Re: RN Frigates: Type 31
Posted: Fri Sep 13, 2019 8:55 pm
by ivorthediver
Excellent NewsJim , thanks for sharing this with us

Re: RN Frigates: Type 31
Posted: Sat Sep 14, 2019 5:36 pm
by designeraccd
Therefore the BAE "stranglehold" on RN warship design is broken??
Also, a link to Babcock's CEO (?):
https://www.youtube.com/watch?v=f7UB0YuTNQA Howie does know how to
smoooooooothly integrate ALL the current hi-techy "buzz words"; must give him that. Now IF the actual frigate is 2/3 as good, RN will have a winner! Maybe U$N in itzz search for a "tested" FFG design should $ign on??? "
A gun in the front", gee...really??? What modern FFG, DDG design doesn't have that......real creativity there....uh...where?

DFO
Re: RN Frigates: Type 31
Posted: Sat Sep 14, 2019 7:07 pm
by jbryce1437
Thread title amended from Type 31e to Type 31
Jim
Re: RN Frigates: Type 31
Posted: Wed Nov 13, 2019 7:33 pm
by Pelican
When will the first Royal Navy Type 31 frigate enter service?
The schedule to build five Type 31 frigates for the Royal Navy by the mid-2020s has been described as ‘aggressive’. Here we examine the timeline for the delivery these ships and the challenges that have to be overcome.
In November 2015 as part of the Defence Review, the Type 31 frigate project was officially launched, initially called the General Purpose Light Frigate (GPFF). The intention was these ships would replace the first five Type 23 frigates, scheduled to leave service at a rate of one every year from 2023. As recently as 2017 the government’s National Shipbuilding Strategy document promised: “The first will be in service by 2023 and we require each new ship to come in at 12-month intervals”.
In-service or In the water?
Although it has largely gone unnoticed, the Type 31 delivery schedule has been subtly moved to the right. When Babcock were announced as the Type 31 competition winners in September 2019, the contractor was now promising steel cutting would begin in 2021 and the first vessel would be “in the water” by 2023. There is a big difference between the launch of the structurally complete hull and a fully functioning warship that is actually in service. Typically for the first of class this could be 2-3 years. In the case of the clearly-defined but leisurely plan for first Type 26 frigate HMS Glasgow, this is even longer, she will be “in the water” by late 2021 but will not be operational before 2027.
The first of class is effectively a prototype warship and usually has 3 rounds of trials before she can be described as ‘in-service’. Initial Sea Trials (IST) concentrate on the propulsion, steering and seaworthiness of the platform. The next phase is to test combat systems, sensors and communications. The final phase involves test-firing weapons. The ship’s company then needs to pass Operational Sea Training (which may be extended for the first of class as many operating procedures may still need to be defined) before she can be declared ready for deployment.
It looks increasingly likely that either frigate numbers will dip further or several of the aeging Type 23 frigates will have to soldier on for about two years beyond their intended out of service date
Continues at:
https://www.savetheroyalnavy.org/when-w ... fkeOROautI
Re: RN Frigates: Type 31
Posted: Thu Nov 14, 2019 5:27 pm
by ivorthediver
Thanks David for an interesting update .
Re: RN Frigates: Type 31
Posted: Fri Nov 15, 2019 4:04 pm
by Pelican
From SavetheNavy
BREAKING:
Very low profile announcement due to General Election Purdah restrictions, but the MoD has formally signed the contract with Babcock to build the 5 Type 31 frigates.
Type 31 Contract Win
RNS Number : 6267T
Babcock International Group PLC
15 November 2019
Babcock International Group PLC (Babcock or the Company)
Babcock awarded contract to deliver UK's Type 31 naval frigate programme
Babcock, the Aerospace and Defence Company, has been awarded a contract by the UK Ministry of Defence to deliver its newest fleet of warships. The Type 31 general-purpose frigate programme will provide the UK with a fleet of five ships, at an average production cost of £250 million per ship.
The formal contract award follows the announcement earlier this year that Babcock's Team 31 had been selected as Preferred Bidder following a competitive process. Babcock's Arrowhead 140 is a capable, adaptable and technology-enabled global frigate with a proven design and build strategy.
The frigates will be assembled at Babcock's Rosyth facility, and involve supply chains throughout the UK, in line with the UK's shipbuilding strategy.
See -
https://www.proactiveinvestors.co.uk/LO ... KHdzmscb8E
Re: RN Frigates: Type 31
Posted: Fri Nov 15, 2019 4:06 pm
by Pelican
From SavetheNavy
BREAKING:
Very low profile announcement due to General Election Purdah restrictions, but the MoD has formally signed the contract with Babcock to build the 5 Type 31 frigates.
Type 31 Contract Win
RNS Number : 6267T
Babcock International Group PLC
15 November 2019
Babcock International Group PLC (Babcock or the Company)
Babcock awarded contract to deliver UK's Type 31 naval frigate programme
Babcock, the Aerospace and Defence Company, has been awarded a contract by the UK Ministry of Defence to deliver its newest fleet of warships. The Type 31 general-purpose frigate programme will provide the UK with a fleet of five ships, at an average production cost of £250 million per ship.
The formal contract award follows the announcement earlier this year that Babcock's Team 31 had been selected as Preferred Bidder following a competitive process. Babcock's Arrowhead 140 is a capable, adaptable and technology-enabled global frigate with a proven design and build strategy.
The frigates will be assembled at Babcock's Rosyth facility, and involve supply chains throughout the UK, in line with the UK's shipbuilding strategy.
See -
https://www.proactiveinvestors.co.uk/LO ... KHdzmscb8E
Re: RN Frigates: Type 31
Posted: Fri Nov 15, 2019 4:46 pm
by ivorthediver
A steep in the right direction , lets pray the fleet of five is not pruned .......
Re: RN Frigates: Type 31
Posted: Fri Nov 15, 2019 8:51 pm
by jbryce1437
ivorthediver wrote: ↑Fri Nov 15, 2019 4:46 pm
A steep in the right direction , lets pray the fleet of five is not pruned .......
Good news, be better if the number was increased
Jim
Re: RN Frigates: Type 31
Posted: Fri Nov 15, 2019 9:41 pm
by Little h
But what should we read into the passage (bolded by me), taken from an article in
The Engineer By Stuart Nathan 12th September 2019 12:53 pm :-
---------------------------------
The crew complement will be 100 to 160 sailors, and each ship will be
able to accommodate an AW–10 Merlin or MH-60 Seahawk helicopter in an on-board hanger which will also be able to house light aircraft and UAVs.
---------------------------------
Where does an MH-60 Seahawk helicopter feature in the scheme of things when we have Merlins and Wildcats?