Current RN News and Updates

Add your posts about Royal Navy ships in this section
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

Why defence must open its doors to the 9.6 million

The Fair Chance Business Alliance (FCBA) is encouraging UK employers to tap into a talent pool of 9.6 million working-age people with criminal records as it launches a new national campaign to advance fair chance hiring at scale as an effective solution to widening skills gaps and persistent workforce shortages.

The call to action forms a crucial part of ‘Unite 1K,’ a landmark campaign launched during the UK’s inaugural Fair Chance Week to mobilise 1,000 employers to embed truly inclusive hiring practices through adoption of the Fair Chance Charter, a ‘Disability Confident’ for the justice sector.

See https://ukdefencejournal.org.uk/why-def ... 6-million/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

VLS timeline on new British warships yet to be confirmed

The Ministry of Defence has declined to provide timelines for either Initial Operating Capability or Full Operating Capability for the Mk 41 Vertical Launch System on Royal Navy warships, telling Parliament that in-service dates will be confirmed in due course, the UK Defence Journal understands.

Continues https://ukdefencejournal.org.uk/vls-tim ... confirmed/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Brian James
Posts: 13234
Joined: Sun Aug 12, 2018 6:58 am

Re: Current RN News and Updates

Unread post by Brian James »

HMS Somerset conducts a RAS with Tide Class Replenishment Tanker RFA Tidespring, North Atlantic on May 1st 2026.
You do not have the required permissions to view the files attached to this post.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

The Royal Navy’s Newest Nightmare: It Built Its Frigates the Wrong Way

British shipbuilder Babcock acknowledged that it had assembled two Type 31 frigates “out of sequence,” necessitating extensive rework and delays.

Throughout the 19th and early 20th centuries, the UK’s Royal Navy was a much-feared fighting force. In the 21st century, it is somewhat less so; the Royal Navy has become a shell of its former self, with more admirals than active duty warships. Setting the course right has been no easy task.

Earlier this month, it was revealed that the first two of the senior service’s much-hyped Type 31 Inspiration-class frigates, meant to be the workhorses of the fleet, had been assembled out of sequence. That isn’t a simple misunderstanding, either. It has resulted in months of delays, with the costs expected to be as high as £140 million ($187 million) to rectify.

The Type 31 Frigates Will Be Delayed to Fix the Issue—Again

The Type 31 frigate program has already faced significant delays. HMS Venturer was slated to enter service in 2023, with all five of the planned warships to be operational by the early 2030s. The schedule was pushed back, with HMS Venturer set to begin operations in 2027.

That timeline has been scrapped, and it might not be until the end of the decade that the Royal Navy sees the frigate make its maiden deployment.

The news comes just weeks after the Royal Navy confirmed that its oldest Type 23 Duke-class frigate, HMS Iron Duke (F234), would be withdrawn from service, despite that warship having undergone a five-year refit costing the British taxpayer £103 million ($139.5 million). To suggest the Royal Navy is throwing good money after bad is an understatement at this point.

Plans call for the warships to be upgraded to receive the future Mk 41 VLS, which could greatly improve their firepower, at a later date, during a “Capability Insertion Period.” The warships are “fitted-for-not-with” the VLS. That was meant to speed their entry into service, which almost seems moot now!

Moreover, it will mean the warships will need to be sidelined for a refit in the near future.

The Type 31 frigates were developed as part of the UK’s national shipbuilding strategy and to get the Royal Navy back on course. Instead, after years of delays, the frigates are just another hole in the water that the British taxpayer keeps throwing money into!

Full article at https://nationalinterest.org/blog/buzz/ ... -ps-051626 LFT
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

Royal Navy considers purchase of vertical launch anti-submarine rocket

The RN has issued a Request for Information (RFI) notice to industry for what it calls a future Long Range Anti-Submarine Warfare Weapon (LRAW). Here we consider the options and what the implications would be if this weapon is brought into service.

Testing the market
In simple terms, LRAW can be described as a missile fired from a Mk41 VLS cell that can deliver a lightweight (or very lightweight) anti-submarine torpedo beyond the range of existing submarine-launched heavyweight torpedoes. The RN says LRAW must integrate with its combat and sonar systems and 500 missiles should be used as the costing assumption. It should be emphasised that an RFI is in no way a commitment to procurement and is just a method of gathering proposals from industry in order to understand what is available.

The RFI is also clear the RN is not seeking the torpedo, only the missile to deliver it. LRAW would therefore probably carry either the existing Sting Ray Mod 1 or more likely, the Future Lightweight Torpedo currently under development by BAE Systems. The RN will consider proposals for, completely novel solutions, MOTS (Military off the shelf) – ie. existing weapons or modifications of an existing missile design.

Continues https://www.navylookout.com/royal-navy- ... ne-rocket/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

Royal Navy long-range sub-hunting missile still in concept phase

The Ministry of Defence has told Parliament that the Long-Range Anti-Submarine Warfare Weapon remains in its early concept phase, with delivery timelines to be determined subject to the outcome of the Defence Investment Plan.

See https://ukdefencejournal.org.uk/royal-n ... ept-phase/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

Type 83 destroyer timeline yet to be confirmed

The Ministry of Defence has again declined to provide any detail on progress toward the Type 83 destroyer programme, referring a parliamentary question about whether the ship will be ready by 2038 back to a holding answer first given in January.

See https://ukdefencejournal.org.uk/type-83 ... confirmed/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: Current RN News and Updates

Unread post by jbryce1437 »

HMS Middleton leaving the Port of Sunderland tonight after a port visit.

Jim

Also, an interesting link from recent times

DSC09137a.JPG
You do not have the required permissions to view the files attached to this post.
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

HMS Medway arrives at Tristan da Cunha with medics and supplies

Royal Navy OPV, HMS Medway has arrived off the remote South Atlantic island of Tristan da Cunha, carrying six civilian medics and critical supplies to support a British national suspected of contracting Hantavirus.

The ship deployed from the Falkland Islands on 14th May and made the journey of 7 days to reach one of the world’s most isolated inhabited territories. The supplies and additional medical personnel will be transferred ashore once weather conditions allow.

The operation follows an earlier phase in which paratroopers from 16 Air Assault Brigade parachuted onto the island on 10 May, accompanied by two military clinicians. RAF aircrew flew a round trip of approximately 19,500 km to deliver the team and initial medical supplies with precision. HMS Medway will remain in the area for several days before extracting that team once the handover to the civilian medics is complete.

Continues https://www.navylookout.com/hms-medway- ... -supplies/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: Current RN News and Updates

Unread post by Pelican »

First Sea Lord insists no alternative to Hybrid Navy

The Royal Navy (RN) has no choice but to pivot to an increasingly uncrewed and autonomous hybrid fleet if it is to achieve the lethality, survivability, persistence and mass necessary for warfighting in the North Atlantic and High North, the head of the service has said.

Speaking at the Defence Leaders Combined Naval Event (CNE) 2026 conference and exhibition in Farnborough on 19 May, First Sea Lord and Chief of Naval Staff General Sir Gwyn Jenkins warned that legacy force design could no longer deliver the capabilities required to meet the challenge from Russian surface and subsurface forces. “We are at a fork in the road, and the decisions we take now will have seismic and lasting consequences, not just for the Royal Navy, but our nation’s security and prosperity for our very way of life,” he said. “The capable status quo is not good enough, not anymore.”

The key RN proposition into the 2025 Strategic Defence Review, the Hybrid Navy concept envisages a mix of crewed, uncrewed and increasingly autonomous ships, submarines and aircraft operating as an integrated force. Instead of concentrating capabilities and effects in a small number of high cost platforms, the new model spreads functions – sense, decide, effect, connect, host and enable – across multiple interconnected platforms. Proponents argue that this approach delivers more capability for a given cost, increases mass and firepower, and gives commanders more flexible and resilient options.

The RN intends that Hybrid Navy will underpin its three core ‘Atlantic-series’ activities: ‘Atlantic Bastion’, which will protect the continuous at-sea deterrent and critical national infrastructure through the deployment of new anti-submarine warfare capabilities, autonomous sub-surface systems, and a layered sensor network; ‘Atlantic Shield’, which represents the maritime contribution to integrated air and missile defense; and ‘Atlantic Strike’ as the means to deliver force projection at and from the sea

Giving the CNE 2026 keynote address, General Jenkins said the shift to the Hybrid Navy – which as been both informed and influenced by Ukrainian successes in the Black Sea – marked a decisive move away from a mindset demanding ever bigger and more expensive platforms. “That is an outdated approach that no longer holds,” he told attendees.

“What we need to do is to reduce the cost per unit and time for production to achieve the scale we need, because the reality is that there is no scenario in which we have unlimited resources. There will never be enough resource.”
“Our task is to do the best with that available, and be able to scale it rapidly when needed. The approach is therefore simple: crewed where necessary, uncrewed wherever possible, and integrated always.”

First Sea Lord and Chief of Naval Staff General Sir Gwyn Jenkins

See https://www.navalnews.com/event-news/cn ... brid-navy/


Also see:
Navantia UK unveils LASV75 autonomous surface vessel concept
Navantia UK publicly unveiled a scale model of its new LASV75 large autonomous surface vessel concept during the Navy Leaders Combined Naval Event (CNE), held in Farnborough from 19-21 May.
The concept design, dubbed LASV75, is intended to support the UK Royal Navy’s (RN’s) emerging ‘hybrid navy’ construct of crewed, uncrewed and autonomous platforms, the shipbuilder said.
Based on a modular 75 meters-long hull and displacing more than 1,000 tonnes, the LASV75 is designed to carry out a range of missions either independently or in support of a task group, including surveillance, escort, electronic warfare and strike-related operations depending on payload configuration.
Continues with photos and video https://www.navalnews.com/event-news/cn ... l-concept/
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”