F35 Airwing
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
Northrop delivers 1500th F-35 fuselage section
Northrop Grumman has delivered its 1,500th centre fuselage for the F-35 Lightning II programme from its Integrated Assembly Line in Palmdale, California, the company stated.
The milestone was reached on 12 January and reflects continued production of centre fuselage sections for all three variants of the F-35 stealth fighter. Northrop Grumman said the work forms a core element of its role as a principal partner on the international F-35 programme. According to the company, the Palmdale Integrated Assembly Line uses advanced manufacturing technologies to produce a completed centre fuselage approximately every 30 hours. The single production line supports assembly for the conventional take-off and landing, short take-off and vertical landing, and carrier variants of the aircraft.
Northrop Grumman said the use of augmented and virtual reality tools has contributed to reductions in assembly time and technician training requirements, supporting increased production efficiency. As part of the wider F-35 industrial team, Northrop Grumman is responsible for several major systems and structures. The company produces the aircraft’s AN/APG-81 active electronically scanned array radar and the integrated communications, navigation and identification system, as well as wing skins and elements of the aircraft’s low observable technologies.
In addition to manufacturing responsibilities, Northrop Grumman also provides sustainment support for F-35 operators in the United States and internationally, according to the company.
See https://ukdefencejournal.org.uk/northro ... e-section/
Northrop Grumman has delivered its 1,500th centre fuselage for the F-35 Lightning II programme from its Integrated Assembly Line in Palmdale, California, the company stated.
The milestone was reached on 12 January and reflects continued production of centre fuselage sections for all three variants of the F-35 stealth fighter. Northrop Grumman said the work forms a core element of its role as a principal partner on the international F-35 programme. According to the company, the Palmdale Integrated Assembly Line uses advanced manufacturing technologies to produce a completed centre fuselage approximately every 30 hours. The single production line supports assembly for the conventional take-off and landing, short take-off and vertical landing, and carrier variants of the aircraft.
Northrop Grumman said the use of augmented and virtual reality tools has contributed to reductions in assembly time and technician training requirements, supporting increased production efficiency. As part of the wider F-35 industrial team, Northrop Grumman is responsible for several major systems and structures. The company produces the aircraft’s AN/APG-81 active electronically scanned array radar and the integrated communications, navigation and identification system, as well as wing skins and elements of the aircraft’s low observable technologies.
In addition to manufacturing responsibilities, Northrop Grumman also provides sustainment support for F-35 operators in the United States and internationally, according to the company.
See https://ukdefencejournal.org.uk/northro ... e-section/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
Navy Lookout
Joint Project Office promotional video - The F-35's year in review
https://youtube.com/watch?v=DB4o7dz4weI
Joint Project Office promotional video - The F-35's year in review
https://youtube.com/watch?v=DB4o7dz4weI
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
CSG to head to the High North – with doubt cast on the F-35's ability to cope with the cold
From freezing fuel to ice building up on aircraft, operating in the High North presents a challenge – one the RAF may not be quite ready for.
It's something that worries the Chief of the Air Staff, Air Chief Marshal Harv Smyth, according to his comments reported in The Telegraph.
Speaking at an event at the Royal Aeronautical Society, ACM Smyth said the service had become "incredibly good" at operating in temperatures above 35 degrees thanks to its operational deployments to Iraq and Afghanistan.
Not 100 per cent sure
However, he said he was less certain about the RAF's readiness for operations in the extreme cold.
"It's a much more hostile environment," he said. "We have become an air force that's incredibly good at operating in the Middle East.
"I know I can send any squadron out the door and they can work in plus 35 degrees and make airplanes work and fly really good missions.
"I'm not 100% sure we could do that in minus 30 degrees."
With the UK set to deploy a new carrier strike group to the High North later this year, preparedness for cold climes will be high on the agenda across the military.
What sort of challenges will personnel face? https://www.forcesnews.com/services/raf ... -cope-cold
From freezing fuel to ice building up on aircraft, operating in the High North presents a challenge – one the RAF may not be quite ready for.
It's something that worries the Chief of the Air Staff, Air Chief Marshal Harv Smyth, according to his comments reported in The Telegraph.
Speaking at an event at the Royal Aeronautical Society, ACM Smyth said the service had become "incredibly good" at operating in temperatures above 35 degrees thanks to its operational deployments to Iraq and Afghanistan.
Not 100 per cent sure
However, he said he was less certain about the RAF's readiness for operations in the extreme cold.
"It's a much more hostile environment," he said. "We have become an air force that's incredibly good at operating in the Middle East.
"I know I can send any squadron out the door and they can work in plus 35 degrees and make airplanes work and fly really good missions.
"I'm not 100% sure we could do that in minus 30 degrees."
With the UK set to deploy a new carrier strike group to the High North later this year, preparedness for cold climes will be high on the agenda across the military.
What sort of challenges will personnel face? https://www.forcesnews.com/services/raf ... -cope-cold
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
UK reaffirms F-35 commitment but questions remain over 138
The government has reaffirmed its commitment to procuring 138 F-35 Lightning aircraft across the life of the programme, but a series of parliamentary answers this week raises as many questions as they answer about what that figure actually means in practice, given the tortured history of the commitment and the continued absence of any concrete plan to reach it.
Continues https://ukdefencejournal.org.uk/uk-reaf ... -over-138/
The government has reaffirmed its commitment to procuring 138 F-35 Lightning aircraft across the life of the programme, but a series of parliamentary answers this week raises as many questions as they answer about what that figure actually means in practice, given the tortured history of the commitment and the continued absence of any concrete plan to reach it.
Continues https://ukdefencejournal.org.uk/uk-reaf ... -over-138/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
UK completes initial F-35B procurement
Lockheed Martin has delivered the 46th, 47th and 48th F-35B aircraft to the United Kingdom, fulfilling the initial procurement phase of the programme and completing the first contracted batch of jets for the Royal Air Force and Royal Navy, according to the company.
See https://ukdefencejournal.org.uk/uk-comp ... ocurement/
Lockheed Martin has delivered the 46th, 47th and 48th F-35B aircraft to the United Kingdom, fulfilling the initial procurement phase of the programme and completing the first contracted batch of jets for the Royal Air Force and Royal Navy, according to the company.
See https://ukdefencejournal.org.uk/uk-comp ... ocurement/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
UK's 48th F-35B arrives at RAF Marham with first Lightning order now completed
By 2033, the UK is expected to have a full operating capacity of 74 of the fifth-generation fighter jets (Picture: RAF)
The UK’s 48th F-35B has arrived at RAF Marham, completing the first procurement phase of the Lightning programme.
The aircraft, serial number BK48, touched down at the Norfolk base after leaving Lockheed Martin's production line in Fort Worth, Texas, alongside BK46 and BK47.
The three jets crossed the Atlantic with support from a Voyager air-to-air refuelling tanker from RAF Brize Norton.
USAF marks a first in Finland as F-35A Lightning II jets come in to land on highway
A sledgehammer to crack a nut: Ex-fighter pilot's take on F-35 downing drone
F-35 pilot on downing two Shahed drones in Royal Navy operational first
The delivery completes the UK's initial order of 48 F-35Bs, the short take-off and vertical landing variant operated by the RAF and Royal Navy.
The fleet now stands at 47 aircraft after BK18, an F-35B from 617 Squadron, was lost while operating from HMS Queen Elizabeth in 2021.
Continues https://www.forcesnews.com/services/raf ... -completed
By 2033, the UK is expected to have a full operating capacity of 74 of the fifth-generation fighter jets (Picture: RAF)
The UK’s 48th F-35B has arrived at RAF Marham, completing the first procurement phase of the Lightning programme.
The aircraft, serial number BK48, touched down at the Norfolk base after leaving Lockheed Martin's production line in Fort Worth, Texas, alongside BK46 and BK47.
The three jets crossed the Atlantic with support from a Voyager air-to-air refuelling tanker from RAF Brize Norton.
USAF marks a first in Finland as F-35A Lightning II jets come in to land on highway
A sledgehammer to crack a nut: Ex-fighter pilot's take on F-35 downing drone
F-35 pilot on downing two Shahed drones in Royal Navy operational first
The delivery completes the UK's initial order of 48 F-35Bs, the short take-off and vertical landing variant operated by the RAF and Royal Navy.
The fleet now stands at 47 aircraft after BK18, an F-35B from 617 Squadron, was lost while operating from HMS Queen Elizabeth in 2021.
Continues https://www.forcesnews.com/services/raf ... -completed
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
F-35 availability will drop as corrosion backlog clears
May 14, 2026
The Ministry of Defence has warned that F-35 availability will fall in the short term as it works through a backlog of corrosion-related maintenance, according to a letter from Permanent Secretary Jeremy Pocklington to the Public Accounts Committee.
Pocklington’s letter, dated 30 April 2026, describes corrosion worsened by maritime exposure as a growing concern that “impacts the availability of aircraft and will need constant management throughout the life of the programme.” While acknowledging the issue affects all F-35 nations, the letter states that “as maintenance activities intensify a short-term reduction is expected to clear the backlog.”
The MoD says it is addressing the problem through enhanced corrosion awareness and preventative practices at front line squadrons, deeper inspections conducted with UK and US industry partners, the development of more corrosion-resistant solutions within the wider F-35 programme, and by pushing the F-35 Joint Programme Office and industry to create what the letter describes as “rapid, agile and coordinated responses to corrosion occurrences.”
The admission of a forthcoming availability reduction is notable given that the PAC’s October 2025 report already found F-35 availability to be below both UK and global programme targets. The corrosion problem was exacerbated during Operation HIGHMAST, the carrier strike group deployment to the Middle East, with the letter noting that prolonged maritime deployment worsened corrosion issues and increased post-deployment recovery time. Those lessons have since informed planning for subsequent detachments including the early 2026 Cyprus deployment.
Corrosion is a challenge for carrier-based aviation more broadly, with salt air and humidity accelerating degradation of airframe components and coatings. For a stealth aircraft like the F-35, whose radar-absorbent surface treatments are critical to its low-observable characteristics, corrosion management carries operational as well as maintenance implications.
Source UKDJ
May 14, 2026
The Ministry of Defence has warned that F-35 availability will fall in the short term as it works through a backlog of corrosion-related maintenance, according to a letter from Permanent Secretary Jeremy Pocklington to the Public Accounts Committee.
Pocklington’s letter, dated 30 April 2026, describes corrosion worsened by maritime exposure as a growing concern that “impacts the availability of aircraft and will need constant management throughout the life of the programme.” While acknowledging the issue affects all F-35 nations, the letter states that “as maintenance activities intensify a short-term reduction is expected to clear the backlog.”
The MoD says it is addressing the problem through enhanced corrosion awareness and preventative practices at front line squadrons, deeper inspections conducted with UK and US industry partners, the development of more corrosion-resistant solutions within the wider F-35 programme, and by pushing the F-35 Joint Programme Office and industry to create what the letter describes as “rapid, agile and coordinated responses to corrosion occurrences.”
The admission of a forthcoming availability reduction is notable given that the PAC’s October 2025 report already found F-35 availability to be below both UK and global programme targets. The corrosion problem was exacerbated during Operation HIGHMAST, the carrier strike group deployment to the Middle East, with the letter noting that prolonged maritime deployment worsened corrosion issues and increased post-deployment recovery time. Those lessons have since informed planning for subsequent detachments including the early 2026 Cyprus deployment.
Corrosion is a challenge for carrier-based aviation more broadly, with salt air and humidity accelerating degradation of airframe components and coatings. For a stealth aircraft like the F-35, whose radar-absorbent surface treatments are critical to its low-observable characteristics, corrosion management carries operational as well as maintenance implications.
Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
F-35 spares shortfall exposed as carrier surged to 24 jets
May 14, 2026
The Chair of the Public Accounts Committee has sharply criticised the Ministry of Defence over its management of F-35 spare parts, after the MoD’s Permanent Secretary wrote to the committee acknowledging that a carrier strike group deployment to the Middle East was conducted with insufficient spares to support the aircraft embarked, the UK Defence Journal understands.
The letter, dated 30 April 2026 and written by Permanent Secretary Jeremy Pocklington, was sent in response to the PAC’s October 2025 report on the UK’s F-35 stealth fighter capability. It reveals that during Operation HIGHMAST, the UK surged 24 F-35B aircraft onto a Queen Elizabeth-class carrier despite the Afloat Spares Pack being sized to support only 12 aircraft.
The shortfall was mitigated by drawing on the Deployable Spares Pack and taking additional spares from the RAF Marham Base Spares Pack, while maritime logistics challenges occasionally led to missed resupply opportunities during the deployment.
PAC Chair Sir Geoffrey Clifton-Brown did not hold back in his response. “At the heart of any military planning is sound logistics. The UK sent an aircraft carrier with 24 F-35 fighter jets on it to the Middle East — with not enough spare parts to support them. Twelve aircraft spare parts packs were sent to service twenty-four aircraft, and it is no surprise that as a result spares had to be shipped out from RAF Marham to make up the difference.”
“In an increasingly dangerous world, our military and the country need more than this half-baked approach from the MoD. Our brave fighting men and women, before being sent into potential harm’s way, must have absolute certainty that they are well-supported in their equipment, with clear and reliable supply lines. But this correspondence shows an entirely unacceptable incompetence that flies in the face of any kind of sensible planning from the Ministry of Defence,” he added.
The Permanent Secretary’s letter also addresses broader F-35 availability challenges. Pocklington states that while incremental improvements are expected through spares investment, workforce growth, and reprioritisation, sustained achievement of availability targets is unlikely under the current global sustainment model. Mission capable rates during Operation HIGHMAST were broadly comparable to the global F-35B average, though the letter notes that post-deployment recovery from the operational tempo and corrosion remediation activity has since reduced those rates.
Corrosion, worsened by maritime exposure, is identified as a growing concern across the programme. The MoD says it is working with UK and US industry partners on deeper inspections and recovery, enhanced preventative practices, and longer-term corrosion-resistant solutions within the broader F-35 programme, while acknowledging a short-term reduction in availability as maintenance activity intensifies to clear the backlog.
On workforce, the letter states that engineering posts for the Lightning Force have been increased to 168, split 58% RAF and 42% Royal Navy, but that current fill rates stand at approximately 75%. The RAF has plans to fill its remaining engineering posts by 2032, a timeline driven by the up to three years required to make engineers fully competent on the aircraft type. RAF Marham is also described as a less preferred posting location, with efforts underway to improve its attractiveness including career path development and infrastructure investment.
On the question of a standoff capability gap before SPEAR-3 is fully integrated, the letter confirms that approval has been given to procure the Small Diameter Bomb II through a Foreign Military Sales arrangement with the United States, providing an interim precision standoff option for the F-35 until SPEAR-3 enters service.
Regarding accommodation at RAF Marham, the letter confirms that four new single living accommodation blocks are under construction, with an overall completion date of May 2027. A third F-35 squadron is planned for 2033, with infrastructure readiness targeted for April 2032, though both timelines remain subject to the finalisation of the Defence Investment Plan.
Source UKDJ
May 14, 2026
The Chair of the Public Accounts Committee has sharply criticised the Ministry of Defence over its management of F-35 spare parts, after the MoD’s Permanent Secretary wrote to the committee acknowledging that a carrier strike group deployment to the Middle East was conducted with insufficient spares to support the aircraft embarked, the UK Defence Journal understands.
The letter, dated 30 April 2026 and written by Permanent Secretary Jeremy Pocklington, was sent in response to the PAC’s October 2025 report on the UK’s F-35 stealth fighter capability. It reveals that during Operation HIGHMAST, the UK surged 24 F-35B aircraft onto a Queen Elizabeth-class carrier despite the Afloat Spares Pack being sized to support only 12 aircraft.
The shortfall was mitigated by drawing on the Deployable Spares Pack and taking additional spares from the RAF Marham Base Spares Pack, while maritime logistics challenges occasionally led to missed resupply opportunities during the deployment.
PAC Chair Sir Geoffrey Clifton-Brown did not hold back in his response. “At the heart of any military planning is sound logistics. The UK sent an aircraft carrier with 24 F-35 fighter jets on it to the Middle East — with not enough spare parts to support them. Twelve aircraft spare parts packs were sent to service twenty-four aircraft, and it is no surprise that as a result spares had to be shipped out from RAF Marham to make up the difference.”
“In an increasingly dangerous world, our military and the country need more than this half-baked approach from the MoD. Our brave fighting men and women, before being sent into potential harm’s way, must have absolute certainty that they are well-supported in their equipment, with clear and reliable supply lines. But this correspondence shows an entirely unacceptable incompetence that flies in the face of any kind of sensible planning from the Ministry of Defence,” he added.
The Permanent Secretary’s letter also addresses broader F-35 availability challenges. Pocklington states that while incremental improvements are expected through spares investment, workforce growth, and reprioritisation, sustained achievement of availability targets is unlikely under the current global sustainment model. Mission capable rates during Operation HIGHMAST were broadly comparable to the global F-35B average, though the letter notes that post-deployment recovery from the operational tempo and corrosion remediation activity has since reduced those rates.
Corrosion, worsened by maritime exposure, is identified as a growing concern across the programme. The MoD says it is working with UK and US industry partners on deeper inspections and recovery, enhanced preventative practices, and longer-term corrosion-resistant solutions within the broader F-35 programme, while acknowledging a short-term reduction in availability as maintenance activity intensifies to clear the backlog.
On workforce, the letter states that engineering posts for the Lightning Force have been increased to 168, split 58% RAF and 42% Royal Navy, but that current fill rates stand at approximately 75%. The RAF has plans to fill its remaining engineering posts by 2032, a timeline driven by the up to three years required to make engineers fully competent on the aircraft type. RAF Marham is also described as a less preferred posting location, with efforts underway to improve its attractiveness including career path development and infrastructure investment.
On the question of a standoff capability gap before SPEAR-3 is fully integrated, the letter confirms that approval has been given to procure the Small Diameter Bomb II through a Foreign Military Sales arrangement with the United States, providing an interim precision standoff option for the F-35 until SPEAR-3 enters service.
Regarding accommodation at RAF Marham, the letter confirms that four new single living accommodation blocks are under construction, with an overall completion date of May 2027. A third F-35 squadron is planned for 2033, with infrastructure readiness targeted for April 2032, though both timelines remain subject to the finalisation of the Defence Investment Plan.
Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
UK confirms F-35 standoff bomb buy
The Ministry of Defence has approved the procurement of the Small Diameter Bomb II as an interim standoff weapon for the F-35, months after the National Audit Office warned that funding for the capability had not been provided.
The NAO’s July 2025 report on the UK’s F-35 capability stated plainly that the aircraft lacked an effective standoff air-to-surface weapon, noting that “to acquire a more capable interim air-to-surface weapon the UK F-35 programme has requested funding for Small Diameter Bombs” but that “the MoD has yet to provide this funding.” The report further concluded that the UK had “not yet purchased an effective standoff air-to-surface weapon” for the fleet.
Continues https://ukdefencejournal.org.uk/uk-conf ... -bomb-buy/
The Ministry of Defence has approved the procurement of the Small Diameter Bomb II as an interim standoff weapon for the F-35, months after the National Audit Office warned that funding for the capability had not been provided.
The NAO’s July 2025 report on the UK’s F-35 capability stated plainly that the aircraft lacked an effective standoff air-to-surface weapon, noting that “to acquire a more capable interim air-to-surface weapon the UK F-35 programme has requested funding for Small Diameter Bombs” but that “the MoD has yet to provide this funding.” The report further concluded that the UK had “not yet purchased an effective standoff air-to-surface weapon” for the fleet.
Continues https://ukdefencejournal.org.uk/uk-conf ... -bomb-buy/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: F35 Airwing
UK F-35 fleet stretched by combat operations and upgrade delays
The UK has now received all 48 F-35B Lightning aircraft ordered under its initial programme, supposedly providing the Royal Navy with the nucleus of the fast jet force intended to underpin carrier strike operations for decades to come. This may appear to be a healthy number, but it is far from adequate, given its availability and the multiple roles it must perform.
Combat debut
Six F-35Bs from 617 Squadron deployed to RAF Akrotiri in February 2026, joining 10 Typhoons already stationed on Cyprus as tensions with Iran escalated. Within weeks, British aircraft were involved in Operation LUMINOUS, sustained combat operations following the US-Israeli strikes on Iran on 28 February and Tehran’s retaliatory drone and missile campaign.
On 1 March, a Shahed-type loitering munition struck a hangar at RAF Akrotiri. Damage was limited, but the attack prompted a partial evacuation of the base and marked the first hostile strike on a British military facility since 1986. Additional drones were intercepted in the following days, including two destroyed over Lebanon by Greek F-16s before they could approach Cyprus.
UK F-35s appear to have been operating well forward of Cyprus and not just patrolling over the sea but flying into airspace over Middle Eastern nations. On 3 March, the MoD confirmed RAF F-35Bs had achieved the first air-to-air kills in British service when aircraft operating over Jordanian airspace destroyed Iranian one-way attack drones using AIM-132 ASRAAM and AIM-120 AMRAAM missiles. Pilots later described the difficulty of intercepting slow, low-flying drones at night, where the risk of controlled flight into terrain during the engagement was significant.
Throughout April, there was a sustained air defence effort, sometimes involving nine-hour sorties supported by Voyager tankers. It has become the most demanding operational commitment yet undertaken by the UK Lightning Force and involves a significant proportion of the available fleet. The Akrotiri detachment was reinforced by three RN Wildcat helicopters armed with Martlet missiles and three Merlin helicopters fitted with Crowsnest airborne surveillance system.
Continues https://www.navylookout.com/uk-f-35-fle ... de-delays/
The UK has now received all 48 F-35B Lightning aircraft ordered under its initial programme, supposedly providing the Royal Navy with the nucleus of the fast jet force intended to underpin carrier strike operations for decades to come. This may appear to be a healthy number, but it is far from adequate, given its availability and the multiple roles it must perform.
Combat debut
Six F-35Bs from 617 Squadron deployed to RAF Akrotiri in February 2026, joining 10 Typhoons already stationed on Cyprus as tensions with Iran escalated. Within weeks, British aircraft were involved in Operation LUMINOUS, sustained combat operations following the US-Israeli strikes on Iran on 28 February and Tehran’s retaliatory drone and missile campaign.
On 1 March, a Shahed-type loitering munition struck a hangar at RAF Akrotiri. Damage was limited, but the attack prompted a partial evacuation of the base and marked the first hostile strike on a British military facility since 1986. Additional drones were intercepted in the following days, including two destroyed over Lebanon by Greek F-16s before they could approach Cyprus.
UK F-35s appear to have been operating well forward of Cyprus and not just patrolling over the sea but flying into airspace over Middle Eastern nations. On 3 March, the MoD confirmed RAF F-35Bs had achieved the first air-to-air kills in British service when aircraft operating over Jordanian airspace destroyed Iranian one-way attack drones using AIM-132 ASRAAM and AIM-120 AMRAAM missiles. Pilots later described the difficulty of intercepting slow, low-flying drones at night, where the risk of controlled flight into terrain during the engagement was significant.
Throughout April, there was a sustained air defence effort, sometimes involving nine-hour sorties supported by Voyager tankers. It has become the most demanding operational commitment yet undertaken by the UK Lightning Force and involves a significant proportion of the available fleet. The Akrotiri detachment was reinforced by three RN Wildcat helicopters armed with Martlet missiles and three Merlin helicopters fitted with Crowsnest airborne surveillance system.
Continues https://www.navylookout.com/uk-f-35-fle ... de-delays/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.