Next steps for Type 83 Destroyer to be announced soon

The Ministry of Defence has confirmed that further announcements regarding the Type 83 destroyer programme will follow the completion of the ongoing Strategic Defence Review.

Maria Eagle, Minister of State for Defence, responded to a parliamentary question from Graeme Downie MP, stating that “the next stage of the Type 83 Destroyer programme, which is one element of the Future Air Dominance System (FADS) programme, will be announced following the completion of the Strategic Defence Review.”

The Type 83 will replace the Royal Navy’s current Type 45 destroyers and form the backbone of the UK’s future maritime air and missile defence capability. It is part of the broader FADS programme, designed to ensure the UK maintains an advanced air defence capability into the 2040s and beyond.

Earlier updates confirmed that the programme had officially entered its concept phase, with Eagle previously stating, “The Type 83 Destroyer will be the core of the Future Air Dominance System (FADS) programme, which has commenced its concept phase. FADS will replace the UK’s present Maritime Air Defence Capability vested in the Type 45 Destroyer Programme.”

What We Know About the Type 83 Destroyer https://ukdefencejournal.org.uk/next-st ... nced-soon/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

Britain’s future laser ship?

The Royal Navy’s next destroyer isn’t just a bigger Type 45 — it’s shaping up to be a whole new kind of warship.

The term ‘destroyer’ might not fully describe what the Royal Navy is planning. While global navies stick with DDG (guided-missile destroyer), perhaps Britain is heading toward a DDL — a directed-energy destroyer — with the upcoming Type 83.

Though still in its concept phase, the programme is already being framed as something far more ambitious than a traditional air-defence ship.

According to the Ministry of Defence, the Type 83 destroyer is “one element of the Future Air Dominance System (FADS)” and will eventually replace the six existing Type 45s. But as Defence Minister Maria Eagle recently confirmed, further announcements will come only after the Strategic Defence Review concludes. That hasn’t stopped the MoD from laying out the vision.

Continues https://ukdefencejournal.org.uk/britain ... aser-ship/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

RN Destroyers: Type 83

Unread post by Pelican »

UK gives details on Type 83 and missile ship fleet plans
The Ministry of Defence has confirmed that the Royal Navy’s Future Air Dominance System (FADS), centred on the planned Type 83 destroyer, remains in its early development stages but is expected to deliver from the mid-2030s.
https://ukdefencejournal.org.uk/uk-give ... eet-plans/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

The future Air Warfare Command Ship and its drone escorts

At DSEI 2025, BAE Systems presented its vision for the Royal Navy’s future surface fleet, including the long-term pathway towards what could become the Type 83 destroyer with a distributed system-of-systems approach built around a large Air Warfare Command Ship and smaller, highly adaptable combatants.

Speaking at a media briefing, Geoff Searle said BAE is modernising its combat management system under the long-term “Re-Code” contract awarded last year. “We’re now putting significant investment into the complete modernisation of our combat management system to develop into version two. This will be the foundation of the sovereign core desired capability,” he explained.

The new architecture, he added, would enable the Royal Navy to integrate partners, equipment and uncrewed systems through “assured, secure and agile interfaces.”

Neil Griffiths expanded on the themes shaping BAE’s naval design: technology leadership, sustainable energy management, mission technology, manufacturing innovation and lean crewing. “We are striving to drive cost, reduce time schedule and improve qualities on these key programs,” he said, citing advances in welding, robotics, and lightweight structures. Lean crewing, he noted, is central to increasing mass in the battlespace while reducing risk to personnel, with automation and autonomy integrated into new platforms.

Gavin Rudgley pointed to three drivers for the future fleet: evolving high-end threats, lifecycle adaptability, and reduced crewing. AI is already being used to accelerate ship design, he said, with hundreds of hull forms now modelled in hours rather than months.

“There is a drive across many navies to reduce the complement on naval ships. That’s going to come about through automation, autonomy and the embodiment of artificial intelligence, but also through a cultural change in the way ships are operated,” he noted.

Rudgley unveiled two concept designs. The first is a large Air Warfare Command Ship hosting sensors, missile batteries, naval guns and directed-energy weapons, alongside command functions for smaller deployed platforms. Survivability is a key consideration, as the vessel would act as a high-value node within a dispersed network.

Alongside it, a smaller trimaran combatant is envisioned as a deployable sensor-effector platform. The model displayed at DSEI, based on the Triton trimaran demonstrator hullform, included systems such as Artisan radar, a 40mm Mk4 gun, vertical launch cells, towed sonar array, Herne autonomous submarine integration, and lean crewing design. Ultra-lean manning, and potentially full autonomy, are under study.

See https://ukdefencejournal.org.uk/the-fut ... e-escorts/ For full article.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

BAE Systems’ concepts for Royal Navy’s Future Air Dominance System

Following the outline FADS requirement issued by the RN earlier this year, BAE Systems has begun development of its Air Warfare Command Ship solutions and other supporting elements. At DSEI 2025, the company shared their initial design ideas, including increased automation, modularity, and efforts to ensure affordability.

The First Sea Lord has signalled a departure from traditional procurement, advocating ‘warfighting readiness’ within four years via a hybrid navy made up of crewed, uncrewed, and autonomous platforms. This vision rejects mere product swaps, like directly succeeding the Type 45 destroyers, in favour of a broader system of systems. The Type 83 destroyer will be the core command platform carrying the primary sensor, decide function and effectors but networked with multiple other dispersed assets.

BAES’ Air Warfare Command Ship (AWCS) concepts are large platforms intended as this Type 83 centrepiece but are just one element of the FADS distributed air warfare approach. The small number of high-end crewed ships will be supported by a larger group of autonomous or optionally-crewed platforms. (We will consider BAES’ proposal for these ships in detail in a forthcoming article).

Continues https://www.navylookout.com/bae-systems ... ce-system/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

Type 83 destroyer programme placed under Hybrid Navy review

The future Type 83 destroyer programme remains under review, with the Ministry of Defence confirming that progress toward a formal business case is now dependent on both the Hybrid Navy Strategy and the forthcoming Defence Investment Plan.

See https://ukdefencejournal.org.uk/type-83 ... vy-review/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

New British destroyer ‘underdeveloped concept’

June 24, 2026

Only around GBP 1 million has been spent on platform-specific design work for the Royal Navy’s planned Type 83 destroyer over the past three financial years, with the Ministry of Defence admitting it inherited the programme as an underdeveloped concept on entering office, the department stated in a written answer to a parliamentary question.
Conservative MP Sir Alec Shelbrooke had asked the Secretary of State for Defence to set out the total spend to date on the Type 83 project, including pre-concept and early concept phases. Minister for Defence Readiness and Industry Luke Pollard’s response indicated that the figures are difficult to disaggregate because Type 83 sits within a wider capability framework.

Pollard said: “We inherited an underdeveloped concept for Type 83 when we took office. The Type 83 Destroyer forms part of a wider Future Air Dominance System (FADS) capability concept, making specific costs for the Type 83 element hard to differentiate from the wider whole.” He continued: “Over the last three financial years, c.£1 million has been spent on platform-specific design for the Type 83. This forms part of c.£6.9 million which is the broader notional spend for Type 83 work as a part of FADS.”

The figures show a programme still very much in its earliest stages, despite the Type 83 having been publicly identified as the future replacement for the Royal Navy’s Type 45 air defence destroyer fleet for several years. The Type 45s entered service from 2009 onward and currently provide the area air defence capability for the carrier strike group, with the class subject to its own significant modernisation programme through the Sea Viper Evolution and Power Improvement Project upgrades. The original timeline indicated Type 83 would begin replacing the six-ship Type 45 force in the late 2030s.

The Future Air Dominance System framework under which Type 83 is being developed is intended to capture not just the next-generation surface combatant but the broader mix of sensors, weapons and command and control capabilities required to deliver fleet air defence in the 2040s and beyond.

The strategic defence review published in June 2025 retained the requirement for a successor to Type 45 within the Royal Navy’s force structure but did not provide a detailed timeline for the Type 83. Royal Navy and industry sources have for some time expressed concern publicly about the pace at which Type 83 has been progressing through its early concept stages, with the relative scale of investment to date offering a measure of how much remains to be done before the programme can move into demonstration.

Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: RN Destroyers: Type 83

Unread post by jbryce1437 »

The Royal Navy's planned Type 83 destroyer has been dropped in favour of six new Common Combat Vessels built to coordinate drones, under the government's long -delayed Defence Investment Plan, the Sunday Times was first to report.

Continues here
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
jbryce1437
Posts: 2095
Joined: Sun Aug 05, 2018 7:28 pm
Location: Roker, Sunderland

Re: RN Destroyers: Type 83

Unread post by jbryce1437 »

UK outlines thinking behind binning plans for new destroyers
The Ministry of Defence has set out its thinking behind cancelling the Type 83 destroyer, saying the classified analysis that shaped the decision drew on lessons from ongoing conflicts and concluded that a mix of crewed and uncrewed vessels will deliver greater missile capacity and mass, where an expensive, exquisite platform would have left the Royal Navy with too few ships to cover its tasks.

Continues
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Destroyers: Type 83

Unread post by Pelican »

UK MoD axes Type 83 in favour of new ‘hybrid’ warship fleet

The new Common Combat Vessels will succeed the six Type 45 destroyers, with deliveries set to begin in the early 2030s.

The UK Government has cancelled plans for the Type 83 destroyer, opting instead for a new class of ‘hybrid’ drone carrier warships as part of its latest Defence Investment Plan (DIP).

In a 29 June release, the Ministry of Defence (MoD) said at least six Common Combat Vessels (CCVs) will be developed to take the place of the existing Type 45 destroyers, with initial deliveries expected from the early 2030s.

Unlike previous generations, the CCVs will be constructed specifically to serve as a “control hub” for uncrewed systems, extending operational reach and firepower without increasing crew size or costs.

This change, outlined ahead of the Nato Summit, moves away from reliance on a small number of large and expensive platforms.

Instead, the Royal Navy will adopt a hybrid approach, combining traditional warships with a range of uncrewed missile and sensing platforms.

The funding released in the DIP will enable the National Armaments Director Group to start design work for this new fleet, supporting what is described as a fundamental change in naval air defence at sea.

According to the MoD, the CCVs will join the Royal Navy alongside eight Type 26 and five Type 31 frigates, as well as uncrewed vessels, including the Type 91 missile platform, Type 92 underwater sensor system, Type 93 extra-large uncrewed underwater vehicle, and the Type 94 sensor platform.

Collectively, these programmes represent a “once in a generation” investment in new maritime capability.

Continues https://www.naval-technology.com/news/u ... p/?cf-view



Also:
Type 83 Cancelled: What the £15Bn Defence Plan Means for the Royal Navy
The UK government has published its Defence Investment Plan — and the Royal Navy's Type 83 destroyer programme has been cancelled.
In its place: the Common Combat Vessel, a smaller, cheaper warship built to control networks of uncrewed drones across air, surface, and underwater domains, backed by new Type 91–94 uncrewed platforms.
In this video, we break down every Royal Navy announcement from today's Defence Investment Plan — the nuclear deterrent, Project Royal Oak's £26 billion naval base upgrade, the Type 83 cancellation, the new Common Combat Vessel, frigate orders, drones, equipment, and what wasn't mentioned. We also look at what MPs in Parliament had to say about whether £15 billion in new funding is actually enough.
See https://www.youtube.com/watch?v=HyMC9IjZmPo