I'm no expert Ivor but perhaps the clues are:ivorthediver wrote: ↑Mon Jan 06, 2025 7:20 pm thanks David , but why have we not had these sooner ? , seems an obvious accessory and easier to keep secure![]()
![]()
"The April 2032 date is a strong clue to the expected Dreadnought-class in-service date."
And
"Although designed for the Vanguard-class the shiplift is rated up to 25,000 tons and will theoretically be able to accommodate the heavier Dreadnought-class (including if loaded with a full outfit of Trident missiles). However, as a mechanical system that utilises almost 100 winches to raise the submarine on a platform out of the water, it requires regular maintenance and does have marginally more safety issues than a graving or floating dock."
= Not needed yet, safety & size ~ also by and large leaving construction as late as possible allows the most up to date materials, design/construction techniques to be used.