry would be happy to endorse , and also Harry brought to light questions on seals on water tight doors and watertight seals I seem to recall all of which lead to questions being asked of the ships building consortium responsible , all of which has gone very quite in the passage of time since the accident , and I am sure that should you PM Harry... he could offer greater detail than this member of the Forum bless him
General Naval Topics
- ivorthediver
- Posts: 3729
- Joined: Fri Aug 10, 2018 8:42 pm
- Location: Cambridge Shore Battery
Re: General Naval Topics
A valid point GD , coupled with the fact that most earlier British ships steel plates were "steeped" before plating which I was given to understand was as good as galvanisation of the metal ,which presumably went out of the window when welding took over as the norm .
Add to that the CAD design and ship build programmes currently in use showed working " corner cutting" whilst under close examination , which I am sure our "Guru" Harry would be happy to endorse , and also Harry brought to light questions on seals on water tight doors and watertight seals I seem to recall all of which lead to questions being asked of the ships building consortium responsible , all of which has gone very quite in the passage of time since the accident , and I am sure that should you PM Harry... he could offer greater detail than this member of the Forum bless him
Add to that the CAD design and ship build programmes currently in use showed working " corner cutting" whilst under close examination , which I am sure our "Guru" Harry would be happy to endorse , and also Harry brought to light questions on seals on water tight doors and watertight seals I seem to recall all of which lead to questions being asked of the ships building consortium responsible , all of which has gone very quite in the passage of time since the accident , and I am sure that should you PM Harry... he could offer greater detail than this member of the Forum bless him
"What Ever Floats your Boat"
- Little h
- Posts: 1746
- Joined: Sun Aug 12, 2018 6:53 pm
Re: General Naval Topics
Re. and also Harry brought to light questions on seals on water tight doors and watertight seals I seem to recall all of which lead to questions being asked of the ships building consortium responsibleivorthediver wrote: ↑Wed Nov 20, 2019 5:13 pm A valid point GD , coupled with the fact that most earlier British ships steel plates were "steeped" before plating which I was given to understand was as good as galvanisation of the metal ,which presumably went out of the window when welding took over as the norm .![]()
Add to that the CAD design and ship build programmes currently in use showed working " corner cutting" whilst under close examination , which I am sure our "Guru" Harry would be happy to endorse , and also Harry brought to light questions on seals on water tight doors and watertight seals I seem to recall all of which lead to questions being asked of the ships building consortium responsible , all of which has gone very quite in the passage of time since the accident , and I am sure that should you PM Harry... he could offer greater detail than this member of the Forum bless him![]()
- If memory serves me correctly; my references to watertight integrity in the cases of 1) HMS Nottingham (D91) grounding and 2) NoMS Helge Ingstad (F313) collision and grounding, related not to the watertight doors and/or seals but rather to the lack of watertight integrity of bulkhead fittings and the migration of water through/along a) electric cables (Nottingham) and b) prop shafts and seals (Helge Ingstad).
I believe that the only time doors 'were in the frame' (pun intended
Late edits
a) Nottingham
Other damage included contamination of water tanks, fueland lube oil systems, aviation fuel, one engine room floodedwhich then flowed into a gearbox. Up front, water in twomagazines, a mess deck full of water, electronic compartments and storerooms were lost to flooding. It is amazing where water had got in and yet how the ship had survived. The water even leaked up the inside of cables and shorted out switchboards. Still, it says something aboutwarship designs and systems. Also it says a lot about the crew’s skills and tenacity. The RN has a proud heritage andthey were not going to lose a warship without a fight!
Source of excerpt The Australian Naval Architect ANA Volume 6 Number 3 August 2002 (pages 23/24 of 52)
b) Helge Ingstad
Ingstad suffered flooding in three of its watertight compartments, but the crew believed they could keep it afloat despite the damage. Unfortunately, water from the flooded aft generator room was quickly pouring into the gear room via the hollow propeller shafts, and from the gear room the water flowed into the forward and aft engine rooms. This doomed Ingstad’s ability to stay afloat, ultimately leading to the ship’s sinking. The AIBN report warns that this is a “safety critical issue” that somewhat ominously “must be assumed to also apply to the other four Nansen-class frigates."
Source of excerpt Popular Mechanics
Little h
- ivorthediver
- Posts: 3729
- Joined: Fri Aug 10, 2018 8:42 pm
- Location: Cambridge Shore Battery
Re: General Naval Topics
Thanks for the clarification Harry , all of which supported his enquiry so very grateful and hope this aids his post ... 
"What Ever Floats your Boat"
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
THEY ARE CHANGING GUARD AT BUCKINGHAM PALACE
IF YOU want to see sailors then London is the place to be as much as Portsmouth, Plymouth and Faslane over the next month.
From Monday for four weeks Royal Navy personnel will be guarding the Royal palaces – a duty performed only once by the Senior Service since the days of the Spanish Armada.
Men and women from the Surface Fleet, Submarine Service, Fleet Air Arm and RN establishments across the land passed their final inspection yesterday after weeks of intensive training.
They will mount Guards from November 25 to December 19 at Buckingham Palace, Windsor Castle, St James Palace and the Tower of London.
It is only two years since sailors last performed the task, but before then you have to go back to 1587 when the previous Queen Elizabeth was on the throne and Sir Walter Raleigh was Captain of the Guard.
From Navy News
P.S. Wotch it!
IF YOU want to see sailors then London is the place to be as much as Portsmouth, Plymouth and Faslane over the next month.
From Monday for four weeks Royal Navy personnel will be guarding the Royal palaces – a duty performed only once by the Senior Service since the days of the Spanish Armada.
Men and women from the Surface Fleet, Submarine Service, Fleet Air Arm and RN establishments across the land passed their final inspection yesterday after weeks of intensive training.
They will mount Guards from November 25 to December 19 at Buckingham Palace, Windsor Castle, St James Palace and the Tower of London.
It is only two years since sailors last performed the task, but before then you have to go back to 1587 when the previous Queen Elizabeth was on the throne and Sir Walter Raleigh was Captain of the Guard.
From Navy News
P.S. Wotch it!
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
-
Brian James
- Posts: 13231
- Joined: Sun Aug 12, 2018 6:58 am
Re: General Naval Topics
Type 22 Frigate HMS Cornwall fires a Sea Wolf missile from her forward launcher, April 2009.
You do not have the required permissions to view the files attached to this post.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Election 2019: In search of the Royal Navy’s political friends
Predictably, serious discussion of defence policy has been almost absent from an Election campaign dominated by Brexit and the NHS. Here we analyse the manifesto promises of the main political parties in regards to defence and the RN in particular.
Continues at - https://www.savetheroyalnavy.org/electi ... IV9kai4jjA
Conclusion
For the minority of the electorate with a real concern about the future defence and security of the UK and its allies, the political landscape is far from reassuring. There are question marks over the integrity of Boris Johnson and whether his natural optimism and bluster would make for sound leadership in the event of an international crisis. That said, any reservations about Boris pale beside the frightening prospect of Corbyn, McDonnell and Abbot in control. Despite their poor track record, especially between 2010-17, one must reluctantly conclude, on defence issues at least, the Tories are in pole position, given the alternatives.
Predictably, serious discussion of defence policy has been almost absent from an Election campaign dominated by Brexit and the NHS. Here we analyse the manifesto promises of the main political parties in regards to defence and the RN in particular.
Continues at - https://www.savetheroyalnavy.org/electi ... IV9kai4jjA
Conclusion
For the minority of the electorate with a real concern about the future defence and security of the UK and its allies, the political landscape is far from reassuring. There are question marks over the integrity of Boris Johnson and whether his natural optimism and bluster would make for sound leadership in the event of an international crisis. That said, any reservations about Boris pale beside the frightening prospect of Corbyn, McDonnell and Abbot in control. Despite their poor track record, especially between 2010-17, one must reluctantly conclude, on defence issues at least, the Tories are in pole position, given the alternatives.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
From Save the Navy dated 8th December 2019
Maintenance problems for the Royal Navy mount up
The delivery of the RN’s second aircraft carrier has deservedly been celebrated as a great success for British industry but behind the scenes, in the naval bases and shipyards, all is not well. 2019 has seen a number of important maintenance projects stalled or delayed. Here we summarise the situation.
Delays to naval construction and refit work are nothing new. A couple of projects behind schedule would not be especially remarkable but the news that the Type 45 destroyer engine upgrade has been postponed means the number of RN upkeep and construction projects suffering significant delays has now reached at least six.
(1) The Power Improvement Project (PIP) project is a £160M contract which was awarded to BAE Systems in March 2018 and will eventually cure the propulsion problems of all six Type 45 destroyers. (The MoD and Defence Minister, Geoff Hoon, not BAES took the decision to risk selecting the unproven WR-21 Gas Turbines back in 2000 that is at the root of the propulsion issues.) Cammell Laird has been sub-contracted by BAES to do the heavy engineering work required to remove the destroyer’s two diesel generators and replace them with 3 more powerful units. CL was expecting the first ship, HMS Dauntless, to arrive on Merseyside to begin the work in this Autumn but the start of the work has now been postponed at least six months, until late March 2020.
BAES say they are not at liberty to comment and the MoD would not offer us any explanation other than to promise “The first of class PIP conversion is expected to complete in 2021 as planned”. To put this in context, HMS Dauntless was reputed to have experienced the worst of the propulsion problems suffered by the class. After serving for just 6 years she was laid up in early 2016, ostensibly to save manpower, and then started a lengthy major refit in Portsmouth in early 2018 which included preparation for the PIP. Delays to this preparatory work are the reason she will not be towed north before the Spring. If the re-engine project proceeds smoothly once underway, we might expect Dauntless to rejoin the fleet at the end of 2021 after nearly six years of unavailability. There will likely be a knock-on effect for the other 5 ships than need to undergo the PIP, although the MoD says the timing of the work will be “dependent on the availability of ships to undertake the conversion, balanced against the Royal Navy’s standing and future operational commitments”.
HMS Daring remains laid up and inactive but other Type 45s, HMS Defender, Duncan and Dragon have participated in very successful deployments across the globe during 2019.
(2) As we reported in more detail earlier in the year, HMS Vanguard will not be ready for sea early in 2020 as originally scheduled. As of December 2019, she remains in dry dock at Devonport, shrouded in scaffolding with the Reactor Access House (RAH) still in place over her reactor compartment indicating the refuelling process is still incomplete. As a consequence, there will be inevitable adjustments to the planned maintenance schedules and routine of the other 3 boats. HMS Victorious is the next boat due to have her LOP and may have to conduct additional patrol(s) while really in need a major refit.
(3) Entry into service of the 4th Astute-class submarine, HMS Audacious has been delayed by 17 months putting further pressure on the RN’s vitally important SSN force. The problems are of a serious technical nature and will impact on the delivery of the following 3 boats. This is a new construction rather than an upkeep issue but no explanation or justification for this serious setback has been made public. Those accountable are conveniently shielded by the veil of secrecy around the submarine enterprise.
(4) The major Life Extension (LIFEX) programme for the Type 23 frigates is also running well behind schedule. Currently, 7 frigates, more than half of the force, are in Devonport either undergoing work or in the queue awaiting refit. The failure to replace the Type 23s sooner will have ever-increasing cost implications. Examination of some of the older ships has revealed serious structural problems that require additional rectification and expense. For example, HMS Lancaster required 200 separate steel inserts in her hull to make her seaworthy and HMS Iron Duke is known to have arrived in an even poorer material state.
HMS Richmond is the first frigate to receive a new generation of diesel generators and a fully-modernised control and surveillance system under the PGMU project. Richmond’s ships company moved on board in July but she has still not left the basin, although there are indications she might finally sail on sea trials just before Christmas. As one of the two oldest frigates, HMS Lancaster is not receiving the engine upgrade but has almost completed her LIFEX and should return to her homeport of Portsmouth in December.
(5) RFA Tidespring also remains at Cammell Laird after her planned “4-month” Lloyds certification hull inspection and “minor maintenance package” which began in February has now gone beyond 10 months. Neither the contractor or the MoD will offer any explanation, although it is known that the inspections have uncovered unforeseen issues while CL are having to understand an entirely new class of vessel. RFA Tidespring received her Phalanx CIWS mounts in September but it is unknown when she will finally leave the yard. RFA Tiderace arrived in early August for her initial inspections, it is unclear what impacts the delays to the first ship will have on the maintenance schedules of the other three vessels. It should be noted that RFA Tidesurge and RFA Tideforce have recently completed successful deployments in the North Atlantic.
(6) RFA Fort Victoria completed a major refit in October 2018 including modifications to allow her to replenish the QEC aircraft carriers. But in July 2019 she returned to Cammell Laird apparently for “routine underwater hull and propulsion shaft surveys.” While it is hard to understand why this was not done during her major refit, what is more curious is that she remains in dry dock nearly 6 months later. The RN can get by without her services for now and the priority must be her availability to support the first operational deployment of HMS Queen Elizabeth in 2021. Until the new Fleet Solid Support ships are built, Fort Victoria is the only vessel equipped to transfer solid stores (up to 2 tonnes) to the aircraft carriers by jackstay rig.
In all of the instances above it is not clear if technical problems alone are the underlying reason for delays but there is speculation that funding and personnel have also become a factor. The demands of equipping the aircraft carriers maybe gouging the RN’s support budget. The postponement of Dauntless’ PIP until Spring suggests that the project might have been suspended pending the start of the next financial year. When the aircraft carriers sailed from Rosyth, neither was a finished ship and both require maintenance and a substantial and ongoing programme of ‘capability insertion periods’ to complete them. Supporting the carriers makes considerable demands on contractors and their subcontractors, who have finite numbers of skilled personnel to carry out complex engineering tasks. Unless the situation is gripped quickly, these issues threaten to further erode the availability of ships for operations.
The Defence Secretary has told the First Sea Lord to make his top priority “getting what we have working”. If the theme of 2019 has been dockyard delays, let us hope the Navy and its contractors are able to report more rapid progress by the end of 2020.
For original article which contains photos and links to related articles see:
https://www.savetheroyalnavy.org/mainte ... LFm0c7TEsA
Maintenance problems for the Royal Navy mount up
The delivery of the RN’s second aircraft carrier has deservedly been celebrated as a great success for British industry but behind the scenes, in the naval bases and shipyards, all is not well. 2019 has seen a number of important maintenance projects stalled or delayed. Here we summarise the situation.
Delays to naval construction and refit work are nothing new. A couple of projects behind schedule would not be especially remarkable but the news that the Type 45 destroyer engine upgrade has been postponed means the number of RN upkeep and construction projects suffering significant delays has now reached at least six.
(1) The Power Improvement Project (PIP) project is a £160M contract which was awarded to BAE Systems in March 2018 and will eventually cure the propulsion problems of all six Type 45 destroyers. (The MoD and Defence Minister, Geoff Hoon, not BAES took the decision to risk selecting the unproven WR-21 Gas Turbines back in 2000 that is at the root of the propulsion issues.) Cammell Laird has been sub-contracted by BAES to do the heavy engineering work required to remove the destroyer’s two diesel generators and replace them with 3 more powerful units. CL was expecting the first ship, HMS Dauntless, to arrive on Merseyside to begin the work in this Autumn but the start of the work has now been postponed at least six months, until late March 2020.
BAES say they are not at liberty to comment and the MoD would not offer us any explanation other than to promise “The first of class PIP conversion is expected to complete in 2021 as planned”. To put this in context, HMS Dauntless was reputed to have experienced the worst of the propulsion problems suffered by the class. After serving for just 6 years she was laid up in early 2016, ostensibly to save manpower, and then started a lengthy major refit in Portsmouth in early 2018 which included preparation for the PIP. Delays to this preparatory work are the reason she will not be towed north before the Spring. If the re-engine project proceeds smoothly once underway, we might expect Dauntless to rejoin the fleet at the end of 2021 after nearly six years of unavailability. There will likely be a knock-on effect for the other 5 ships than need to undergo the PIP, although the MoD says the timing of the work will be “dependent on the availability of ships to undertake the conversion, balanced against the Royal Navy’s standing and future operational commitments”.
HMS Daring remains laid up and inactive but other Type 45s, HMS Defender, Duncan and Dragon have participated in very successful deployments across the globe during 2019.
(2) As we reported in more detail earlier in the year, HMS Vanguard will not be ready for sea early in 2020 as originally scheduled. As of December 2019, she remains in dry dock at Devonport, shrouded in scaffolding with the Reactor Access House (RAH) still in place over her reactor compartment indicating the refuelling process is still incomplete. As a consequence, there will be inevitable adjustments to the planned maintenance schedules and routine of the other 3 boats. HMS Victorious is the next boat due to have her LOP and may have to conduct additional patrol(s) while really in need a major refit.
(3) Entry into service of the 4th Astute-class submarine, HMS Audacious has been delayed by 17 months putting further pressure on the RN’s vitally important SSN force. The problems are of a serious technical nature and will impact on the delivery of the following 3 boats. This is a new construction rather than an upkeep issue but no explanation or justification for this serious setback has been made public. Those accountable are conveniently shielded by the veil of secrecy around the submarine enterprise.
(4) The major Life Extension (LIFEX) programme for the Type 23 frigates is also running well behind schedule. Currently, 7 frigates, more than half of the force, are in Devonport either undergoing work or in the queue awaiting refit. The failure to replace the Type 23s sooner will have ever-increasing cost implications. Examination of some of the older ships has revealed serious structural problems that require additional rectification and expense. For example, HMS Lancaster required 200 separate steel inserts in her hull to make her seaworthy and HMS Iron Duke is known to have arrived in an even poorer material state.
HMS Richmond is the first frigate to receive a new generation of diesel generators and a fully-modernised control and surveillance system under the PGMU project. Richmond’s ships company moved on board in July but she has still not left the basin, although there are indications she might finally sail on sea trials just before Christmas. As one of the two oldest frigates, HMS Lancaster is not receiving the engine upgrade but has almost completed her LIFEX and should return to her homeport of Portsmouth in December.
(5) RFA Tidespring also remains at Cammell Laird after her planned “4-month” Lloyds certification hull inspection and “minor maintenance package” which began in February has now gone beyond 10 months. Neither the contractor or the MoD will offer any explanation, although it is known that the inspections have uncovered unforeseen issues while CL are having to understand an entirely new class of vessel. RFA Tidespring received her Phalanx CIWS mounts in September but it is unknown when she will finally leave the yard. RFA Tiderace arrived in early August for her initial inspections, it is unclear what impacts the delays to the first ship will have on the maintenance schedules of the other three vessels. It should be noted that RFA Tidesurge and RFA Tideforce have recently completed successful deployments in the North Atlantic.
(6) RFA Fort Victoria completed a major refit in October 2018 including modifications to allow her to replenish the QEC aircraft carriers. But in July 2019 she returned to Cammell Laird apparently for “routine underwater hull and propulsion shaft surveys.” While it is hard to understand why this was not done during her major refit, what is more curious is that she remains in dry dock nearly 6 months later. The RN can get by without her services for now and the priority must be her availability to support the first operational deployment of HMS Queen Elizabeth in 2021. Until the new Fleet Solid Support ships are built, Fort Victoria is the only vessel equipped to transfer solid stores (up to 2 tonnes) to the aircraft carriers by jackstay rig.
In all of the instances above it is not clear if technical problems alone are the underlying reason for delays but there is speculation that funding and personnel have also become a factor. The demands of equipping the aircraft carriers maybe gouging the RN’s support budget. The postponement of Dauntless’ PIP until Spring suggests that the project might have been suspended pending the start of the next financial year. When the aircraft carriers sailed from Rosyth, neither was a finished ship and both require maintenance and a substantial and ongoing programme of ‘capability insertion periods’ to complete them. Supporting the carriers makes considerable demands on contractors and their subcontractors, who have finite numbers of skilled personnel to carry out complex engineering tasks. Unless the situation is gripped quickly, these issues threaten to further erode the availability of ships for operations.
The Defence Secretary has told the First Sea Lord to make his top priority “getting what we have working”. If the theme of 2019 has been dockyard delays, let us hope the Navy and its contractors are able to report more rapid progress by the end of 2020.
For original article which contains photos and links to related articles see:
https://www.savetheroyalnavy.org/mainte ... LFm0c7TEsA
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
-
Brian James
- Posts: 13231
- Joined: Sun Aug 12, 2018 6:58 am
Re: General Naval Topics
Ops Room/CIC...still miss it!
You do not have the required permissions to view the files attached to this post.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
From; Grey Funnel Line
The Conservatives will "increase funding" and will not "cut" the Armed Forces "in any form", said Boris Johnson. They have also pledged to protect veterans from vexatious cases.
See - https://www.forces.net/news/general-ele ... HYJPHDEgGw
The Conservatives will "increase funding" and will not "cut" the Armed Forces "in any form", said Boris Johnson. They have also pledged to protect veterans from vexatious cases.
See - https://www.forces.net/news/general-ele ... HYJPHDEgGw
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Defence Overhaul Expected After Previous Spending Branded 'A Farce'
The Prime Minister's chief aide, Dominic Cummings, is expected to overhaul defence procurement at the start of next year.
Defence mandarins are bracing themselves for an overhaul of the way they operate, after Boris Johnson's chief aide Dominic Cummings branded previous major military purchases "a farce".
Mr Cummings, the brains behind the Vote Leave campaign and a Whitehall critic, used a personal blog in March to accuse the Ministry of Defence (MOD) of squandering "billions of pounds" on warships that were no longer suitable for battle.
The Times reported that Mr Cummings, chief special adviser at Number 10, was now expected, following the Prime Minister's election win, to examine recent military purchases and costly equipment.
In his blog written eight months ago, he said the UK's two-aircraft carriers, which cost a combined £6.2 billion, could not be used against a "serious enemy".
HMS Queen Elizabeth and the newly-commissioned HMS Prince of Wales were seen side-by-side for the first time in Portsmouth earlier this month.
Published before he joined the Government, Mr Cummings hit out at the programme to build the carriers.
Calling the scheme a "farce", he added that MOD procurement specialists had "continued to squander billions of pounds, enriching some of the worst corporate looters and corrupting public life via the revolving door of officials/lobbyists".
"Scrutiny by our MPs has been contemptible. They have built platforms that already cannot be sent to a serious war against a serious enemy," wrote Mr Cummings, who is regarded as a key player in the election strategy that produced a victory for Mr Johnson.
He poured scorn on the quality of those overseeing the purchasing process, adding: "The officials in charge of multi-billion processes are mostly mediocre, often appalling."
Continues at - https://www.forces.net/news/defence-spe ... 7DKMD1u4QM
The Prime Minister's chief aide, Dominic Cummings, is expected to overhaul defence procurement at the start of next year.
Defence mandarins are bracing themselves for an overhaul of the way they operate, after Boris Johnson's chief aide Dominic Cummings branded previous major military purchases "a farce".
Mr Cummings, the brains behind the Vote Leave campaign and a Whitehall critic, used a personal blog in March to accuse the Ministry of Defence (MOD) of squandering "billions of pounds" on warships that were no longer suitable for battle.
The Times reported that Mr Cummings, chief special adviser at Number 10, was now expected, following the Prime Minister's election win, to examine recent military purchases and costly equipment.
In his blog written eight months ago, he said the UK's two-aircraft carriers, which cost a combined £6.2 billion, could not be used against a "serious enemy".
HMS Queen Elizabeth and the newly-commissioned HMS Prince of Wales were seen side-by-side for the first time in Portsmouth earlier this month.
Published before he joined the Government, Mr Cummings hit out at the programme to build the carriers.
Calling the scheme a "farce", he added that MOD procurement specialists had "continued to squander billions of pounds, enriching some of the worst corporate looters and corrupting public life via the revolving door of officials/lobbyists".
"Scrutiny by our MPs has been contemptible. They have built platforms that already cannot be sent to a serious war against a serious enemy," wrote Mr Cummings, who is regarded as a key player in the election strategy that produced a victory for Mr Johnson.
He poured scorn on the quality of those overseeing the purchasing process, adding: "The officials in charge of multi-billion processes are mostly mediocre, often appalling."
Continues at - https://www.forces.net/news/defence-spe ... 7DKMD1u4QM
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.