Re: Current RN News and Updates
Posted: Tue Nov 24, 2026 11:20 am
National Armaments Director Group - @UKArmaments
The RoyalNavy's future frigate fleet is taking shape.
HMS Cardiff recently had her twin-pole masts fitted – the first time a Type 26 frigate has achieved this in dry dock – while HMS Active has reached a Type 31 milestone with the installation of her forward and mid masts.
Some comments:
Matthew Warwick
Cardiff has been under construction 7 years, longer than the Second World War.
Active has been under construction nearly 4 years, in May she'll pass the milestone of the length of the First World War.
Trexx
The first Type 26, HMS Glasgow, was ordered in 2017 and is scheduled to be operational next year. In 2018 the Japanese government ordered the Mogamis, with the 11th ship in the class due to be commissioned next month.
andrew corbett
The UK's first nuclear powered submarine (Dreadnought) took 3 years 10 months from laying down to commissioning...
We are doing something wrong and please don't try to tell me a frigate in 2026 is more complex than our first nuclear powered submarine in 1963
Martin Edwards
The ban on double shifts & overtime means the building /fitting out of these ships is moving at a glacial pace ! This is a national disgrace & the blame is shared by the Treasury , MOD & Navy top brass! This is killing the RN surface fleet & endangering the UK!
The RoyalNavy's future frigate fleet is taking shape.
HMS Cardiff recently had her twin-pole masts fitted – the first time a Type 26 frigate has achieved this in dry dock – while HMS Active has reached a Type 31 milestone with the installation of her forward and mid masts.
Some comments:
Matthew Warwick
Cardiff has been under construction 7 years, longer than the Second World War.
Active has been under construction nearly 4 years, in May she'll pass the milestone of the length of the First World War.
Trexx
The first Type 26, HMS Glasgow, was ordered in 2017 and is scheduled to be operational next year. In 2018 the Japanese government ordered the Mogamis, with the 11th ship in the class due to be commissioned next month.
andrew corbett
The UK's first nuclear powered submarine (Dreadnought) took 3 years 10 months from laying down to commissioning...
We are doing something wrong and please don't try to tell me a frigate in 2026 is more complex than our first nuclear powered submarine in 1963
Martin Edwards
The ban on double shifts & overtime means the building /fitting out of these ships is moving at a glacial pace ! This is a national disgrace & the blame is shared by the Treasury , MOD & Navy top brass! This is killing the RN surface fleet & endangering the UK!