RN Frigates: Type 31 Inspiration Class
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Navy Lookout
Latest article:
MoD increasingly vague on when Royal Navy will get Type 31 frigates
https://navylookout.com/mod-increasingl ... -frigates/
Latest article:
MoD increasingly vague on when Royal Navy will get Type 31 frigates
https://navylookout.com/mod-increasingl ... -frigates/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Ministry of Defence scraps Type 31 support competition
The competition to provide through-life support for the Royal Navy’s Type 31 frigates has been discontinued after the department concluded that the assumptions behind it no longer held, according to answers given in Parliament.
Ben Obese-Jecty, the Conservative member for Huntingdon, asked what plans the Secretary of State had to replace the abandoned requirement, and separately in what way the assumptions underpinning it no longer held. Both questions referred to the corrigendum to tender 707770451, entitled Type 31 Through Life Support, published on 22 July.
Luke Pollard, Minister for Defence Readiness and Industry, said:
“The Type 31 Through Life Support procurement was discontinued following a review of the proposed approach. The Department concluded that the assumptions underpinning that procurement no longer reflected the most appropriate route for delivering support to the Type 31 class. Those assumptions included the delivery context for the programme and the way in which future support arrangements should be structured. The requirement to provide effective through-life support for the Type 31 fleet remains unchanged.
“The Department is now considering the most appropriate arrangements to meet that requirement. Any future procurement activity will be taken forward in accordance with Defence requirements, value for money considerations and established commercial procedures.”
A third question from Mr Obese-Jecty turned to the programme’s budget, asking when the minister planned to reset the Approved Budgetary Limit to mitigate the impact of inflation, with reference to the National Infrastructure and Service Transformation Authority Major Projects Annual Report for 2025 to 2026.
Mr Pollard said: “The Ministry of Defence keeps the affordability of all major programmes under continual review. In common with other enterprises, the Type 31 programme is experiencing inflationary pressures, and the impact of possible costs is being assessed. Any changes to programme budgets and approvals will be considered through the Department’s established governance processes. It would therefore be inappropriate to speculate on the timing of any future decisions.”
The answers give no indication of what the revised support model might look like. Type 31 covers five Inspiration class frigates under construction by Babcock at Rosyth.
Source UKDJ
The competition to provide through-life support for the Royal Navy’s Type 31 frigates has been discontinued after the department concluded that the assumptions behind it no longer held, according to answers given in Parliament.
Ben Obese-Jecty, the Conservative member for Huntingdon, asked what plans the Secretary of State had to replace the abandoned requirement, and separately in what way the assumptions underpinning it no longer held. Both questions referred to the corrigendum to tender 707770451, entitled Type 31 Through Life Support, published on 22 July.
Luke Pollard, Minister for Defence Readiness and Industry, said:
“The Type 31 Through Life Support procurement was discontinued following a review of the proposed approach. The Department concluded that the assumptions underpinning that procurement no longer reflected the most appropriate route for delivering support to the Type 31 class. Those assumptions included the delivery context for the programme and the way in which future support arrangements should be structured. The requirement to provide effective through-life support for the Type 31 fleet remains unchanged.
“The Department is now considering the most appropriate arrangements to meet that requirement. Any future procurement activity will be taken forward in accordance with Defence requirements, value for money considerations and established commercial procedures.”
A third question from Mr Obese-Jecty turned to the programme’s budget, asking when the minister planned to reset the Approved Budgetary Limit to mitigate the impact of inflation, with reference to the National Infrastructure and Service Transformation Authority Major Projects Annual Report for 2025 to 2026.
Mr Pollard said: “The Ministry of Defence keeps the affordability of all major programmes under continual review. In common with other enterprises, the Type 31 programme is experiencing inflationary pressures, and the impact of possible costs is being assessed. Any changes to programme budgets and approvals will be considered through the Department’s established governance processes. It would therefore be inappropriate to speculate on the timing of any future decisions.”
The answers give no indication of what the revised support model might look like. Type 31 covers five Inspiration class frigates under construction by Babcock at Rosyth.
Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Type 31 support deal being rethought
The Type 31 Through Life Support procurement has been discontinued after a review concluded that the assumptions behind it no longer reflected the right route for supporting the class, and the department is now considering fresh arrangements to meet a requirement it says is unchanged, according to answers given in Parliament.
See https://ukdefencejournal.org.uk/type-31 ... rethought/
The Type 31 Through Life Support procurement has been discontinued after a review concluded that the assumptions behind it no longer reflected the right route for supporting the class, and the department is now considering fresh arrangements to meet a requirement it says is unchanged, according to answers given in Parliament.
See https://ukdefencejournal.org.uk/type-31 ... rethought/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Ministers monitoring Type 31 schedule risk with Babcock
The Ministry of Defence continues to monitor Babcock’s financial position and delivery performance on the Type 31 frigate programme and is working with the company to manage schedule risks, while declining to comment on the cumulative loss the firm has taken on the fixed-price contract, according to an answer given in Parliament.
Ben Obese-Jecty, the Conservative member for Huntingdon, asked what information the department holds on the total cumulative loss sustained to date by Babcock on the fixed-price contract for the Type 31, and what assessment had been made of the potential impact of that loss on the delivery schedule.
See https://ukdefencejournal.org.uk/ministe ... h-babcock/
The Ministry of Defence continues to monitor Babcock’s financial position and delivery performance on the Type 31 frigate programme and is working with the company to manage schedule risks, while declining to comment on the cumulative loss the firm has taken on the fixed-price contract, according to an answer given in Parliament.
Ben Obese-Jecty, the Conservative member for Huntingdon, asked what information the department holds on the total cumulative loss sustained to date by Babcock on the fixed-price contract for the Type 31, and what assessment had been made of the potential impact of that loss on the delivery schedule.
See https://ukdefencejournal.org.uk/ministe ... h-babcock/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Type 31 costs rising in labour and the supply chain
Inflation is pushing up the cost of the Type 31 frigate programme across labour and the wider supply chain, and the Ministry of Defence is assessing what that does to the affordability of the programme as a whole.
https://ukdefencejournal.org.uk/type-31 ... ply-chain/
Inflation is pushing up the cost of the Type 31 frigate programme across labour and the wider supply chain, and the Ministry of Defence is assessing what that does to the affordability of the programme as a whole.
https://ukdefencejournal.org.uk/type-31 ... ply-chain/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Navy Lookout
Type 31 frigates (ships 3 & 4) HMS Bulldog and HMS Formidable under construction in the Venturer building at Babcock plc Rosyth
Type 31 frigates (ships 3 & 4) HMS Bulldog and HMS Formidable under construction in the Venturer building at Babcock plc Rosyth
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
HMS Venturer to be delivered to the Royal Navy in 2028
Babcock has confirmed they expect to deliver HMS Venturer to the RN in 2028, around two years later than the handover anticipated when she was launched. The date provides some clarity on the delayed Type 31 programme, but delivery is a very different milestone from being ready for operations.
Babcock’s marine chief executive Sir Nick Hine told the Scotsman that he was trying to contain the impact of delays across the five-ship programme. However, the speed at which the customer can accept and introduce the ships into service will influence the overall timetable.
Hine points primarily to external pressures since the contract was signed in 2019, including COVID and the war in Ukraine. Rising energy, labour and supply chain costs have squeezed a programme constrained by its funding profile. Some mistakes were also made in the early construction phases of the first two ships, with Babcock absorbing the costs. Together with the external pressures, maintaining the required performance within a restricted financial envelope has inevitably caused the schedule to slip.
The potentially greater concern now lies on the customer’s side. There are unconfirmed indications that shortages of suitably qualified personnel within the RN and National Armaments Director Group could constrain the acceptance process. The extent of this problem has not been publicly established, but a shortage of people authorised to assess evidence and approve systems risks adding another queue between completion at Rosyth and operational service.
There are also concerns that so far, the MoD is unwilling to simplify its approach to certification after delivery. This process requires inspections and tests to ensure the ship is safe and performing as specified. Sticking to very strict certification procedures because this is always how we have done it is difficult to justify when the RN’s desperately needs ships as quickly as possible. Taking a common sense approach, balancing safety with a determination to get a minimum deployable capability to sea quickly should be the priority.
A similar issue was encountered when the aircraft carriers were brought into service. This forced the MoD to make use of personnel employed by the shipbuilders, although partially a case of marking your own homework, this reduced some of the delay. More broadly, the situation can be traced back to the disastrous erosion of the MoD’s own in-house design, engineering and technical assurance expertise. Successive reductions and the transfer of greater responsibility to industry have weakened the department’s ability to act as an informed customer and write good contracts. Experienced engineers provide the judgement needed to challenge contractors, assess evidence and approve proportionate solutions. Without sufficient people able and empowered to make those decisions, elaborate approval processes risk becoming a substitute for technical confidence, adding delay when the fleet can least afford it.
Similar issues also apply to getting the first Type 26 frigates into service. An embarrassing scenario must be avoided where brand new ships are tied up alongside, unable to go to sea due to lack of certification specialists and a rigid adherence to process. At a time when threats are rising and the frigate force is close to collapse, this would be unacceptable and could also undermine UK warship export success.
Source Navy Lookout
Babcock has confirmed they expect to deliver HMS Venturer to the RN in 2028, around two years later than the handover anticipated when she was launched. The date provides some clarity on the delayed Type 31 programme, but delivery is a very different milestone from being ready for operations.
Babcock’s marine chief executive Sir Nick Hine told the Scotsman that he was trying to contain the impact of delays across the five-ship programme. However, the speed at which the customer can accept and introduce the ships into service will influence the overall timetable.
Hine points primarily to external pressures since the contract was signed in 2019, including COVID and the war in Ukraine. Rising energy, labour and supply chain costs have squeezed a programme constrained by its funding profile. Some mistakes were also made in the early construction phases of the first two ships, with Babcock absorbing the costs. Together with the external pressures, maintaining the required performance within a restricted financial envelope has inevitably caused the schedule to slip.
The potentially greater concern now lies on the customer’s side. There are unconfirmed indications that shortages of suitably qualified personnel within the RN and National Armaments Director Group could constrain the acceptance process. The extent of this problem has not been publicly established, but a shortage of people authorised to assess evidence and approve systems risks adding another queue between completion at Rosyth and operational service.
There are also concerns that so far, the MoD is unwilling to simplify its approach to certification after delivery. This process requires inspections and tests to ensure the ship is safe and performing as specified. Sticking to very strict certification procedures because this is always how we have done it is difficult to justify when the RN’s desperately needs ships as quickly as possible. Taking a common sense approach, balancing safety with a determination to get a minimum deployable capability to sea quickly should be the priority.
A similar issue was encountered when the aircraft carriers were brought into service. This forced the MoD to make use of personnel employed by the shipbuilders, although partially a case of marking your own homework, this reduced some of the delay. More broadly, the situation can be traced back to the disastrous erosion of the MoD’s own in-house design, engineering and technical assurance expertise. Successive reductions and the transfer of greater responsibility to industry have weakened the department’s ability to act as an informed customer and write good contracts. Experienced engineers provide the judgement needed to challenge contractors, assess evidence and approve proportionate solutions. Without sufficient people able and empowered to make those decisions, elaborate approval processes risk becoming a substitute for technical confidence, adding delay when the fleet can least afford it.
Similar issues also apply to getting the first Type 26 frigates into service. An embarrassing scenario must be avoided where brand new ships are tied up alongside, unable to go to sea due to lack of certification specialists and a rigid adherence to process. At a time when threats are rising and the frigate force is close to collapse, this would be unacceptable and could also undermine UK warship export success.
Source Navy Lookout
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Babcock signs Thales and Kraken for drone warship framework
Thales, Kraken Technology Group, Hensoldt, Exail, SH Defence, CUBEDIN and Stormborn have joined Babcock’s ARMOR Force framework, with Babcock acting as single accountable integrator for navies buying crewed and uncrewed fleets, according to the company.
=
"Babcock unveiled ARMOR Force last December with a Type 31 frigate commanding large uncrewed vessels from HII’s ROMULUS programme, and has offered the Royal Navy, without any confirmed contract, an early demonstration in 2027 using HMS Venturer and an HII vessel. Kraken already supplies the Royal Navy, which is buying 20 of its uncrewed vessels under Project Beehive."
=
See https://ukdefencejournal.org.uk/babcock ... framework/ For full article.
Thales, Kraken Technology Group, Hensoldt, Exail, SH Defence, CUBEDIN and Stormborn have joined Babcock’s ARMOR Force framework, with Babcock acting as single accountable integrator for navies buying crewed and uncrewed fleets, according to the company.
=
"Babcock unveiled ARMOR Force last December with a Type 31 frigate commanding large uncrewed vessels from HII’s ROMULUS programme, and has offered the Royal Navy, without any confirmed contract, an early demonstration in 2027 using HMS Venturer and an HII vessel. Kraken already supplies the Royal Navy, which is buying 20 of its uncrewed vessels under Project Beehive."
=
See https://ukdefencejournal.org.uk/babcock ... framework/ For full article.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
Navy Lookout
Forward and aft masts installed on second Type 31 frigate, HMS Active under construction in Number 1 dry dock in Rosyth.
These masts, which have a combined weight of 48 tonnes, were lifted into place using the 68m tall ‘Goliath’ crane.
Via @Babcockplc Video https://x.com/NavyLookout/status/212373 ... 82/video/1
And https://www.facebook.com/reel/1629386551737588
Forward and aft masts installed on second Type 31 frigate, HMS Active under construction in Number 1 dry dock in Rosyth.
These masts, which have a combined weight of 48 tonnes, were lifted into place using the 68m tall ‘Goliath’ crane.
Via @Babcockplc Video https://x.com/NavyLookout/status/212373 ... 82/video/1
And https://www.facebook.com/reel/1629386551737588
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: RN Frigates: Type 31 Inspiration Class
British frigate HMS Active takes shape in Scotland
The forward and mid masts have been installed on HMS Active, the second of five Type 31 frigates being built at Rosyth for the Royal Navy, moving the ship into the final stages of structural assembly, according to Babcock.
The two masts, with a combined weight of 48 tonnes, were lifted into place using Rosyth’s 68-metre Goliath crane, and Babcock said outfitting is continuing alongside the structural work.
Charlotte Holden, Head of Ship Build Structures for Type 31 at Babcock, said: “This marks another milestone of the Type 31 programme with the installation of the forward and mid mast on HMS Active, the second of the five Type 31 ships. The ships are built using modular construction within the synchrolift and the Venturer Hall, which is just here, before coming out here to install the tallest components. This means that we can build efficiency into the programme, bringing the ship out here means we can bring other ships into the build hall, and it means we’re independent of the weather. The progress we’ve made on HMS Active is a testament to the capability that we have in Rosyth and within our wider shipbuilding team, and it’s another step forward for the Type 31 programme.”
Active was rolled out of the Venturer Hall in February, when construction also began on HMS Bulldog, the government said when it announced that the warship programme had reached milestones for two ships.
The Venturer building lets Babcock build two frigates at once and forms part of about £200 million the company has invested at Rosyth. The government said the programme sustains 1,250 jobs at Babcock and 1,250 more in the UK supply chain, along with over 400 apprenticeships.
In March Active entered the water for the first time, in a float-off carried out entirely at Rosyth for the first time on the programme, the UK Defence Journal reported when the new British frigate entered the water for the first time.
The 5,700-tonne Inspiration-class frigates carry a 57mm gun and Sea Ceptor air defence missiles, have a mission bay for modular payloads and can operate a Wildcat or Merlin helicopter, with all five expected to enter service by 2030. The first of the class is HMS Venturer.
See https://ukdefencejournal.org.uk/british ... -scotland/ For embedded links.
The forward and mid masts have been installed on HMS Active, the second of five Type 31 frigates being built at Rosyth for the Royal Navy, moving the ship into the final stages of structural assembly, according to Babcock.
The two masts, with a combined weight of 48 tonnes, were lifted into place using Rosyth’s 68-metre Goliath crane, and Babcock said outfitting is continuing alongside the structural work.
Charlotte Holden, Head of Ship Build Structures for Type 31 at Babcock, said: “This marks another milestone of the Type 31 programme with the installation of the forward and mid mast on HMS Active, the second of the five Type 31 ships. The ships are built using modular construction within the synchrolift and the Venturer Hall, which is just here, before coming out here to install the tallest components. This means that we can build efficiency into the programme, bringing the ship out here means we can bring other ships into the build hall, and it means we’re independent of the weather. The progress we’ve made on HMS Active is a testament to the capability that we have in Rosyth and within our wider shipbuilding team, and it’s another step forward for the Type 31 programme.”
Active was rolled out of the Venturer Hall in February, when construction also began on HMS Bulldog, the government said when it announced that the warship programme had reached milestones for two ships.
The Venturer building lets Babcock build two frigates at once and forms part of about £200 million the company has invested at Rosyth. The government said the programme sustains 1,250 jobs at Babcock and 1,250 more in the UK supply chain, along with over 400 apprenticeships.
In March Active entered the water for the first time, in a float-off carried out entirely at Rosyth for the first time on the programme, the UK Defence Journal reported when the new British frigate entered the water for the first time.
The 5,700-tonne Inspiration-class frigates carry a 57mm gun and Sea Ceptor air defence missiles, have a mission bay for modular payloads and can operate a Wildcat or Merlin helicopter, with all five expected to enter service by 2030. The first of the class is HMS Venturer.
See https://ukdefencejournal.org.uk/british ... -scotland/ For embedded links.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.