South Korea Unveils Historic Plan to Build First Nuclear-Powered Submarine
On Tuesday, May 26, South Korea’s Ministry of National Defense announced the “Basic Plan for the Development of the Republic of Korea Nuclear-Powered Submarine.”
Republic of Korea Ministry of National Defense Press Release Translated by Naval News
The “Basic Plan for the Development of the Republic of Korea Nuclear-Powered Submarine” is the first document to present, both domestically and internationally, the direction for the Republic of Korea to systematically develop a nuclear-powered submarine. Its main contents are as follows.
Nuclear-powered submarines possess dramatically enhanced operational capabilities compared to existing diesel-powered submarines, including long-duration submerged endurance and high mobility. They will therefore play a key role in responding to North Korea’s submarine-based nuclear and missile threats.
The development of nuclear-powered submarines is not merely a warship construction project, but a national strategic project that requires the concentration of national capabilities based on the Republic of Korea’s technologies in the nuclear and shipbuilding sectors. The project will be developed systematically and in phases while observing the following five principles.
First, the nuclear fuel for the nuclear-powered submarine reactor will use low-enriched uranium, and the reactor will be developed to enable long-cycle operation* in order to minimize nuclear fuel replacement.
Second, in order to secure autonomy and stability in force acquisition, sustainment, and maintenance, the nuclear-powered submarine will be developed and built within the Republic of Korea.
Third, the platform and propulsion system of the nuclear-powered submarine will be developed by actively utilizing world-class technologies accumulated over a long period in the Republic of Korea’s civilian nuclear and shipbuilding sectors, so that a high level of reliability and safety can be ensured.
Fourth, the entire process, from the design, construction, operation, maintenance, nuclear fuel management, and dismantlement of the nuclear-powered submarine, will be developed and managed from a total life-cycle perspective in order to secure sustainable operation.
Fifth, the development will be pursued so that the first nuclear-powered submarine can be launched in the mid-2030s, and commissioned into service after the late 2030s.
Continues
https://www.navalnews.com/naval-news/20 ... submarine/