General Naval Topics

Add your posts about Royal Navy ships in this section
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Naval medics test ‘air ambulance’ concept at sea for first time

Medics on Britain’s flagship tested a ‘military air ambulance’ at sea for the first time to speed up life-saving the next time a Royal Navy carrier group goes into action.
HMS Queen Elizabeth used her autumn deployment to the North Sea and Scandinavia – the northern ‘arm’ of the Royal Navy’s Operation Achillean, which has also seen an amphibious task group spearheaded by HMS Albion exercising in the Mediterranean – to test the ‘air ambulance’ concept, mirroring the emergency service provided by the NHS but at sea.

The new Maritime Medical Emergency Response Team or MMERT flies a small team of casualty experts directly to the injured person by helicopter, provides on-the-spot life-saving care, then deliver them to a hospital for further treatment… be that ashore or the sick bay on an aircraft carrier.

MMERT was tested in an exercise with Queen Elizabeth’s escort HMS Richmond: a ‘casualty’ in the engine room suffered injuries more severe than those the frigate’s sick bay team could cope with, requiring the A&E expertise of the MMERT team, and ultimate transfer to the flagship.

“The exercise provided an excellent opportunity to test the developing Maritime Medical Emergency Response Team capability,” explained paramedic Warrant Officer 1 Phil Towers.

“The team was composed of a Royal Navy medical consultant, paramedic and a medical assistant.

“Maritime MERT provides advanced trauma care far forward – equivalent to the care provided by UK air ambulances – including senior clinical decision making, anaesthesia and blood products.”

Continues at - https://www.royalnavy.mod.uk/news-and-l ... first-time
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

MoD has issued a tender for £147M Offshore Support to Military Training and Exercises contract to run 2025-35. The winner will operate (MoD-owned) SD Victoria and provide replacement for SD Northern River.

See - https://twitter.com/NavyLookout/status/ ... 4264730629
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Royal Navy sets eight outcomes in Digital and Data Plan

The Royal Navy has outlined eight desired outcomes and five key enablers to meet a vision of being data and evidence driven in its strategic and tactical decision making.

It has published a new Digital and Data Plan 2022-25 that it says provides a structure to overcome its relevant challenges and build its capabilities to move towards the vision for 2030.

This largely focuses on key concepts, with the eight outcomes covering: cohered, curated and assured data from HQ to the tactical edge; smarter decision making at all levels of command; efficient business processes that drive force readiness and sustainability; improved cyber security and resilience; integrated effects from the maritime domain; adaptable and resilient command and control systems; faster integration of capabilities to the frontline; and a digitally empowered workforce ready to create and collaborate.

The enablers to realising these include digitally upskilling the workforce, developing outcome focused projects enabled by enterprise architectures and standards, using data-as-a-service for the integration and curation of data and decision support tools, system integration and exploiting new and existing technologies, and an ethos focused on delivering to end users and closing the digital divide. The latter will involve exploiting Ministry of Defence options where possible.

Tech tools Continues at - https://www.ukauthority.com/articles/ro ... data-plan/
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Upgrade of Gosport oil fuel depot completed.

The MOD DIO £83m project included replacement of storage tanks, pipework, delivery systems, gatehouse, control room, sampling laboratory and stores to support future fuel needs of warships in Portsmouth.

See - https://www.gov.uk/government/news/gosp ... quirements
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

UK signs for Aster 30 Block 1 anti-ballistic missile weapons

On 8 December 2022, the Ministry of Defence signed an amendment to a contract with Eurosam, a consortium of companies managed by MBDA, for the production of Aster 30 Block 1 missiles.
The contract, which was signed by the OCCAR-EA Director on behalf of the UK MoD, will see the UK join a multi-national partnership with France and Italy for the production of the Aster missile system.

Continues at - https://ukdefencejournal.org.uk/uk-sign ... xSWpq3ReVM
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

House of Commons Library Research Briefing published yesterday:

An overview of the UK's naval surface fleet, future ships and the Government's naval procurement policy.

See - https://commonslibrary.parliament.uk/re ... /cbp-9697/

Documents to download
The Royal Navy's surface fleet (1 MB , PDF)

Navy Command will spend over £41 billion on equipment and support over the next decade from 2022.

The Royal Navy and Royal Fleet Auxiliary (RFA) are planning a fleet of new vessels, including frigates, supply and multi-role ships, autonomous mine-hunting systems, and ocean surveillance vessels to protect critical undersea infrastructure.

Parliament has taken a keen interest in the way the Government procures surface ships. This paper provides a short overview of the current and future fleet, the evolution of naval procurement policy and Parliamentery scrutiny of this topic.

The Royal Navy and RFA fleet
There are 71 vessels in the Royal Navy’s and RFA’s surface fleet, as of 1 April 2022.
Etc.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Royal Navy Awards Enterprise Architecture Contract to Envitia


The Royal Navy has selected Envitia to deliver its Enterprise Architecture Capability in a two-year contract worth up to £4m.

This Capability sits at the heart of the Royal Navy’s Digital & Data Plan which sets out how the Navy will become data-driven in everything it does from Strategic Headquarters to the tactical edge, enabling an integrated force to make smarter and faster military decisions.

Enterprise Architecture is the overarching function that joins an organisation’s vision to solution delivery. An Enterprise Architecture function is becoming increasingly important to an organisation as digital transformation moves away from being traditionally owned by the IT domain, to digital and data initiatives being led by business leaders as a framework for how they deliver their organisation’s strategy within a changing, volatile and complex landscape.

For the Royal Navy, an Enterprise Architecture with common data standards will ensure integration and interoperability of systems, technologies and military applications. Without this, systems and data projects would remain in silos and will be ineffective and inefficient.

Following an open competition, Envitia was selected to deliver a Digital Enterprise Architecture-as-a-Service to the Royal Navy. Envitia’s engineers are deep-data specialists with skills across all data foundation areas such as Architecture, Data Modelling, Data Quality and Data Warehouse/Cataloguing.

Nabil Lodey, CEO of Envitia, said: “The Royal Navy has taken significant steps over the past few years in changing its culture to recognise data as a strategic asset and create programmes that can exploit data. However, the recent publication of the Navy Digital & Data Plan, starting with Enterprise Architecture, demonstrates that the right decisions have been made for the Royal Navy to succeed. We’re delighted that we’ve been selected to be part of this journey and it’s a credit to our amazing team of data experts”.

Richard Griffith, CTO of Envitia, added: “This is an exciting time for the Royal Navy and the Envitia team. Once the Navy’s technology is underpinned by an end-to-end Common Technology Architecture, with interoperable standards across Maritime & Defence, the Navy can start driving exploitation with modern data analytics and data science capabilities. This will make future requirements future-proofed, flexible, reusable, focused on outcomes and user-requirements, and will deliver far greater value for money to the MOD.”

Envitia will be leading a team comprising of industry partners and wider-MOD stakeholders to deliver this service to the Royal Navy.

From - https://www.envitia.com/2022/12/royal-n ... o-envitia/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Royal Navy to hand control of Channel small boat crossings back to Home Office

Rishi Sunak ends defence primacy after admitting the government’s response was ‘too fragmented’

See - https://www.independent.co.uk/news/uk/h ... 46643.html
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

New Fishery Patrol Vessel (FPV) for the Falkland Islands

See - https://twitter.com/NavyLookout/status/ ... 0609187840
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: General Naval Topics

Unread post by Pelican »

Crowsnest Airborne Surveillance and Control due to achieve Initial Operating Capability in 2023


The Merlin helicopters equipped with the Crowsnest ASaC role kit provide are a critical aspect of the carrier strike programme. In this article, we look at how the troubled Crowsnest development project and efforts to bring the system into frontline service have progressed in the last year or so.


In basic terms, a Crowsnest aircraft is equipped with a Searchwater 2000 radar that extends the radar horizon to give the carrier group give early warning of air or surface threats. The radar is carried in an inflatable Kevlar bag attached by an arm to the port side of the fuselage and after take-off, is lowered to the vertical position. When not in use, the radome is is rotated 90º to the horizontal position and the bag deflated. The pilot is accompanied by two skilled observers in the back of the aircraft that used the Cerberus mission system to interpret the radar picture and coordinate other aircraft.

Three Crowsnest-equipped Merlin helicopters were deployed on the 2021 carrier strike group deployment. (More details in our previous articles here) but their performance was very limited primarily by instability in the System Release 11.0 version of the software. Industry has worked hard to learn the lessons from CSG21 and an improved System Release 11.4 was delivered in April 2022. This release was applied to the ASaC Mission Trainer at RNAS Culdrose and to two Merlins deployed with HMS Prince of Wales on NATO duty in the Mediterranean in May and June.

Continues at - https://www.navylookout.com/crowsnest-a ... y-in-2023/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”