Frigates: Miecznik Class: Type 31 Derivative
-
greendragon
- Posts: 276
- Joined: Sat Sep 14, 2019 6:16 am
Frigates: Miecznik Class: Type 31 Derivative
Just reference to the lost chance of the Adelaide frigattes.
PL DoD has signed a bill for purchasing three multipurpose frigattes .
They will be constructed in Polish yards in cooperation with the UK Babcock or a German yard.
Have seen somewhere that first one will be built abroad and two more in Pl.
gd
PL DoD has signed a bill for purchasing three multipurpose frigattes .
They will be constructed in Polish yards in cooperation with the UK Babcock or a German yard.
Have seen somewhere that first one will be built abroad and two more in Pl.
gd
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Another milestone in the revival of warship design exports
Steel Cutting ceremony in Gdynia today for first of the three Miecznik frigates.
Babcockplc Arrowhead-140 derivative for the Polish Navy.
See - https://twitter.com/NavyLookout/status/ ... 8372220995
Steel Cutting ceremony in Gdynia today for first of the three Miecznik frigates.
Babcockplc Arrowhead-140 derivative for the Polish Navy.
See - https://twitter.com/NavyLookout/status/ ... 8372220995
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Developing the Type 31 frigategreendragon wrote: ↑Mon Feb 28, 2022 8:54 am Just reference to the lost chance of the Adelaide frigattes.
PL DoD has signed a bill for purchasing three multipurpose frigattes .
They will be constructed in Polish yards in cooperation with the UK Babcock or a German yard.
Have seen somewhere that first one will be built abroad and two more in Pl.
gd
To some extent, the capability of the Royal Navy’s Type 31 frigate cannot be fully appreciated without understanding the background to its development. Public perception has perhaps been over-focused on cost and initial armament, obscuring what has been achieved. In this article, we look at the procurement process and design philosophy that underpins the project.Continues at - https://www.navylookout.com/developing- ... 1-frigate/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
-
greendragon
- Posts: 276
- Joined: Sat Sep 14, 2019 6:16 am
Re: Frigates: Miecznik Class: Type 31 Derivative
Thanks for the link.
It is very interesting article.
As for the PLN it is very good that the experienced designer and builder like Babcock is chosen for he Polish frigates building program.
gd
It is very interesting article.
As for the PLN it is very good that the experienced designer and builder like Babcock is chosen for he Polish frigates building program.
gd
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Latest Details on Poland’s Miecznik Frigate Program
During the MSPO fair in Kielce (3rd-6th September), the PGZ-MIECZNIK consortium presented the status of the program for the construction of three Miecznik-class frigates for the Polish Navy. On this occasion, new details on the technical innovations of the platform and its combat system were revealed.
According to statements by representatives of the consortium, work on the future ORP Wicher is progressing on schedule, and will not be adjusted for the time being.
To date, the first 300-ton mega block has been built, has already been brought out of the hall, and is being painted (as of early September). The upper part of the mega block is expected to be ready by the end of the first quarter of 2025, and the stern mega block will be built by the end of June next year. The bow mega block is being produced by a subcontractor.
Continues https://www.navalnews.com/naval-news/20 ... e-program/
During the MSPO fair in Kielce (3rd-6th September), the PGZ-MIECZNIK consortium presented the status of the program for the construction of three Miecznik-class frigates for the Polish Navy. On this occasion, new details on the technical innovations of the platform and its combat system were revealed.
According to statements by representatives of the consortium, work on the future ORP Wicher is progressing on schedule, and will not be adjusted for the time being.
To date, the first 300-ton mega block has been built, has already been brought out of the hall, and is being painted (as of early September). The upper part of the mega block is expected to be ready by the end of the first quarter of 2025, and the stern mega block will be built by the end of June next year. The bow mega block is being produced by a subcontractor.
Continues https://www.navalnews.com/naval-news/20 ... e-program/
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Navy Lookout
The impressively-equipped
Polish Miecznik Arrowhead 140/Type 31 frigate variant.
https://youtube.com/watch?v=vv9QR9WmLP4
The impressively-equipped
https://youtube.com/watch?v=vv9QR9WmLP4
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Navy Lookout
Latest article:
Miecznik - Poland's ambitious adaptation of the Arrowhead 140 frigate
https://buff.ly/4icTMZe
Latest article:
Miecznik - Poland's ambitious adaptation of the Arrowhead 140 frigate
https://buff.ly/4icTMZe
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
-
greendragon
- Posts: 276
- Joined: Sat Sep 14, 2019 6:16 am
Re: Frigates: Miecznik Class: Type 31 Derivative
Progress in building three frigates for the PLN is getting materialized.
The day before PLN Day first steel sheets for the will be "burned", what in PL yardsmen language here means "cut".
The project is based on the Babcock HM Arrowhead 140 design, modified to the PLN requirements.
MBDA and THALES also participate.
The first ship will be called ORP Wicher (Gale) and scheduled for launching in August 2026.
Much longer will take accommodating all the equipment, electronics and armament on the hull.
Plus tests and this makes the ship operational 2028-2030.
Two more frigates ORP Burza and ORP Huragan are planned to enter service in 2030 and 2031 respectively.
One more is due to be built and its name will be ORP Ratownik (Rescuer) SAR.
Planned to execute variety of tasks to include supporting new PLN submarins, pollicing critical infrastructure on Baltic, etc.
Project 570-II, lenght 95m, width 18,8m, 6000t, 16 kts, 6000nM range.
Launchng planned in 2027, will enter service in 2029.
The ship has this newest architecture of axe bow or even the whole forward part of hull.
Looks modern and I believe will be practical, utility ship.
Of course there is no match to and nothing of spectacular view of these modern warships comparing to so many WW2 man-of-war like bent stacks HMS Naiad , destroyers etc including even my favorite USN fourstackers !!!!
Regards
gd
The day before PLN Day first steel sheets for the will be "burned", what in PL yardsmen language here means "cut".
The project is based on the Babcock HM Arrowhead 140 design, modified to the PLN requirements.
MBDA and THALES also participate.
The first ship will be called ORP Wicher (Gale) and scheduled for launching in August 2026.
Much longer will take accommodating all the equipment, electronics and armament on the hull.
Plus tests and this makes the ship operational 2028-2030.
Two more frigates ORP Burza and ORP Huragan are planned to enter service in 2030 and 2031 respectively.
One more is due to be built and its name will be ORP Ratownik (Rescuer) SAR.
Planned to execute variety of tasks to include supporting new PLN submarins, pollicing critical infrastructure on Baltic, etc.
Project 570-II, lenght 95m, width 18,8m, 6000t, 16 kts, 6000nM range.
Launchng planned in 2027, will enter service in 2029.
The ship has this newest architecture of axe bow or even the whole forward part of hull.
Looks modern and I believe will be practical, utility ship.
Of course there is no match to and nothing of spectacular view of these modern warships comparing to so many WW2 man-of-war like bent stacks HMS Naiad , destroyers etc including even my favorite USN fourstackers !!!!
Regards
gd
You do not have the required permissions to view the files attached to this post.
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Miecznik – Poland’s ambitious adaptation of the Arrowhead 140 frigate
Overview
The new generation of warships will be highly capable, multi-role frigates designed to replace the Oliver Hazard Perry-class frigates currently in service with the Polish Navy. The Miecznik first-of-class, ORP Wicher (Gale), is under construction in Gdynia and due to be launched in 2026. Two further ships ORP Burza (Storm) and ORP Huragan (Hurricane) are on order and the Polish Navy has an option with Babcock to build a further 5 ships.
The AH140 is derived from the Iver Huitfeldt-class of the Royal Danish Navy, a design that has already proven itself as a cost-effective, capable warship. Its modular structure and spacious layout allow for extensive combat system integration. The base platform is relatively simple, but its flexibility provides significant potential for adaptation to specific operational needs. While the general specifications for Poland’s new warships align with the role of a multi-purpose frigate, the Polish Navy has placed particular emphasis on Anti-Air Warfare (AAW) and Anti-Submarine Warfare (ASW).
Continues https://www.navylookout.com/miecznik-po ... 0-frigate/
Overview
The new generation of warships will be highly capable, multi-role frigates designed to replace the Oliver Hazard Perry-class frigates currently in service with the Polish Navy. The Miecznik first-of-class, ORP Wicher (Gale), is under construction in Gdynia and due to be launched in 2026. Two further ships ORP Burza (Storm) and ORP Huragan (Hurricane) are on order and the Polish Navy has an option with Babcock to build a further 5 ships.
The AH140 is derived from the Iver Huitfeldt-class of the Royal Danish Navy, a design that has already proven itself as a cost-effective, capable warship. Its modular structure and spacious layout allow for extensive combat system integration. The base platform is relatively simple, but its flexibility provides significant potential for adaptation to specific operational needs. While the general specifications for Poland’s new warships align with the role of a multi-purpose frigate, the Polish Navy has placed particular emphasis on Anti-Air Warfare (AAW) and Anti-Submarine Warfare (ASW).
Continues https://www.navylookout.com/miecznik-po ... 0-frigate/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
- Pelican
- Posts: 20046
- Joined: Thu Aug 09, 2018 10:10 pm
Re: Frigates: Miecznik Class: Type 31 Derivative
Navy Lookout
The bow section of first Polish Miecznik (Type 31) frigate ORP Wicher was delivered from the CRIST S.A. shipyard to the PGZ construction hall in Gdynia this week.
The ship is due to be delivered to the Polish Navy in 2029.
The bow section of first Polish Miecznik (Type 31) frigate ORP Wicher was delivered from the CRIST S.A. shipyard to the PGZ construction hall in Gdynia this week.
The ship is due to be delivered to the Polish Navy in 2029.
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.