Investigation into equipment cannibalisation in the Royal Navy
Equipment cannibalisation in the Royal Navy has doubled in the past 12 years. It can be effective to meet operational needs but can increase costs and create disruption.
The National Audit Office has today published the findings from its investigation into equipment cannibalisation in the Royal Navy.
The Royal Navy operates ships, submarines and helicopters, which comprise complex systems made up of thousands of parts, to meet the United Kingdom’s defence requirements. The Navy needs additional parts to maintain and repair its equipment. When vessels require parts that are unavailable and no other solution is available, the Ministry of Defence (the Ministry) can authorise that they are taken from other equipment – a process known as equipment cannibalisation.
The key findings of the investigation are:
Equipment cannibalisation can be necessary but should only happen when no other solution is available. The Ministry guidance states “cannibalisation will only be conducted where no other solution is available.” Decision-makers consider operational priorities and the estimated time to obtain new parts. In the last five years, between 0.3% and 1.4% of parts provided to the main classes of ships and submarines have been cannibalised parts. However, each instance has a wider impact beyond the part being replaced and can signify broader issues with the process for getting spare parts.
Across ships and submarines, equipment cannibalisation has increased 49% in the last five years, with a total of 3,230 instances involving 6,378 parts. During 2016-17, there were 795 instances of equipment cannibalisation. This equates to 66 instances a month, compared to 30 a month in 2005. Since 2004, the Navy has reduced its fleet of ships and submarines by 31% from 127 to 87, meaning that a higher proportion needs to be deployed, or ready to deploy, at any one time in order to meet defence requirements. In 2016-17, ship and submarine equipment cannibalisation accounted for 60% of instances across the Navy. Navy Merlin helicopters make up the remaining 40%.
Some 40% of ships and submarines receiving cannibalised parts needed them so they could be ready for operations or training. In these cases, equipment cannibalisation rectified issues that would have reduced the operational capability of ships and submarines. The remaining 60% of ships and submarines did not need the parts for operations or training. For example, in some cases the parts were required to complete planned maintenance work to a specified schedule so as to avoid potential delays and additional costs.
Our analysis shows 71% of parts cannibalised on the basis of operational need were low value, but the cost of moving the parts could be much greater. The majority of cannibalised parts cost less than £5,000, with less than 1% valued at over £500,000. The Ministry does not know how often the cost of replacing cannibalised parts exceeds the value of the part being replaced. The Ministry’s analysis, covering 146 Type 23 equipment cannibalisations in 2012, showed that in 50% of these cases, the cost of equipment cannibalisation was equal to, or greater than, the value of the part. In 25% of cases it was four times greater. Even though equipment cannibalisation has increased, the Ministry has not updated or broadened its analysis.
The need for equipment cannibalisation is exacerbated by both a lack of information about when parts will be delivered, and delays in receiving parts on time. In March 2017, the DE&S Ships Operating Centre met 55% of part demands from ship and submarine crews by the required date (target 75%). The Submarine Operating Centre met 63% of demands (target 80%). At the same time, of 17,038 ship part demands already past their required delivery date, 34% had no recorded forecast delivery date. Identifying a forecast delivery date can be more difficult where the Ministry has contracted-out support arrangements. The Ministry has undertaken a number of initiatives to improve ship and submarine supply chain management.
The Ministry does not routinely monitor the use, causes and impact of equipment cannibalisation across the Navy. The Ministry considers and assesses equipment cannibalisation and trends over time for individual vessel types. There is no overall accountability for managing equipment cannibalisation across the Navy or routine data collection or analysis assessing why equipment cannibalisation occurs or its impact. This information gap makes it difficult to determine when equipment cannibalisation is becoming more routine, its underlying causes, and the trade-offs between cost savings and equipment cannibalisation.
The Ministry has taken decisions to reduce support without complete information to fully assess and manage the impacts and costs. To remain within its budget, the Navy reduced its maritime support budget by 6% (£271 million) in-year in the last two years. Of these reductions, an estimated £92 million could increase the need to cannibalise parts. In particular, the Ministry decided not to invest in complete technical documentation or in fully cataloguing parts when vessels were brought into service.
Each instance of equipment cannibalisation can delay programmes, create additional engineering risks and add to the work of staff, affecting morale. Equipment cannibalisation has a number of impacts the Ministry needs to manage including:
- Programme delays: In the last five years, the number of equipment cannibalisations from the Astute-class submarine production line increased 43%, from 77 instances in 2012-13 to 110 in 2016-17. Cannibalisation caused a 42-day delay and the Ministry having to pay an additional £4.9 million for the third Astute submarine and has also affected other boats.
- Engineering risk: Cannibalised parts, along with additional parts that must be removed to gain access to them, may be damaged whilst being removed, transported or re-installed. An estimated 11% of the parts recorded by ships as having shortcomings in their material, design or documentation were cannibalised.
- People: The 2017 Navy risk register identified a lack of spare parts as a risk to operational capability given its demoralising effect on personnel.
1 November 2017
Source National Audit Office- for the following Downloads:- a) Full Report (pdf - 345KB); b) Summary (pdf - 84KB); c) Press Release - open the link provided
National Audit Office; Equipment Cannibalisation in the Royal Navy
- Little h
- Posts: 1746
- Joined: Sun Aug 12, 2018 6:53 pm
- ivorthediver
- Posts: 3729
- Joined: Fri Aug 10, 2018 8:42 pm
- Location: Cambridge Shore Battery
Re: National Audit Office; Equipment Cannibalisation in the Royal Navy
Good Grief Harry , thats staggering
Thank you for your thorough post on this item which is truly shocking , bad enough that we get ourselves into this mess in the first place without accelerating the problem .
Your research identifies several knock on effects of this practice which the governments decision to reduce outlay on spares has turned around and bitten them on the Arse , so ironic that their own audit shows such a waste of money , time, and resources rather than save money for which they were looking for .......like this wasn't predictable by their actions
Thank you for your thorough post on this item which is truly shocking , bad enough that we get ourselves into this mess in the first place without accelerating the problem .
Your research identifies several knock on effects of this practice which the governments decision to reduce outlay on spares has turned around and bitten them on the Arse , so ironic that their own audit shows such a waste of money , time, and resources rather than save money for which they were looking for .......like this wasn't predictable by their actions
"What Ever Floats your Boat"
- jbryce1437
- Posts: 2095
- Joined: Sun Aug 05, 2018 7:28 pm
- Location: Roker, Sunderland
Re: National Audit Office; Equipment Cannibalisation in the Royal Navy
I presume the Naval Stores and Spare Gear network is a shadow of its former self. When ships and equipment get long in the tooth, obtaining spare parts must be a problem as the item may no longer be made, or a newer version in production, requiring a whole unit to be replaced, rather than a component. Not sure what the answer to the problem is, short of ordering a surplus of every component part - "just in case".
Jim
Jim
HMS Raleigh 1963 , HMS Collingwood 1963 & 67 , HMS Ark Royal 1964-7, HMS Undaunted 1968-71, HMS Victory (Fleet Maintenance Group) 1971-72, HMS Exmouth 1972-74
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
JEM, EM, OEM, LOEM, POOEL
Then 28 years in the Fire Brigade
Retired since 2002
- Little h
- Posts: 1746
- Joined: Sun Aug 12, 2018 6:53 pm
Re: National Audit Office; Equipment Cannibalisation in the Royal Navy
Please note that the excerpts below relate to a meeting at which frequent reference is made to the NAO report including the cannibalisation of equipment in the Royal Navy.
The following passages relating to Cannibalisation in the Royal Navy are taken from a 23 page document in PDF titled:-
House of Commons
Committee of Public Accounts
__________________________
Ministry of Defence:
Acquisition and support of defence equipment
________________________________________
Twenty-Eighth Report of Session 2017–19
Report, together with formal minutes relating
to the report
Ordered by the House of Commons
to be printed 14 March 2018
HC 724
Published on 23 March 2018
by authority of the House of Commons
Support arrangements and cannibalisation of navy equipment
The Royal Navy operates ships, submarines and helicopters to meet the United Kingdom’s
defence requirements. They are complex systems with many parts, requiring the Navy to
have spares to be used either during scheduled maintenance or if the original parts break
unexpectedly. DE&S puts in place support arrangements for equipment, but when parts
are unavailable, the Department can authorise that parts are taken from other vessels, a
longstanding process known as ‘cannibalisation’.
6.
The Department’s arrangements to support in-service Type 45 destroyers and
Astute-class submarines have not been adequate.
The Department admits that
there have been issues with the support of both these vessel types since they were
brought into service. To address the recognised shortcomings, the Department
said it had recently spent £8 million on Astute-class parts and, in 2016–17, further
invested in the Type 45 support arrangements. The lack of operational experience
and performance data for these new vessels has made it harder to predict their
support requirements. Ineffective support contributed to increased ‘cannibalisation’,
where parts are taken from one vessel to keep another one in service. Over the
last five years, there has been a 217% increase in cannibalisation of Type 45s and
a 107% increase for the Astute-class submarines. Each instance can increase costs,
divert resources and create additional risks, particularly if parts are taken from the
production line. Despite the need to make future efficiencies across defence, the
Department tells us that the Navy will be adequately resourced to provide its future
objectives.
Recommendation:
The Department must make sure it adequately funds the
provision of spares for its future new ships–the aircraft carriers and the Type 26
and Type 31 frigates—in order not to repeat the same mistakes made with the
Type 45 destroyers and Astute class submarines. It should provide an assessment
of what it sees as an acceptable cost envelope for spares that balances competing
risks, including the costs of oversupply, risks to effective deployment, and delays
in receipt of spare parts.
7.
The Navy and DE&S have not always ensured that spare parts are available when
required for ship and submarine maintenance.
The Department acknowledged it
could improve its planning of maintenance by considering its requirements further
in advance and ordering parts from contractors earlier. In September 2017, only 67%
of parts ordered by the Ships team in DE&S, and 58% by the Submarine team, were
delivered on time (against targets of 95%). The maritime supply chain improvement
programme aims to improve planning, alongside addressing the 21% shortfall in
staff who are qualified in commercial and inventory management. Inadequate
maintenance planning increases cannibalisation risks; in the last five years 60%
of ships and submarines requiring cannibalised parts were in maintenance, an
increase from 27% to 89% over the period.
Recommendation:
The Navy and DE&S should work with contractors to better
plan for scheduled maintenance and ensure that parts are available when required
so that the now smaller Royal Navy can fulfil its operational commitments.
8.
The Navy has become more reliant on equipment cannibalisation, with some
pieces of equipment being repeatedly cannibalised.
The Department has
previously agreed with this Committee’s findings that, although cannibalisation
may be necessary in some circumstances, it should not be used routinely. However,
over the last five years ship and submarine cannibalisation has increased 49%
across the Navy. It has become routine for some pieces of equipment, with 26%
of all cannibalisations involving the same specific type of equipment on three or
more occasions. During 2016–17, the Department also relied on cannibalised parts
to resolve 28% of Astute-class defects. The Permanent Secretary told us he is not
uncomfortable with the overall level of cannibalisation across the Navy, although
he is concerned that it is happening with great frequency with certain items. He has
asked the Department to address this as a matter of urgency.
Recommendation:
The Department must deliver on its undertaking that
cannibalisation should not be routine, particularly in relation to repeatedly
cyclical cannibalisation of parts. To this end, the Department should, by the end
of September, write to the Committee identifying revised targets for acceptable,
safe levels of cannibalisation, and what additional actions could be undertaken
to reduce it.
9.
The Department expects vessel cannibalisation to decline but cannot say
to what extent, or by when, and has no upper limit on what level it would
tolerate.
The Department expects the cannibalisation of Type 45 Destroyers and
Astute-class submarines to fall. It does not have a threshold for an acceptable
level of cannibalisation, although it does have an equivalent threshold for Merlin
helicopters. It does not have the data, controls and processes to routinely monitor
cannibalisation and its costs across the Navy. The Department acknowledges that
the National Audit Office report has provided it with valuable new insights, and
says that applying new data analysis techniques should improve its ability to predict
and manage the demand for spare parts. The Department acknowledges that
cannibalisation also takes place across the Army and Royal Air Force, but cannot
quantify to what extent.
Recommendation:
The Department needs to ensure it has adequate data to
better understand and respond to cannibalisation trends so as to implement our
recommendations across both the Navy and the other Front Line Commands.
Ministry of Defence: Acquisition and support of defence equipment
------------------------------------------------
2
Support arrangements and
cannibalisation of naval equipment
12.
On the basis of a report and memorandum from the Comptroller and Auditor
General, we also took evidence from the Ministry of Defence (the Department) and the
Royal Navy on support arrangements and cannibalisation of naval equipment.
13.
In 2016–17, the Royal Navy spent £9 billion on the equipment, people and support
needed to meet its commitments. This includes procuring new vessels such as the HMS
Queen Elizabeth aircraft carrier, and the Astute-class nuclear submarines. To keep its
fleet operational, the Navy also spent £1.8 billion supporting its ships and boats, including
on spare parts, fuel, and maintenance.
Since 2000, the Navy’s fleet size has reduced by
almost a third from 123 to 84 vessels, including a reduction in the number of destroyers
and frigates from 32 to 19.
This reduction has affected the Navy’s flexibility, with it having
to quickly fix problems to keep vessels operational, rather than being able to replace a
defective ship with another one while it is being fixed. In 2017, the Government announced
its commitment to halt the decline in ship and submarine numbers, and increase the size
of the Royal Navy Fleet by the 2030s.
14 .
The Navy’s ships and submarines are highly complex engineering systems. For each
type of vessel, the Department needs to identify and put in place appropriate maintenance
and support for vessels to remain operational. This involves predicting the required type
and quantities of spare parts, as well as the frequency and scope of maintenance periods.
Where the Department does not have the spare part required for either maintenance or
where an unexpected defect has arisen, it may choose to take the required part from other
ships and submarines. Each instance—termed ‘cannibalisation’ or ‘store robbing’—can
increase costs and technical risks and divert resources.
Over the last five years, there
have been 3,230 instances of ship and submarine cannibalisation involving 6,378 parts.
Support arrangements for Type 45 Destroyers and Astute-class
submarines
15.
The Department acknowledged that when the Type 45 Destroyer and Astute-class
submarines were brought into service, the support arrangements had not been as good
as expected.
For example, the National Audit Office (NAO) found the increased Astute-
class equipment cannibalisation (107% increase in the last five years) resulted, in part,
from a critical shortage of spares given ‘poor inventory management and an incorrectly
defined, managed and resourced’ support approach. The NAO also reported that the Navy
had decided to make savings by not cataloguing or labelling some parts of the Type 45
Destroyers. This had then made it harder to identify the parts needed or where they might
be available.
16.
It can be more difficult to predict support requirements for new ships and submarines
given the uncertainty of how this equipment will perform and the limited information
available on which to make decisions. In 2016–17, in an effort to improve support, the
Navy invested an additional £8 million on Astute submarine spare parts and spent £1.5
million improving technical documentation for the Type 45s.
The Department told us
it had learnt lessons about introducing new equipment, which it had put into practice
with the new Queen Elizabeth aircraft carrier, where it expects to have 95% of the spares
available.
Availability of spare parts
17.
Alongside improving the support for new equipment being brought into service, the
Department also recognised the need to improve its planning of scheduled maintenance
to ensure spare parts always available when required.
The NAO reported that in the
last five years, 60% of the recipient ships and submarines that needed parts were in
maintenance or low readiness.
In September 2017, only 67% of parts ordered by the
Ships team in Defence Equipment and Support (DE&S), and 58% by the Submarine team,
were delivered on time (against targets of 95%). In 2014, the Department introduced a
programme designed to improve the availability of spare parts for ships and submarines.
This involved building inventory management skills, better planning of maintenance,
and ensuring the supply chain delivered parts on time.
The Department told us it now
required all teams to look two years ahead to examine each planned maintenance period
and the associated spare part requirements.
18.
We questioned the Department on its ability to ensure adequate funds would
be available to support its in-service ships and submarines given the well-recognised
budgetary challenges it faced. The Department acknowledged these financial challenges,
but explained that, as the Navy had received funding reprioritised from across the
Department, it felt the service had sufficient resources to deliver its commitments.
However, we note that despite this, in 2016–17, the Navy reduced its maritime support
budget by 6% (£271 million), and the Department expected the Navy to make savings of
£1.6 billion from its support budget over the next 10 years.
The Department told us that
it expected to be able to make the necessary savings without a disproportionate impact on
vessels’ ability to operate.
Reliance on cannibalisation
19.
Previous Committees have recognised equipment cannibalisation can be acceptable
and necessary in some cases. However, they have also warned that the Department needs
to ensure cannibalisation is the most effective solution and that there is a clear thresholdfor when it becomes unacceptable.
This is line with the Department’s own guidance
that cannibalisation will only be “used if no other solution is available due to the risk of
damage to equipment components”.
The Department reiterated that there was no policy
to increase the use of cannibalisation, which would only be conducted to ensure high-
priority ships and submarines remained operational.
20.
Despite this, the NAO reported that cannibalisation has become a routine part of
equipment support, with a 49% increase in the instances of cannibalisation between April
2012 and March 2017. In 2016–17, there were 795 instances of cannibalisation, equating to
66 instances per month, compared to 30 instances per month in 2005, at a time when the
Navy was larger. In particular, the Department had relied on cannibalised parts to resolve
28% of Astute-class submarine defects during 2016–17. This contributed to 110 parts being
taken from the Astute-class production line in 2016–17, a 43% increase from 2012–13.
The NAO also reported that cannibalisations have resulted in a 42-day delay to, and £4.9
million cost impact to, Boat 3, and a further estimated £40 million cost increase for those
submarines in production.
The Department acknowledged that in some areas the use of
cannibalisation had become systemic rather than one-off, and it would need to take some
action. This was particularly the case with the Type 45 Destroyers and the Astute-class
submarines, where it was ‘more problematic’.
21.
The Permanent Secretary told us he was “not uncomfortable” with the routine levels
of cannibalisation being conducted at present. The witnesses expressed concern that some
parts were being repeatedly cannibalised, and the Permanent Secretary told us this was an
area on which the Department would now focus as a matter of urgency.
The NAO found
that 26% of the instances of cannibalisation, where data were available, involved parts
which had been cannibalised on three or more occasions. Parts most often cannibalised
included non-safety critical valves (costing an average of £2,541 each) and control and
surveillance machinery (average cost £8,115).
The Department stated that of the repeated
parts identified by the NAO, 64% were now either on the shelf or had been ordered.
Plans to reduce cannibalisation
22.
The Department does not routinely monitor the use, causes and impact of
cannibalisation across the Navy. The NAO found that without information, and a strategic
oversight of cannibalisation, the Department had not determined a threshold beyond
which cannibalisation was unacceptable. The Navy does, however, use a metric to assess
cannibalisation across the Merlin helicopter fleet: the average number of cannibalisations
per 100 flying hours.
When we challenged the Department, it could not say what an
appropriate level of cannibalisation for ships and submarines would be. It also told us that
it expected cannibalisation rates to fall as the Navy gained experience operating the ships
and submarines more recently brought into service, but could not say by how much or by
when.
23.
The NAO also found that the Department did not routinely assess the costs, either
engineering or administrative, of cannibalisation. The Department told us that it is
refreshing its cannibalisation policy so teams must assess and provide the wider cost
implications of cannibalisations and refer cannibalisation decisions to a more senior
officer if they may have significant wider cost implications.
24.
The Department acknowledged that cannibalisation occurred across all the Armed
Forces.
It described cannibalisation as a recognised practice for both the Army and
the Royal Air Force when all other supply options had been exhausted. However, the
Department was unable to provide the Committee with authoritative information for the
other Commands to the same level of detail as the NAO report on the Navy. It committed
to looking at the data available to make sure the lessons learnt from the report on the
Navy were applied to the same level of rigour across the other Commands.
-------------------------------------------------
Full PDF can be read here
The following passages relating to Cannibalisation in the Royal Navy are taken from a 23 page document in PDF titled:-
House of Commons
Committee of Public Accounts
__________________________
Ministry of Defence:
Acquisition and support of defence equipment
________________________________________
Twenty-Eighth Report of Session 2017–19
Report, together with formal minutes relating
to the report
Ordered by the House of Commons
to be printed 14 March 2018
HC 724
Published on 23 March 2018
by authority of the House of Commons
Support arrangements and cannibalisation of navy equipment
The Royal Navy operates ships, submarines and helicopters to meet the United Kingdom’s
defence requirements. They are complex systems with many parts, requiring the Navy to
have spares to be used either during scheduled maintenance or if the original parts break
unexpectedly. DE&S puts in place support arrangements for equipment, but when parts
are unavailable, the Department can authorise that parts are taken from other vessels, a
longstanding process known as ‘cannibalisation’.
6.
The Department’s arrangements to support in-service Type 45 destroyers and
Astute-class submarines have not been adequate.
The Department admits that
there have been issues with the support of both these vessel types since they were
brought into service. To address the recognised shortcomings, the Department
said it had recently spent £8 million on Astute-class parts and, in 2016–17, further
invested in the Type 45 support arrangements. The lack of operational experience
and performance data for these new vessels has made it harder to predict their
support requirements. Ineffective support contributed to increased ‘cannibalisation’,
where parts are taken from one vessel to keep another one in service. Over the
last five years, there has been a 217% increase in cannibalisation of Type 45s and
a 107% increase for the Astute-class submarines. Each instance can increase costs,
divert resources and create additional risks, particularly if parts are taken from the
production line. Despite the need to make future efficiencies across defence, the
Department tells us that the Navy will be adequately resourced to provide its future
objectives.
Recommendation:
The Department must make sure it adequately funds the
provision of spares for its future new ships–the aircraft carriers and the Type 26
and Type 31 frigates—in order not to repeat the same mistakes made with the
Type 45 destroyers and Astute class submarines. It should provide an assessment
of what it sees as an acceptable cost envelope for spares that balances competing
risks, including the costs of oversupply, risks to effective deployment, and delays
in receipt of spare parts.
7.
The Navy and DE&S have not always ensured that spare parts are available when
required for ship and submarine maintenance.
The Department acknowledged it
could improve its planning of maintenance by considering its requirements further
in advance and ordering parts from contractors earlier. In September 2017, only 67%
of parts ordered by the Ships team in DE&S, and 58% by the Submarine team, were
delivered on time (against targets of 95%). The maritime supply chain improvement
programme aims to improve planning, alongside addressing the 21% shortfall in
staff who are qualified in commercial and inventory management. Inadequate
maintenance planning increases cannibalisation risks; in the last five years 60%
of ships and submarines requiring cannibalised parts were in maintenance, an
increase from 27% to 89% over the period.
Recommendation:
The Navy and DE&S should work with contractors to better
plan for scheduled maintenance and ensure that parts are available when required
so that the now smaller Royal Navy can fulfil its operational commitments.
8.
The Navy has become more reliant on equipment cannibalisation, with some
pieces of equipment being repeatedly cannibalised.
The Department has
previously agreed with this Committee’s findings that, although cannibalisation
may be necessary in some circumstances, it should not be used routinely. However,
over the last five years ship and submarine cannibalisation has increased 49%
across the Navy. It has become routine for some pieces of equipment, with 26%
of all cannibalisations involving the same specific type of equipment on three or
more occasions. During 2016–17, the Department also relied on cannibalised parts
to resolve 28% of Astute-class defects. The Permanent Secretary told us he is not
uncomfortable with the overall level of cannibalisation across the Navy, although
he is concerned that it is happening with great frequency with certain items. He has
asked the Department to address this as a matter of urgency.
Recommendation:
The Department must deliver on its undertaking that
cannibalisation should not be routine, particularly in relation to repeatedly
cyclical cannibalisation of parts. To this end, the Department should, by the end
of September, write to the Committee identifying revised targets for acceptable,
safe levels of cannibalisation, and what additional actions could be undertaken
to reduce it.
9.
The Department expects vessel cannibalisation to decline but cannot say
to what extent, or by when, and has no upper limit on what level it would
tolerate.
The Department expects the cannibalisation of Type 45 Destroyers and
Astute-class submarines to fall. It does not have a threshold for an acceptable
level of cannibalisation, although it does have an equivalent threshold for Merlin
helicopters. It does not have the data, controls and processes to routinely monitor
cannibalisation and its costs across the Navy. The Department acknowledges that
the National Audit Office report has provided it with valuable new insights, and
says that applying new data analysis techniques should improve its ability to predict
and manage the demand for spare parts. The Department acknowledges that
cannibalisation also takes place across the Army and Royal Air Force, but cannot
quantify to what extent.
Recommendation:
The Department needs to ensure it has adequate data to
better understand and respond to cannibalisation trends so as to implement our
recommendations across both the Navy and the other Front Line Commands.
Ministry of Defence: Acquisition and support of defence equipment
------------------------------------------------
2
Support arrangements and
cannibalisation of naval equipment
12.
On the basis of a report and memorandum from the Comptroller and Auditor
General, we also took evidence from the Ministry of Defence (the Department) and the
Royal Navy on support arrangements and cannibalisation of naval equipment.
13.
In 2016–17, the Royal Navy spent £9 billion on the equipment, people and support
needed to meet its commitments. This includes procuring new vessels such as the HMS
Queen Elizabeth aircraft carrier, and the Astute-class nuclear submarines. To keep its
fleet operational, the Navy also spent £1.8 billion supporting its ships and boats, including
on spare parts, fuel, and maintenance.
Since 2000, the Navy’s fleet size has reduced by
almost a third from 123 to 84 vessels, including a reduction in the number of destroyers
and frigates from 32 to 19.
This reduction has affected the Navy’s flexibility, with it having
to quickly fix problems to keep vessels operational, rather than being able to replace a
defective ship with another one while it is being fixed. In 2017, the Government announced
its commitment to halt the decline in ship and submarine numbers, and increase the size
of the Royal Navy Fleet by the 2030s.
14 .
The Navy’s ships and submarines are highly complex engineering systems. For each
type of vessel, the Department needs to identify and put in place appropriate maintenance
and support for vessels to remain operational. This involves predicting the required type
and quantities of spare parts, as well as the frequency and scope of maintenance periods.
Where the Department does not have the spare part required for either maintenance or
where an unexpected defect has arisen, it may choose to take the required part from other
ships and submarines. Each instance—termed ‘cannibalisation’ or ‘store robbing’—can
increase costs and technical risks and divert resources.
Over the last five years, there
have been 3,230 instances of ship and submarine cannibalisation involving 6,378 parts.
Support arrangements for Type 45 Destroyers and Astute-class
submarines
15.
The Department acknowledged that when the Type 45 Destroyer and Astute-class
submarines were brought into service, the support arrangements had not been as good
as expected.
For example, the National Audit Office (NAO) found the increased Astute-
class equipment cannibalisation (107% increase in the last five years) resulted, in part,
from a critical shortage of spares given ‘poor inventory management and an incorrectly
defined, managed and resourced’ support approach. The NAO also reported that the Navy
had decided to make savings by not cataloguing or labelling some parts of the Type 45
Destroyers. This had then made it harder to identify the parts needed or where they might
be available.
16.
It can be more difficult to predict support requirements for new ships and submarines
given the uncertainty of how this equipment will perform and the limited information
available on which to make decisions. In 2016–17, in an effort to improve support, the
Navy invested an additional £8 million on Astute submarine spare parts and spent £1.5
million improving technical documentation for the Type 45s.
The Department told us
it had learnt lessons about introducing new equipment, which it had put into practice
with the new Queen Elizabeth aircraft carrier, where it expects to have 95% of the spares
available.
Availability of spare parts
17.
Alongside improving the support for new equipment being brought into service, the
Department also recognised the need to improve its planning of scheduled maintenance
to ensure spare parts always available when required.
The NAO reported that in the
last five years, 60% of the recipient ships and submarines that needed parts were in
maintenance or low readiness.
In September 2017, only 67% of parts ordered by the
Ships team in Defence Equipment and Support (DE&S), and 58% by the Submarine team,
were delivered on time (against targets of 95%). In 2014, the Department introduced a
programme designed to improve the availability of spare parts for ships and submarines.
This involved building inventory management skills, better planning of maintenance,
and ensuring the supply chain delivered parts on time.
The Department told us it now
required all teams to look two years ahead to examine each planned maintenance period
and the associated spare part requirements.
18.
We questioned the Department on its ability to ensure adequate funds would
be available to support its in-service ships and submarines given the well-recognised
budgetary challenges it faced. The Department acknowledged these financial challenges,
but explained that, as the Navy had received funding reprioritised from across the
Department, it felt the service had sufficient resources to deliver its commitments.
However, we note that despite this, in 2016–17, the Navy reduced its maritime support
budget by 6% (£271 million), and the Department expected the Navy to make savings of
£1.6 billion from its support budget over the next 10 years.
The Department told us that
it expected to be able to make the necessary savings without a disproportionate impact on
vessels’ ability to operate.
Reliance on cannibalisation
19.
Previous Committees have recognised equipment cannibalisation can be acceptable
and necessary in some cases. However, they have also warned that the Department needs
to ensure cannibalisation is the most effective solution and that there is a clear thresholdfor when it becomes unacceptable.
This is line with the Department’s own guidance
that cannibalisation will only be “used if no other solution is available due to the risk of
damage to equipment components”.
The Department reiterated that there was no policy
to increase the use of cannibalisation, which would only be conducted to ensure high-
priority ships and submarines remained operational.
20.
Despite this, the NAO reported that cannibalisation has become a routine part of
equipment support, with a 49% increase in the instances of cannibalisation between April
2012 and March 2017. In 2016–17, there were 795 instances of cannibalisation, equating to
66 instances per month, compared to 30 instances per month in 2005, at a time when the
Navy was larger. In particular, the Department had relied on cannibalised parts to resolve
28% of Astute-class submarine defects during 2016–17. This contributed to 110 parts being
taken from the Astute-class production line in 2016–17, a 43% increase from 2012–13.
The NAO also reported that cannibalisations have resulted in a 42-day delay to, and £4.9
million cost impact to, Boat 3, and a further estimated £40 million cost increase for those
submarines in production.
The Department acknowledged that in some areas the use of
cannibalisation had become systemic rather than one-off, and it would need to take some
action. This was particularly the case with the Type 45 Destroyers and the Astute-class
submarines, where it was ‘more problematic’.
21.
The Permanent Secretary told us he was “not uncomfortable” with the routine levels
of cannibalisation being conducted at present. The witnesses expressed concern that some
parts were being repeatedly cannibalised, and the Permanent Secretary told us this was an
area on which the Department would now focus as a matter of urgency.
The NAO found
that 26% of the instances of cannibalisation, where data were available, involved parts
which had been cannibalised on three or more occasions. Parts most often cannibalised
included non-safety critical valves (costing an average of £2,541 each) and control and
surveillance machinery (average cost £8,115).
The Department stated that of the repeated
parts identified by the NAO, 64% were now either on the shelf or had been ordered.
Plans to reduce cannibalisation
22.
The Department does not routinely monitor the use, causes and impact of
cannibalisation across the Navy. The NAO found that without information, and a strategic
oversight of cannibalisation, the Department had not determined a threshold beyond
which cannibalisation was unacceptable. The Navy does, however, use a metric to assess
cannibalisation across the Merlin helicopter fleet: the average number of cannibalisations
per 100 flying hours.
When we challenged the Department, it could not say what an
appropriate level of cannibalisation for ships and submarines would be. It also told us that
it expected cannibalisation rates to fall as the Navy gained experience operating the ships
and submarines more recently brought into service, but could not say by how much or by
when.
23.
The NAO also found that the Department did not routinely assess the costs, either
engineering or administrative, of cannibalisation. The Department told us that it is
refreshing its cannibalisation policy so teams must assess and provide the wider cost
implications of cannibalisations and refer cannibalisation decisions to a more senior
officer if they may have significant wider cost implications.
24.
The Department acknowledged that cannibalisation occurred across all the Armed
Forces.
It described cannibalisation as a recognised practice for both the Army and
the Royal Air Force when all other supply options had been exhausted. However, the
Department was unable to provide the Committee with authoritative information for the
other Commands to the same level of detail as the NAO report on the Navy. It committed
to looking at the data available to make sure the lessons learnt from the report on the
Navy were applied to the same level of rigour across the other Commands.
-------------------------------------------------
Full PDF can be read here
Last edited by Little h on Fri Nov 09, 2018 4:50 pm, edited 1 time in total.
Little h
- Pelican
- Posts: 20057
- Joined: Thu Aug 09, 2018 10:10 pm
Re: National Audit Office; Equipment Cannibalisation in the Royal Navy
TU Harry & BZ.
Cutting your coat according to your cloth, robbing Peter to pay Paul and If Needs Must is all very well but eventually 'events' may catch up with us.
Cutting your coat according to your cloth, robbing Peter to pay Paul and If Needs Must is all very well but eventually 'events' may catch up with us.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- ivorthediver
- Posts: 3729
- Joined: Fri Aug 10, 2018 8:42 pm
- Location: Cambridge Shore Battery
Re: National Audit Office; Equipment Cannibalisation in the Royal Navy
First and foremost my thanks Harry for exposing this debacle and conveying the offending parties excuses and lack of commitment to offer ANY definitive Answers to the problem they have caused by their actions and the risks they have placed service personal in unnecessarily
Secondly ......as always ....a well presented and balanced post showing
"The Problem unearthed"
"The Known Facts "
"The offenders response"
"The lack of positive feedback Offered"
The more I learn and what I already know of you, the happier I am that we have not crossed swords and respect your background .........and if I were unfortunate enough to disagree with you on anything important , I would try to make bloody sure of my facts
Secondly ......as always ....a well presented and balanced post showing
"The Problem unearthed"
"The Known Facts "
"The offenders response"
"The lack of positive feedback Offered"
The more I learn and what I already know of you, the happier I am that we have not crossed swords and respect your background .........and if I were unfortunate enough to disagree with you on anything important , I would try to make bloody sure of my facts
"What Ever Floats your Boat"