Re: New Ships for the Polish Navy
Posted: Tue Jul 01, 2025 5:24 pm
Poland launches first Saab-built intelligence ship
The Polish Navy’s first signals intelligence (SIGINT) vessel, ORP Jerzy Różycki, was launched on 1 July 2025 at Remontowa Shipbuilding S.A. in Gdańsk.
The launch ceremony was attended by senior figures from the Polish Ministry of National Defence, the Armaments Agency, the Navy, the Headquarters of Marine Technology, and the Chief of Reconnaissance and Intelligence Analysis Directorate (J2), underscoring the vessel’s strategic importance.
Commissioned under the DELFIN programme, the ship is the first of two planned SIGINT platforms designed to enhance Poland’s maritime electronic intelligence capabilities. Construction began with the first steel cut in April 2023, followed by keel laying in November that year. The vessel will now enter a fitting-out phase where Saab will install and integrate the full suite of mission systems, before the ship embarks on sea trials.
Named ORP Jerzy Różycki, the ship honours the renowned Polish mathematician and cryptologist who, alongside Marian Rejewski and Henryk Zygalski, played a critical role in breaking the German Enigma code before the Second World War.
Continues https://ukdefencejournal.org.uk/poland- ... ence-ship/
See https://tech.wp.pl/orp-jerzy-rozycki-ju ... 859636608a
And https://www.polsatnews.pl/wiadomosc/202 ... -wojennej/ Etc.
The Polish Navy’s first signals intelligence (SIGINT) vessel, ORP Jerzy Różycki, was launched on 1 July 2025 at Remontowa Shipbuilding S.A. in Gdańsk.
The launch ceremony was attended by senior figures from the Polish Ministry of National Defence, the Armaments Agency, the Navy, the Headquarters of Marine Technology, and the Chief of Reconnaissance and Intelligence Analysis Directorate (J2), underscoring the vessel’s strategic importance.
Commissioned under the DELFIN programme, the ship is the first of two planned SIGINT platforms designed to enhance Poland’s maritime electronic intelligence capabilities. Construction began with the first steel cut in April 2023, followed by keel laying in November that year. The vessel will now enter a fitting-out phase where Saab will install and integrate the full suite of mission systems, before the ship embarks on sea trials.
Named ORP Jerzy Różycki, the ship honours the renowned Polish mathematician and cryptologist who, alongside Marian Rejewski and Henryk Zygalski, played a critical role in breaking the German Enigma code before the Second World War.
Continues https://ukdefencejournal.org.uk/poland- ... ence-ship/
See https://tech.wp.pl/orp-jerzy-rozycki-ju ... 859636608a
And https://www.polsatnews.pl/wiadomosc/202 ... -wojennej/ Etc.