General Naval Topics
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Sir Humphrey
Fascinating read on IUSS in the Pacific.
The Royal Navy is heavily involved in the Atlantic equivalent, with USN websites showing dozens of UK personnel are based at its East Coast HQ.
U.S. revives Cold War submarine spy program to counter China
The U.S. Navy is carrying out the biggest overhaul of its top-secret undersea surveillance network since the 1950s as China’s naval power surges and new technologies are fast reshaping maritime warfare. Beijing has similar plans of its own
Continues at - https://www.reuters.com/investigates/sp ... ce=twitter
Fascinating read on IUSS in the Pacific.
The Royal Navy is heavily involved in the Atlantic equivalent, with USN websites showing dozens of UK personnel are based at its East Coast HQ.
U.S. revives Cold War submarine spy program to counter China
The U.S. Navy is carrying out the biggest overhaul of its top-secret undersea surveillance network since the 1950s as China’s naval power surges and new technologies are fast reshaping maritime warfare. Beijing has similar plans of its own
Continues at - https://www.reuters.com/investigates/sp ... ce=twitter
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
An interesting view heard at DSEI 2023
MoD should cancel Tempest/GCAP before it eats the defence budget.
Instead should develop an "F-35UK" based on the proven airframe but add British content such as advanced radars, weapons and its own loyal wingman UAS.
Affordable, achievable and would still sustain aerospace industry.
MoD should cancel Tempest/GCAP before it eats the defence budget.
Instead should develop an "F-35UK" based on the proven airframe but add British content such as advanced radars, weapons and its own loyal wingman UAS.
Affordable, achievable and would still sustain aerospace industry.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Another article demonstrating the overall situation of current R.N. - M.O.D. hence posted here rather on the RN Submarine Section of the site.
Royal Navy nuclear deterrent submarines conducting increasingly long patrols
On 11th September a Vanguard-class submarine returned home to Faslane following a patrol lasting 195 days. Here we look at the background and implications of these extended periods at sea.
Home from the deep
As the submarine headed up the Clyde it was observed she was covered in marine growth to such an extent that had not been seen before. This is believed to be the second longest patrol by a RN deterrent submarine and the build up of algae and barnacles is possible because SSBNs remain undetected by spending the majority of their time on patrol at very slow speed. This is to minimise their noise signature and once in their assigned waterspace, are not having to go anywhere in particular. This level of biofouling may also suggest she could have been operating in either shallower or warmer waters than is usual.
In recognition of an exceptional patrol, the boat was welcomed home by the First Sea Lord and the Deputy Prime Minister although official coverage made no mention of the fact her crew had spent more than 6 months underwater. This itself represents something of a heroic achievement and the crew should be recognised for their sacrifice. From a more pragmatic perspective, it must be accepted that this comes with a significant cost to a lot of people, not just the submariners but their friends and families as well as longer-term impacts.
Continues at - https://www.navylookout.com/royal-navy- ... RjHBrU84Dc
Royal Navy nuclear deterrent submarines conducting increasingly long patrols
On 11th September a Vanguard-class submarine returned home to Faslane following a patrol lasting 195 days. Here we look at the background and implications of these extended periods at sea.
Home from the deep
As the submarine headed up the Clyde it was observed she was covered in marine growth to such an extent that had not been seen before. This is believed to be the second longest patrol by a RN deterrent submarine and the build up of algae and barnacles is possible because SSBNs remain undetected by spending the majority of their time on patrol at very slow speed. This is to minimise their noise signature and once in their assigned waterspace, are not having to go anywhere in particular. This level of biofouling may also suggest she could have been operating in either shallower or warmer waters than is usual.
In recognition of an exceptional patrol, the boat was welcomed home by the First Sea Lord and the Deputy Prime Minister although official coverage made no mention of the fact her crew had spent more than 6 months underwater. This itself represents something of a heroic achievement and the crew should be recognised for their sacrifice. From a more pragmatic perspective, it must be accepted that this comes with a significant cost to a lot of people, not just the submariners but their friends and families as well as longer-term impacts.
Continues at - https://www.navylookout.com/royal-navy- ... RjHBrU84Dc
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
The Success of Carrier Strike Versus The Lack of Understanding in the Media
The two most important parts of this have been the QEC hulls and the F35. There has been a lengthy gestation period, with the ships announced in 1998 as a requirement, QE entering construction in 2009 and entering service in 2017. This marked the completion of construction, but equally the beginning of a lengthy period of trials and integration – you cannot just operate an aircraft carrier from the outset. You need to understand performance, limitations (particularly for weather) and how the ship works and bring this together to ensure that the ship works, is functional and is safe for operations in all respects. This took several years to do, collecting data, understanding what it meant and where necessary making changes.
At the same time the F35 programme, which also has its gestation in the early 1990s was taking time to deliver, with the UK and other operators working to develop the design, bring it into service and ensure that the aircraft type was capable of operating to the required standard. Again, this is an incredibly complex programme that involves multiple nations working together to introduce a genuinely world beating aircraft into service – this isn’t something you do overnight.
The plan for the UK has always been to manage the introduction of these capabilities over a period of many years, making sure they work, that they deliver what is needed of them and that the full range of required capabilities is installed and works. The current UK estimate is that this point will be reached in 2026 when Carrier Strike meets its so-called ‘Full Operating Capability’ (FOC) – namely the point when the integrated set of systems are fully delivered, work as intended and meet the requirements. It will have taken nearly 10 years hard work to get here, precisely because these systems are so complex and need time to get right. This sounds a long time (and it is), but in the context of the carrier strike lifecycle, it represents less than 10% of the planned lifetime of the QEC in UK service. This is about delivering a capability fit for use into the 2060s, not just for the 2020s.
Continues at - https://thinpinstripedline.blogspot.com ... us_22.html
The two most important parts of this have been the QEC hulls and the F35. There has been a lengthy gestation period, with the ships announced in 1998 as a requirement, QE entering construction in 2009 and entering service in 2017. This marked the completion of construction, but equally the beginning of a lengthy period of trials and integration – you cannot just operate an aircraft carrier from the outset. You need to understand performance, limitations (particularly for weather) and how the ship works and bring this together to ensure that the ship works, is functional and is safe for operations in all respects. This took several years to do, collecting data, understanding what it meant and where necessary making changes.
At the same time the F35 programme, which also has its gestation in the early 1990s was taking time to deliver, with the UK and other operators working to develop the design, bring it into service and ensure that the aircraft type was capable of operating to the required standard. Again, this is an incredibly complex programme that involves multiple nations working together to introduce a genuinely world beating aircraft into service – this isn’t something you do overnight.
The plan for the UK has always been to manage the introduction of these capabilities over a period of many years, making sure they work, that they deliver what is needed of them and that the full range of required capabilities is installed and works. The current UK estimate is that this point will be reached in 2026 when Carrier Strike meets its so-called ‘Full Operating Capability’ (FOC) – namely the point when the integrated set of systems are fully delivered, work as intended and meet the requirements. It will have taken nearly 10 years hard work to get here, precisely because these systems are so complex and need time to get right. This sounds a long time (and it is), but in the context of the carrier strike lifecycle, it represents less than 10% of the planned lifetime of the QEC in UK service. This is about delivering a capability fit for use into the 2060s, not just for the 2020s.
Continues at - https://thinpinstripedline.blogspot.com ... us_22.html
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Adm. Sir Antony Radakin, the professional head of the United Kingdom’s military, spoke with Ryan about the future of the British military, the plans for global force presence and the status of AUKUS.
https://warontherocks.com/2023/09/a-cha ... m-radakin/
https://warontherocks.com/2023/09/a-cha ... m-radakin/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
-
Brian James
- Posts: 13231
- Joined: Sun Aug 12, 2018 6:58 am
Re: General Naval Topics
Thanks Jim..that's a start..B.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
MoD confirm plans for 19 frigates and destroyers
In a recent exchange in Parliament, concerns regarding the size of the Royal Navy’s future escort fleet arose.
Yet, an omission in this dialogue has brought forward more questions than answers.
See - https://ukdefencejournal.org.uk/mod-con ... BaJxFhXHeU
In a recent exchange in Parliament, concerns regarding the size of the Royal Navy’s future escort fleet arose.
Yet, an omission in this dialogue has brought forward more questions than answers.
See - https://ukdefencejournal.org.uk/mod-con ... BaJxFhXHeU
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Issues addressed post F-35B Lightning incident
The Ministry of Defence has provided clarity on the measures taken in response to the Service Inquiry into the loss of the F-35B Lightning ZM152 (BK-18) of 617 Squadron in November 2021.
The aircraft was embarked on HMS Queen Elizabeth when the unfortunate incident occurred.
According to the inquiry’s findings, there were concerns about the 617 Squadron as it “was under strength, morale was low, there were insufficient Quality Assurance checks being conducted at Marham and general readiness for FORTIS was lower than COMUKCSG had been led to believe.”
In an official response, Baroness Goldie, Minister of State, Ministry of Defence, commented on the corrective actions taken. “As a direct result of the lessons identified during and post Operation FORTIS, embarked engineering workforce levels were significantly increased, in recognition of the additional workload and fatigue associated with embarked operations.”
She further highlighted that since the incident, “RAF Marham has been subject to two external third-party audits, with the most recent concluding that previously identified shortfalls had been resolved, or that appropriate corrective action plans were in place.”
To ensure continued adherence to quality and safety standards, “the unit maintains a full internal quality audit programme with regular continuous-improvement events and independent engineering standard evaluations.”
Baroness Goldie stressed that they are continually monitoring and optimising the readiness for embarked operations, ensuring that any issues are addressed in regular “Carrier Strike multi-disciplinary meetings.”
Source UKDJ
The Ministry of Defence has provided clarity on the measures taken in response to the Service Inquiry into the loss of the F-35B Lightning ZM152 (BK-18) of 617 Squadron in November 2021.
The aircraft was embarked on HMS Queen Elizabeth when the unfortunate incident occurred.
According to the inquiry’s findings, there were concerns about the 617 Squadron as it “was under strength, morale was low, there were insufficient Quality Assurance checks being conducted at Marham and general readiness for FORTIS was lower than COMUKCSG had been led to believe.”
In an official response, Baroness Goldie, Minister of State, Ministry of Defence, commented on the corrective actions taken. “As a direct result of the lessons identified during and post Operation FORTIS, embarked engineering workforce levels were significantly increased, in recognition of the additional workload and fatigue associated with embarked operations.”
She further highlighted that since the incident, “RAF Marham has been subject to two external third-party audits, with the most recent concluding that previously identified shortfalls had been resolved, or that appropriate corrective action plans were in place.”
To ensure continued adherence to quality and safety standards, “the unit maintains a full internal quality audit programme with regular continuous-improvement events and independent engineering standard evaluations.”
Baroness Goldie stressed that they are continually monitoring and optimising the readiness for embarked operations, ensuring that any issues are addressed in regular “Carrier Strike multi-disciplinary meetings.”
Source UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
Two retired Royal Navy minehunters will contribute to NATO’s mission supporting global security in the Black Sea with the Romanian Navy.
Sandown-class Mine Counter Measure Vessels, HMS Blyth and HMS Pembroke, have been sold to Romania, one of the UK’s NATO allies, by the Defence Equipment Sales Authority (DESA), which disposes of vehicles and equipment no longer needed by UK Armed Forces.
On behalf of Navy Command, the Ships Support team at Defence Equipment and Support (DE&S) have been working with Babcock to refurbish the minehunters before they are transferred to their new owners.
The Royal Navy will provide individual operator and maintainer training via Navy International Defence Training (IDT), and collective training via Fleet Operational Sea Training (FOST).
Continues at - https://www.royalnavy.mod.uk/news-and-l ... broke-sold
Sandown-class Mine Counter Measure Vessels, HMS Blyth and HMS Pembroke, have been sold to Romania, one of the UK’s NATO allies, by the Defence Equipment Sales Authority (DESA), which disposes of vehicles and equipment no longer needed by UK Armed Forces.
On behalf of Navy Command, the Ships Support team at Defence Equipment and Support (DE&S) have been working with Babcock to refurbish the minehunters before they are transferred to their new owners.
The Royal Navy will provide individual operator and maintainer training via Navy International Defence Training (IDT), and collective training via Fleet Operational Sea Training (FOST).
Continues at - https://www.royalnavy.mod.uk/news-and-l ... broke-sold
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20059
- Joined: Thu Aug 09, 2018 10:10 pm
Re: General Naval Topics
DIVERSITY & INCLUSION
Unleashing the power of diversity
Our people are at the heart of the Naval Service capability and are paramount to delivering operational effectiveness. Our leaders harness the unique and diverse contribution of every member in their team. We empower all our people, by respecting and valuing what makes them different.
Encouraging and promoting differences in our backgrounds and experience makes us a healthier and stronger fighting force. Our operational effectiveness is delivered by the right mix of capable and motivated people that reflect the breadth of society we exist to defend, now and in the future.
Continues at - https://www.royalnavy.mod.uk/our-people ... -inclusion
Sir Humphrey ofpinstripedline coments:
"Royal Navy makes reasonable effort to ensure personnel are treated with basic inclusivity and respect.
Unsurprisingly 'Alan 'did I tell you I was First Sea Lord' West is upset."
See - https://www.telegraph.co.uk/news/2023/0 ... privilege/
Unleashing the power of diversity
Our people are at the heart of the Naval Service capability and are paramount to delivering operational effectiveness. Our leaders harness the unique and diverse contribution of every member in their team. We empower all our people, by respecting and valuing what makes them different.
Encouraging and promoting differences in our backgrounds and experience makes us a healthier and stronger fighting force. Our operational effectiveness is delivered by the right mix of capable and motivated people that reflect the breadth of society we exist to defend, now and in the future.
Continues at - https://www.royalnavy.mod.uk/our-people ... -inclusion
Sir Humphrey ofpinstripedline coments:
"Royal Navy makes reasonable effort to ensure personnel are treated with basic inclusivity and respect.
Unsurprisingly 'Alan 'did I tell you I was First Sea Lord' West is upset."
See - https://www.telegraph.co.uk/news/2023/0 ... privilege/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.