AUKUS - Pillar 1

Submarines of the fleet
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

AUKUS Partners Announce Changes To Submarine Agreement, Launch Joint Development For Underwater Drone Payloads

The three AUKUS partners Australia, the United Kingdom and the United States have published a new statement on the side of the Shangi La-Dialogue in Singapore. The declaration notably changes the acquisition of Virginia-class nuclear powered submarines by Australia under the AUKUS Pillar I “Optimal Pathway”. Also part of this agreement is the intention to collaborate on developing payloads for uncrewed underwater vehicles (UUV) under AUKUS Pillar II.

Joint Statement, AUKUS Defence Ministers’ Meeting

30 May 2026

Today the Honourable Richard Marles MP, Australian Deputy Prime Minister and Minister for Defence, the Honorable Pete Hegseth, U.S. Secretary of War, and the Right Honourable John Healey MP, UK Secretary of State for Defence, met at the U.S. Embassy in Singapore and re-affirmed their commitment to delivering the AUKUS partnership.

Continues https://www.navalnews.com/naval-news/20 ... -payloads/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Navy Lookout
The SSN-AUKUS programme is in the Detailed Design and Long Lead (D2L2) phase, with contracts totalling around £4 billion having been placed so far.
Steel will be cut for the first submarine in Barrow next year

Navy Lookout
This week Rolls-Royce Submarines officially started work on new facilities that will double the size of its submarine nuclear reactor manufacturing site at Raynesway in Derby. #AUKUS
See also https://navylookout.com/the-evolution-o ... tral-role/
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Australia Selects Leidos Gibbs & Cox for AUKUS Dry Dock Design

The Australian government has announced the selection of Leidos Gibbs and Cox to design a floating dry dock supporting AUKUS infrastructure.

See https://www.navalnews.com/naval-news/20 ... ck-design/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Naval News
Australian industry has reached an important AUKUS milestone, with Australian-produced submarine-grade steel set to be used in the construction of United States Navy Virginia-class submarines for the first time
See https://www.navalnews.com/naval-news/20 ... struction/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Navy Lookout
Latest Analysis article:
Foundations laid for major expansion of the Royal Navy nuclear submarine fleet
The Defence Nuclear Enterprise 2026 Update to Parliament published this week confirms that steel will be cut on the first RN SSN-AUKUS submarine in 2027, but leaves the size of the fleet to be decided by the end of 2028. Here we examine the risks in that timing and how the 18-month build rate ties the attack submarine programme to the eventual replacement of the Dreadnought class.
See https://www.navylookout.com/foundations ... ine-fleet/
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Steel to be cut on first new generation British attack sub

Steel will be cut on the first British SSN-AUKUS submarine in 2027 under current plans, marking the start of production on the class that will replace the Astute boats, according to the Defence Nuclear Enterprise annual update to Parliament.

The programme has already placed contracts worth around £4 billion, supporting development of the capability and the industrial infrastructure needed to deliver the next generation of attack submarines.

The update states that the programme “remains focused on delivering the first Royal Navy SSN-AUKUS submarine into service in the late 2030s”.

SSN-AUKUS is being developed through the partnership with the United States and Australia, and is based on a British design. It is currently progressing through the Detailed Design and Long Lead phase, with decisions on the total number of submarines to be procured expected before that phase ends in 2028. Construction of the British boats will take place at BAE Systems’ Barrow shipyard, while Australia will build its own at Osborne Naval Shipyard in South Australia. The next generation of nuclear reactors for all SSN-AUKUS submarines, including Australia’s, will be built at Rolls-Royce Submarines’ Raynesway site near Derby.

Britain will also supply key components to the Australian programme while Australia develops its industrial capacity, which the update describes as creating a resilient supply chain across both nations. Australia has invested £2.4 billion over ten years to boost Rolls-Royce infrastructure and to share costs on the submarine design, an investment the update presents as recognition of the importance of British industry to developing the capability.

The Geelong Treaty signed between Britain and Australia in July 2025 further strengthened the partnership, and the update describes it as an agreement for the next fifty years of bilateral defence cooperation under AUKUS Pillar I, enabling comprehensive cooperation on the design, build, operations, sustainment and disposal of the submarines. That was followed in March 2026 by the visit of the Astute-class HMS Anson to HMAS Stirling in Perth for a submarine maintenance period, which the update describes as a major milestone in delivering the Pillar 1 Optimal Pathway.

Preparing to build the class requires work on the yards as well as the design. In early 2026 the concept design was completed for SMITE2, a new submarine propulsion testing facility at Barrow, which the update says will deliver modernised and expanded engine and machinery assessment essential to sustaining an accelerated production tempo. At Raynesway, work includes the recent groundbreaking of a major Primary Components and Operations Facility alongside improved site access and advanced prototyping facilities.

The wider objective set out in the update is a drumbeat of one submarine every eighteen months, supported by £6 billion committed under the Defence Investment Plan for infrastructure at Barrow and Raynesway. A Submarine Production Alliance is being established to bring BAE Systems, Rolls-Royce Submarines and Babcock together with the Ministry of Defence to deliver future programmes.

Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Mounting concern in Australia over UK ability to deliver SSN-AUKUS

In this guest article, Rear Admiral Peter Briggs, RAN (Rtd), articulates the worries held by some amongst the defence establishment in Australia about the promises the UK has made on submarine delivery. Some consider statements emanating from the UK Defence Nuclear Enterprise to be public relations rhetoric that do not reflect the true state of the enterprise.

For Australian observers, the contrast between official PR and the engineering realities of the DNE is stark. While visiting UK officials recently assured Australian audiences that the SSN-AUKUS program is on track, a common-sense, empirical examination of Royal Navy operational deployment data reveals it to be running perilously close to complete shutdown. For Australia, which is relying on receiving a mature, fully debugged submarine design in time to commence construction, these UK baseline failures carry profound strategic risk.

Operating on the absolute edge https://www.navylookout.com/mounting-co ... ssn-aukus/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

AUKUS: HII Awarded Contract for Engineering and Design Support

HII announced that its Newport News Shipbuilding (NNS) division was awarded a $56 million contract by the U.S. Navy for shipbuilding engineering and design in support of the trilateral Australia, United Kingdom, and United States (AUKUS) partnership.

HII press release

The contract includes an option which, if exercised, would bring the cumulative value of this contract to $91 million. HII continues to take a whole-company approach to support the AUKUS agreement, providing services and support for AUKUS across its business divisions.

Continues https://www.navalnews.com/naval-news/20 ... n-support/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Navy Lookout
Latest guest article:
The case for AUKUS nations building floating submarine dry docks together
https://www.navylookout.com/the-case-fo ... -together/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: AUKUS - Pillar 1

Unread post by Pelican »

Ministry of Defence
Three nations, one shared mission.
The AUKUS programme is a cornerstone of defence for GB, AU & US.
Maritime Big Play is now underway in San Diego and will showcase how all three partner nations can integrate, coordinate and fight together across the entire maritime domain.
Video https://x.com/DefenceHQ/status/21121354 ... 83/video/1
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “RN Submarines”