Page 18 of 56
Re: RN Destroyers: Daring Class Type 45
Posted: Tue Mar 24, 2020 1:37 am
by Brian James
HMS Dauntless returns to HMNB Portsmouth after conducting machinery trials,March 23rd,2020.
Re: RN Destroyers: Daring Class Type 45
Posted: Sun Mar 29, 2020 10:54 pm
by Little h
Little h wrote: ↑Fri May 03, 2019 9:22 pm
'Jack' it seems, hasn't lost his penchant for sticking chitty's on every available bulkhead, stanchion, or available surface.
Not even on a ship with an absolute plethera of screens.
HMS Dragon D35 with FOST about a year ago on twitter.
Db4Dt2AW4AA5n-n.jpg
Remember the post above - well here is another example seen in a re-tweet on 26th March 2020 by the Type 45 Dauntless D33 - showing an absolute plethera of chitty's, cribsheets &/or aide-mémoires ... this time it's not a T45, but Cattistock M31
HMS Cattistock EUDVXDPWsAEknxT cribs on bridge deckhead fittings paint.jpg
Attachment derived from the image contained in following re-tweet:-
HMS Dauntless Retweeted
HMS Cattistock
@HMSCattistock
Who’s that on the horizon? Fantastic day at sea - exchanging ID’s, CONAV, boat drills and a man overboard exercise. All in a days work for MCM2 Crew 6. Who could ask for better weather? @HMSDauntless
#weshallfindawayormakeone
Re: RN Destroyers: Daring Class Type 45
Posted: Sat May 02, 2020 3:30 pm
by Pelican
MAY 1, 2020 ~~~ Cure for Royal Navy destroyers engine woes in sight
This evening HMS Dauntless sailed from Portsmouth, heading to Birkenhead. She will arrive on Merseyside on Tuesday morning and be the first Type 45 to undergo work to cure the propulsion problems that have plagued these ships.
The RN has paid a high price for pioneering Integrated Electric Propulsion (IEP) in a major warship. In simple terms, the gas turbines can sometimes fail when propelling the ship and the sudden load on the diesel generators can become too great. This causes them to ‘trip out’ resulting in complete power and propulsion failure. Although temporary fixes have reduced the frequency and severity of these occurrences, this is clearly an unacceptable situation and the remedy is overdue.
£280M of funding was set aside in the 2015 SDSR for the Power Improvement Package (PIP) which will finally cure the problem. In March 2018 BAE Systems, BMT Defence Services and Cammell Laird signed a contract with the MoD to deliver the PIP. The competition for the contract was split into two parts, comprising procurement, design and integration of the solution, and the physical installation and replacement of equipment onboard the Type 45 vessels.
BAE Systems has sub-contracted Cammell Laird to cut open of the hulls to remove the old generator sets and insert the new plant at their shipyard in Birkenhead, this will sustain more than 100 jobs. CL has large dry docks and years of ship repair and conversion experience appropriate to this kind of work.
Rolls-Royce is to supply new MTU Series 4000 diesel generator sets which will substantially increase the resilience of the power and propulsion system. The two existing Wärtsilä 12V200 diesel generator sets are to be replaced by three new MTU sets per vessel.
Continues with photos and video at:
https://www.savetheroyalnavy.org/cure-f ... tk1-niQgs4
Re: RN Destroyers: Daring Class Type 45
Posted: Sat May 02, 2020 5:08 pm
by ivorthediver
Well they just seem to get better and better [ albeit over a protracted delay period before retrofitting , ] lets hope the government will decide to reinstate the original number of T45 that were axed

Re: RN Destroyers: Daring Class Type 45
Posted: Sat May 02, 2020 6:51 pm
by Pelican
ivorthediver wrote: ↑Sat May 02, 2020 5:08 pm
Well they just seem to get better and better [ albeit over a protracted delay period before retrofitting , ] lets hope the government will decide to reinstate the original number of T45 that were axed
Doubt it Ivor. My understanding is that once the final present one was built all 'facilities' to build more were destroyed but perhaps other members know more?
Re: RN Destroyers: Daring Class Type 45
Posted: Sat May 02, 2020 8:59 pm
by ivorthediver
What a shame , so just a case of wishful thinking David , thanks for checking it out though

Re: RN Destroyers: Daring Class Type 45
Posted: Sun May 03, 2020 11:59 am
by Pelican
Savetheroyalnavy.org
HMS Dragon currently dry-docked in D-Lock, Portsmouth.
Re: RN Destroyers: Daring Class Type 45
Posted: Thu May 07, 2020 3:32 am
by Brian James
Type 45 Air Defence Destroyer HMS Dauntless pictured entering Cammell Laird Shipyards at Birkenhead,Merseyside,she will be the first of her Class to undergo the Power improvement Programme to remedy their infamous warm water operating issues,May 2020.
Re: RN Destroyers: Daring Class Type 45
Posted: Fri May 08, 2020 2:13 am
by Brian James
HMS Dauntless pictured as she squeezes through the entrance to Cammell Laird's wet basin at Birkenhead,Merseyside,as the first Type 45 Destroyer to go through the Power Improvement Project..May 2020.
Re: RN Destroyers: Daring Class Type 45
Posted: Sun May 10, 2020 1:37 pm
by ivorthediver
Pelican wrote: ↑Sun May 03, 2020 11:59 am
Savetheroyalnavy.org
HMS Dragon currently dry-docked in D-Lock, Portsmouth.
Remind me David , how long will this keep her out of service please