RN Aircraft Carriers: HMS Prince of Wales

Add your posts about Royal Navy ships in this section
User avatar
ivorthediver
Posts: 3729
Joined: Fri Aug 10, 2018 8:42 pm
Location: Cambridge Shore Battery

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by ivorthediver »

Don't say I can't take a hint David ;)
"What Ever Floats your Boat"
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

FROM SAVE THE NAVY - POSTED TODAY 07.12.2020

One of the reasons the Royal Navy needs two aircraft carriers – a setback for HMS Prince of Wales

While alongside in Portsmouth recently HMS Prince of Wales suffered at least one major internal flood incident causing damage to the high voltage electrical system that propels the ship. The Sun newspaper has now gone public with the story and it appears the ship will not sail until Spring 2021 at the earliest.

HMS Prince of Wales returned to Portsmouth on 25th March after completing sea trials, a visit to Liverpool and a training period around the UK but has not put to sea since. She underwent the first of her planned Capability Insertion Periods (CIP) over the summer but was due to sail sometime in the autumn to conduct further helicopter trials and training. The ship was due to leave for the Westlant 2021 deployment to the coast of the US in the new year, where she was scheduled to conduct her first F-35 landing.

Internal flooding on ships is not a new phenomenon. Warships have a high-pressure saltwater main which is available for firefighting. There is also piping that carries water to cool engines and electronic equipment. The amount of damage caused by a burst pipe or valve failure very much depends on where in the ship it occurs and how long it takes the ship’s company to isolate the leak and pump out the compartments. HMS Queen Elizabeth suffered a fairly serious internal leak in July 2019 which required an immediate return to port but the damage was contained and repaired without significantly impacting her programme. QE also had a very minor issue with leaking shaft seals in December 2017 which many media outlets blew out of all proportion.


In the case of HMS Prince of Wales, it would appear that the flooding was much more serious because it affected the machinery spaces. Photos that emerged in October show compartments flooded quite deep in places. The QEC carriers are propelled by electric motors with high voltage power supplied from diesels and gas turbine generators through a complex system of converters, switchboards and cabling. As warships have increasingly come to rely on electric propulsion, the hazards of high voltages can make damage control more complex and dangerous. Fortunately, the flood did not occur at sea with the engines running and the HV system was probably not in use. However, if elements of the electrical system were submerged in saltwater then it will require stripping out and replacing which will be costly and time-consuming.

The immediate consequences to the ship’s programme are obvious but the RN says the PoW is still on track to being declared fully operational in 2023. The benefit of having two aircraft carriers is immediately obvious, sod’s law always applies and the unexpected can happen. HMS Queen Elizabeth is unaffected and will become the RN flagship next year and lead the landmark first carrier strike deployment. HMS Prince of Wales’ training and work up programme may have to be more compressed in order to make up for the lost time. It is unclear if the RN will be liable for the costs of the repair but it would seem the contractor (The Aircraft Carrier Alliance) is likely to be responsible for making good if the cause was faulty pipework and not human error.

The RN cannot be expected to give a public running commentary on every breakdown, opdef or minor issue that occurs. These type of problems happen in every navy in the world, however, the aircraft carriers have a particularly high profile and there is no lack of official coverage of their successes. In this case, involving a more serious incident, the Ministry of Defence should perhaps have allowed the RN to admit the flood and provide some detail about the cause and their response. This would help build public trust in their messaging and reduce the embarrassment when it inevitably became public. It was obvious that eventually, journalists would notice the ship had not sailed for months and begin asking questions. Predictably the mainstream media are now reporting the situation in more sensationalist terms than if a calm official explanation had been provided at the time.

We were made aware that all was not well some time ago and asked for details from official sources but they refused to comment. When trying to promote the RN it is always a difficult line to tread between telling the good stories while being honest about serious problems. We are not in the business of publishing ‘scoops’ that might get us attention but cause repetitional damage to the RN and with no official confirmation, decided not to go public.


From the Sun
UP SHIP CREEK Navy’s new £3bn aircraft carrier HMS Prince of Wales stranded for six months after second flood blows electrics

THE Navy’s newest aircraft carrier will be stranded another six months after a second flood blew electrics.

HMS Prince of Wales was due to sail to the US to train with F-35 jets.

But the £3.1billion vessel has been banned from leaving Portsmouth on safety grounds until spring, a year after she last sailed.

The flood was caused by a burst fire main.

Thousands of gallons of sea water poured into an engine room and submerged electrical cabinets for over 24 hours.

Miles of cables are being assessed.

The 1,000ft ship, the Navy’s biggest, relies on electricity produced by diesel engines and gas turbines to turn 33-ton propellers.

A source said: “It’s embarrassing. The America trip took years of planning and we’ve had to say we can’t come.

"It will take months to repair the damage. Costs will run to millions.”

In May a video emerged showing water pouring through a ceiling into a living quarters.

The Navy said that was a minor issue.

For short video and photos go to:
https://www.thesun.co.uk/news/13400921/ ... -stranded/
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

Photo attached to the Save the Navy article above.
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

Savetheroyalnavy.org

HMS Prince of Wales will not be going to the US next year on Westlant21 deployment as planned.
It was supposed to include the first landing of F-35 and further SRVL developmental flying.
Repairs to flood damage ongoing (presumably paid for by ACA) and will save £2M by deploying closer to UK.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

HMS Prince of Wales

Today is a mixed emotions day for HMSPWLS.
79 years since the battleship HMS Prince of Wales & battlecruiser HMS Repulse were sunk but also 1 year since we raised the White Ensign and commissioned into the RoyalNavy.

Photos at - https://twitter.com/HMSPWLS/status/1337 ... 74/photo/1
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

P.O.W.

Wholeship sea survival training this morning, including lifejackets, survival suits and the marine evacuation system.
Important knowledge that we must maintain in preparation for our return to sea.
4 Photos of the gear here: https://twitter.com/HMSPWLS/status/1371 ... 45/photo/1
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

HMS Prince of Wales

In preparation for returning to sea, our aircraft handling team have been refreshing their skills using the facilities available at HMS Sultan

See:
https://twitter.com/HMSPWLS/status/1375 ... 10/photo/1
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

HMS Prince of Wales to return to operations shortly
March 26, 20211
It has been confirmed that the aircraft carrier “will be ready” for her planned return to operations by May this year.

In May 2020, Prince of Wales experienced flooding which the Royal Navy described (at the time) as “minor”.

This was followed by more “significant” flooding in October 2020 which caused damage to her electrical cabling. The damage was so bad that the ship was unable to sail to America for training.

She is currently alongside in Portsmouth unable to deploy until repairs are completed.

Minister for Defence Procurement Jeremy Quin confirmed the costs of the works in response to a written Parliamentary question from the Labour MP for Portsmouth South, Stephen Morgan.

“The estimated incremental cost of the repair work is £3.3 million. Remedial work being conducted on both Queen Elizabeth-class carriers to help prevent a repetition of this event is expected to cost £2.2m.”

When will the vessel be ready for operations?
James Heappey, The Parliamentary Under-Secretary of State for Defence, recently stated:

“I can confirm that HMS PRINCE OF WALES will be ready for her planned return to operations by May 2021, when she will undertake activities in UK waters prior to her commencing NATO Command duties in 2022.”

From: UKDJ
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
User avatar
Pelican
Posts: 20059
Joined: Thu Aug 09, 2018 10:10 pm

Re: RN Aircraft Carriers: HMS Prince of Wales

Unread post by Pelican »

'BOW PARTY'


Fleet Commander
VAdm Jerry Kyd
Now here is a brave person doing a fine job cleaning the bow of HMS PRINCE OF WALES.
You do not have the required permissions to view the files attached to this post.
HMS Pelican 1938 - 1958 GGCV L86 U86 F86 What I Have I Hold ~ A wonderful bird is the Pelican its beak can hold more than its belly can.
Post Reply Previous topicNext topic

Return to “Royal Navy”