Page 6 of 8
Re: Shipbuilding and Ship Repair
Posted: Thu Jan 08, 2026 8:41 pm
by Pelican
U.S. Revives Cold War-Era Base to Build the World’s Largest Weapons Hub Just Miles From China
A once-forgotten naval stronghold is roaring back to life in the heart of Asia’s most contested waters. Backed by billions and powerful allies, this strategic port is being transformed into something far bigger than it appears.
The Indo-Pacific has grown more tense. Maritime boundaries are being challenged, alliances tested, and defence footprints recalibrated. In this shifting environment, a familiar name is reappearing on maps and in strategic briefings: Subic Bay.
Once central to American power projection during the Cold War, Subic had faded from military relevance. The U.S. pulled out in 1992. The shipyard fell silent. For a time, it was just a memory. But not anymore.
Work crews are back. Steel is being cut. Partnerships have formed, funding secured. Subic is no longer dormant. Something bigger is unfolding on the coastline of western Luzon, and it reflects more than just shipbuilding.
Shipbuilding Restarts, but Defence Footprint Grows
https://indiandefencereview.com/u-s-rev ... rom-china/
Re: Shipbuilding and Ship Repair
Posted: Mon Jan 12, 2026 11:57 am
by Pelican
Faslane nuclear base tugboats may be built in China
EXCLUSIVE – New tugboats intended to support operations at HM Naval Base Clyde, the UK’s nuclear submarine hub at Faslane, may be constructed in China under a major fleet replacement programme, depending on how the contractor applies its global production model.
The vessels form part of the Defence Maritime Services Next Generation programme, under which Serco is replacing a wide range of Royal Navy harbour and support craft. The programme covers tugs, pilot boats and barges used at naval bases across the UK, including Faslane, which hosts the UK’s continuous at-sea nuclear deterrent.
Under the current arrangements, the Ministry of Defence pays Serco to provide support services at the Royal Navy’s principal bases, and allows Serco, as the prime contractor, to determine its own supply chain for vessel replacement.
Build locations and Damen’s production model
https://ukdefencejournal.org.uk/faslane ... -in-china/
Re: Shipbuilding and Ship Repair
Posted: Tue Jan 13, 2026 6:16 pm
by Pelican
Pelican wrote: ↑Mon Jan 12, 2026 11:57 am
Faslane nuclear base tugboats may be built in China
EXCLUSIVE – New tugboats intended to support operations at HM Naval Base Clyde, the UK’s nuclear submarine hub at Faslane, may be constructed in China under a major fleet replacement programme, depending on how the contractor applies its global production model.
The vessels form part of the Defence Maritime Services Next Generation programme, under which Serco is replacing a wide range of Royal Navy harbour and support craft. The programme covers tugs, pilot boats and barges used at naval bases across the UK, including Faslane, which hosts the UK’s continuous at-sea nuclear deterrent.
Under the current arrangements, the Ministry of Defence pays Serco to provide support services at the Royal Navy’s principal bases, and allows Serco, as the prime contractor, to determine its own supply chain for vessel replacement.
Build locations and Damen’s production model
https://ukdefencejournal.org.uk/faslane ... -in-china/
New tugboats for Faslane will not be built in China
The Ministry of Defence has said that new support vessels being procured under the Defence Maritime Services Vessel Replacement Programme will not be built in China, following reporting that raised questions about potential overseas construction under the Serco-led contract.
See
https://ukdefencejournal.org.uk/new-tug ... -in-china/
Re: Shipbuilding and Ship Repair
Posted: Wed Feb 11, 2026 2:45 am
by Brian James
The Brass Foundry pictured at John Brown & Co Shipbuilding Shipyard, Clydebank in 1901.
Re: Shipbuilding and Ship Repair
Posted: Sat Mar 07, 2026 3:14 am
by Brian James
Turbine blades being fitted at the Iron Foundry, Machine Moulding Shop pictured at Wallsend Slipway & Engineering Co Shipyard on the River Tyne in 1916.
Re: Shipbuilding and Ship Repair
Posted: Sat Mar 07, 2026 3:39 am
by Brian James
Turbine blades pictured being fitted at Wallsend Slipway & Engineering Co Shipyard on the River Tyne in 1916.
Re: Shipbuilding and Ship Repair
Posted: Thu Apr 16, 2026 6:43 am
by Brian James
Passenger Ferry MS Polarlys in dry dock at Fiskerstrand Shipyard, Norway.
Re: Shipbuilding and Ship Repair
Posted: Sun May 17, 2026 12:12 pm
by Pelican
Navy Lookout
Another win for the national shipbuilding strategy...
A&P Falmouth have lost a multi million pound contract to refit the polar research vessel RRS Sir David Attenborough to the

Danish shipyard Orskov.
https://www.falmouthpacket.co.uk/news/2 ... enborough/
https://businesscornwall.co.uk/news-by- ... nder-loss/
Re: Shipbuilding and Ship Repair
Posted: Fri Jul 10, 2026 1:06 pm
by Pelican
Re: Shipbuilding and Ship Repair
Posted: Fri Jul 10, 2026 3:28 pm
by Pelican
Australian Naval Shipbuilding At The Henderson Defence Precinct – A Naval News Outline
The future Henderson Defence Precinct near Perth in Western Australia is one of two primary shipbuilding and maintenance facilities supporting operations and future growth of the Royal Australian Navy. In this outline Naval News will provide a detailed overview of the present structure at this facility, policy planning for future modernisation and expansion, and finally, some of the most notable challenges in these regards.
See
https://www.navalnews.com/naval-news/20 ... -precinct/