Sorry Iv'e been absent for awhile but been busy overhauling the electrical system on the tug and rewiring sections to assist in access to various items .
One of the bains of my models in striving to impart as much realism as possible has been the installation of lighting .
This is easy enough until you have to trace a fault in the system , and as they were added piecemeal the problem of tracing wiring when a bulb popped was localised but of late my patience has been sorely tried .
As you will recall the system is based on a 12volt supply and where lights were needed I opted for some purchased spotlights which came with a 3v bulb as a sealed unit .....great until it blows
These were wired in daisy chain to i.e. 4 x 3v =12 , hmmmm to make matters worse the wiring was all built in out of sight and I tried to conceal the cable runs which is great until you get the need for repairs
Yes you can replace the original bulbs ....or replace them with L.E.D.'s which run at a slightly lower voltage working with resistors of a suitable value ..or...a voltage regulator which can be pre set at the desired voltage to run the lights in question .
With the amount of lower voltage items I needed to supply I opted for two of the voltage regulator's which are so cheap now-days and can be adjusted as needed , so I set about rewiring with gay abandon and tested each light prior to wiring onto the busbar and then once powered up ....disaster set in .....in a collection of 6 floodlights and three search lights some failed to light up .....no big deal you say just check the wiring ......Ahhhh there lay the problem as all the cables were either red or black leads housed in shrink wrap to enable me to blend them in with the structure .Hmmmmm
What I should have done on reflection was colour code the wiring so I could identify which wire was which in each of the lighting boxes
So I'm a reasonably patient man and I received the six different colour cables and shrink wrap today so that I can rewire it all again
I did a trial run on one of the flood lights which are 18mm x 6mm and the cable is 29swg and a little thicker than a strand of hair ........so it only took me about 90 mins to do one !
This was purgatory to me....... with hands like legs of pork

.....so tweezers, forceps, and all done with magnified lens and a powerful light to show the[ 7 strand wire 1.6 mm thick] up enough to solder which in turn reflects the light better and fit heat shrink at every joint to maximise adhesion at every joint , however they advise when using a 15 watt soldering iron to refrain from applied heat for more than three seconds as it will melt the fitting being worked on
Perhaps next time I'll just tywrap a torch to the bridge