Re: RN Aircraft Carriers: HMS Queen Elizabeth
Posted: Mon May 20, 2024 8:17 pm
Q.E. Update
MoD and RN have yet to officially confirm when R08 HMS Queen Elizabeth will leave Babcock Rosyth following her ongoing repairs, its understood that the carrier's stay in dry-dock is being extended until late Summer 24 to allow further significant work on the propulsion system to be carried out. This work had previously been planned for 2025 when the carrier was due into Rosyth for her 5 year Inspection and other refit related work including the installation of the flight deck Bedford Lighting Array (for F35B SRVL operations).
While the principle reason for the present dry docking was entirely related to inspection and cleaning for corrosion of the starboard prop shaft couplings (there are 3 per shaft)and the large bearing units associated with them, it has now been decided to replace both port and starboard prop shafts in total.
This has not been caused by anything discovered during the present work but was always going to have to happen as a result of the work done on R09 HMS Prince of Wales in early 2022 when the cause of her starboard prop shaft failure was discovered and analysed. In short, it was deduced that a new lubrication design for the bearings and main shaft couplings was needed which meant new amended design shafts were required. R09 had new shafts fitted in 2022 and R08 still requires them The decision to bring the exchange forward was made recently following the early production availability of the shaft sets for R08. So the opportunity has been taken to sort the exchange now while that area is the focus of ongoing activity anyway rather than wait until 2025, and also of course minimise the risk of R08 suffering the same failure as R09 had when she returns as the HR carrier later this year.
MoD and RN have yet to officially confirm when R08 HMS Queen Elizabeth will leave Babcock Rosyth following her ongoing repairs, its understood that the carrier's stay in dry-dock is being extended until late Summer 24 to allow further significant work on the propulsion system to be carried out. This work had previously been planned for 2025 when the carrier was due into Rosyth for her 5 year Inspection and other refit related work including the installation of the flight deck Bedford Lighting Array (for F35B SRVL operations).
While the principle reason for the present dry docking was entirely related to inspection and cleaning for corrosion of the starboard prop shaft couplings (there are 3 per shaft)and the large bearing units associated with them, it has now been decided to replace both port and starboard prop shafts in total.
This has not been caused by anything discovered during the present work but was always going to have to happen as a result of the work done on R09 HMS Prince of Wales in early 2022 when the cause of her starboard prop shaft failure was discovered and analysed. In short, it was deduced that a new lubrication design for the bearings and main shaft couplings was needed which meant new amended design shafts were required. R09 had new shafts fitted in 2022 and R08 still requires them The decision to bring the exchange forward was made recently following the early production availability of the shaft sets for R08. So the opportunity has been taken to sort the exchange now while that area is the focus of ongoing activity anyway rather than wait until 2025, and also of course minimise the risk of R08 suffering the same failure as R09 had when she returns as the HR carrier later this year.